# Building permits at 2515 Leon St, Austin, TX

15 permits on record here. The newest, Sep 14: 2026/09/18 - 2026/09/20 2026/09/26 - 2026/09/27 | Parents Weekend Gathering and Tailgate at the Kappa Alpha. Within a quarter mile, the city has issued 2 more permits since May 1. One is for a new building, 280 ft away.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 14, 2026 | New building | 2026/09/18 - 2026/09/20 2026/09/26 - 2026/09/27 \| Parents Weekend Gathering and Tailgate at the Kappa Alpha Order house from 09/18/26 - 09/20/26 - Parents Wknd 09/18/26 18:00 - 09/19/26 2:00 - Parents Tailgate 09/19/26 14:00 - 09/20/26 02:00 Jimmy Buffet Party Social Gathering at the Kappa Alpha Ord | Not listed | [2026-120381 BP](https://nearbypermits.com/austin/permit/2026-120381%20BP/) |
| Sep 14, 2026 | New building | 2026/09/18 - 2026/09/20 2026/09/26 - 2026/09/27 \| Parents Weekend Gathering and Tailgate at the Kappa Alpha Order house from 09/18/26 - 09/20/26 - Parents Wknd 09/18/26 18:00 - 09/19/26 2:00 - Parents Tailgate 09/19/26 14:00 - 09/20/26 02:00 Jimmy Buffet Party Social Gathering at the Kappa Alpha Ord | Not listed | [2026-120372 BP](https://nearbypermits.com/austin/permit/2026-120372%20BP/) |
| Mar 12, 2026 | New building | 2026/02/20 - 2026/02/28 \| (2026/02/19) \| Moms weekend consisting of members and their moms gathering. March madness consists of an event themed for the NCAA march madness tournament. #Greek | Not listed | [2026-022240 BP](https://nearbypermits.com/austin/permit/2026-022240%20BP/) |
| Feb 25, 2026 | New building | 2026/02/20 - 2026/02/28 \| (2026/02/19) \| Moms weekend consisting of members and their moms gathering. March madness consists of an event themed for the NCAA march madness tournament. #Greek | Not listed | [2026-022229 BP](https://nearbypermits.com/austin/permit/2026-022229%20BP/) |
| Oct 24, 2025 | New building | 2025/10/31 - 2025/11/08 \| Three events over a 7 day time frame (10/31 - 11/7) first Haunted Manor is a smaller build party with two platforms connected via a walkway several facades and various other small decorations. The next day (11/1) will be our alumni weekend tailgate for the UT vs Vanderbilt  | Not listed | [2025-138052 BP](https://nearbypermits.com/austin/permit/2025-138052%20BP/) |
| Apr 17, 2024 | New building | 2024/04/20 -KA Barnyard will take place on April 20th with live music outside on a stage from 2 PM - 6 PM. Set up will take place April 20th with tear down April 21st. | Not listed | [2024-044258 BP](https://nearbypermits.com/austin/permit/2024-044258%20BP/) |
| Nov 27, 2023 | New building | several individual small builds | Not listed | [2023-148886 BP](https://nearbypermits.com/austin/permit/2023-148886%20BP/) |
| Nov 18, 2022 | New building | Section 6 tunnel 740 SQ. FT. Of event entry with 8 foot walls no roof walls to be covered with igntion resistant materials approved by afd. Not a primary required egress minimum width 3 feet section 4 the pond 950 square feet one point of egress maximum occupancy 49. Final approval pending on afd de | Not listed | [2022-168316 BP](https://nearbypermits.com/austin/permit/2022-168316%20BP/) |
| Nov 29, 2021 | New building | Section 6 tunnel 740 SQ. FT. Of event entry with 8 foot walls no roof walls to be covered with igntion resistant materials approved by afd. Not a primary required egress minimum width 3 feet section 4 the pond 950 square feet one point of egress maximum occupancy 49. Final approval pending on afd de | Not listed | [2021-186459 BP](https://nearbypermits.com/austin/permit/2021-186459%20BP/) |
| Nov 6, 2019 | New building | Section 6 tunnel 740 SQ. FT. Of event entry with 8 foot walls no roof walls to be covered with igntion resistant materials approved by afd. Not a primary required egress minimum width 3 feet section 4 the pond 950 square feet one point of egress maximum occupancy 49. | Not listed | [2019-203839 BP](https://nearbypermits.com/austin/permit/2019-203839%20BP/) |
| Dec 6, 2018 | New building | Section 6 tunnel 740 SQ. FT. Of event entry with 8 foot walls no roof walls to be covered with igntion resistant materials approved by afd. Not a primary required egress minimum width 3 feet section 4 the pond 950 square feet one point of egress maximum occupancy 49. | Not listed | [2018-205012 BP](https://nearbypermits.com/austin/permit/2018-205012%20BP/) |
| Nov 2, 2018 | Alteration or repair | Interior Remodel of an Existing Kitchen in an Existing Fraternity House | Not listed | [2018-167171 BP](https://nearbypermits.com/austin/permit/2018-167171%20BP/) |
| Nov 16, 2017 | New building | Section 6 tunnel 650 SQ. FT. Of event entry with 8 foot walls no roof walls to be covered with igntion resistant materials approved by afd. Not a primary required egress minimum width 3 feet will require structual engineering report at building inspection to verify uplift and structual stability max | Not listed | [2017-143112 BP](https://nearbypermits.com/austin/permit/2017-143112%20BP/) |
| Nov 14, 2014 | New building | 5 temporary structure for an event | $1,400 | [2014-122813 BP](https://nearbypermits.com/austin/permit/2014-122813%20BP/) |
| Aug 1, 2006 | Addition | Addition (4924sf) And Interior Remodel To Existing Group Residential | $1,200,000 | [2006-020956 BP](https://nearbypermits.com/austin/permit/2006-020956%20BP/) |

## Within ¼ mi since May 1, 2026

2 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 9, 2026 | [1002 W 26th St](https://nearbypermits.com/austin/address/1002-w-26th-st/) | 280 ft NE | New building | 2026/09/19 & 2026/09/27 \| Tailgate for the UT game against UTSA and two Cabo themed special events. | Not listed | [2026-118319 BP](https://nearbypermits.com/austin/permit/2026-118319%20BP/) |
| May 4, 2026 | [910 W 25th St](https://nearbypermits.com/austin/address/910-w-25th-st/) | 550 ft SE | Alteration or repair | Fire Damage Remediation and Rebuild on 3 Floors Multiple units 210 505 506 605 606. Project will require Mechanical and Electrical Roof repaid with structural letter stucco repair and sheetrock repair. Mold remediation letter will be required. | Not listed | [2026-054450 BP](https://nearbypermits.com/austin/permit/2026-054450%20BP/) |

## Zoning requests nearby

We don't list zoning cases for Austin yet. Look them up on the city's Board of Adjustment page: https://www.austintexas.gov/boards-commissions/board/board-adjustment

## More on this street

Other addresses on Leon St with permits, nearest house number first:

- [2518 Leon St](https://nearbypermits.com/austin/address/2518-leon-st/): newest permit Jun 13, 2025
- [2502 Leon St Unit 100](https://nearbypermits.com/austin/address/2502-leon-st-unit-100/): newest permit Feb 5, 2026
- [2501 Leon St](https://nearbypermits.com/austin/address/2501-leon-st/): newest permit Mar 25, 2026
- [2400 Leon St](https://nearbypermits.com/austin/address/2400-leon-st/): newest permit Nov 15, 2024
- [2200 Leon St](https://nearbypermits.com/austin/address/2200-leon-st/): newest permit Sep 2, 2026

---
Source: Austin Development Services Department permit data (https://datahub.austintexas.gov/d/3syk-w9eu), City of Austin Development Services Department. Checked 2026-10-13 08:25 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, all 15 permits at this address and 2 nearby: https://nearbypermits.com/austin/address/2515-leon-st/
