# Building permits at 100 W Second St, Boston, MA

The biggest project within a quarter mile since May 1: a $2.5M alteration or repair at 30-40 W Third St, permitted Jul 16.

75 permits on record here. The newest, Aug 26: I will be adding six outlets. Within a quarter mile, the city has issued 37 more permits (35 projects) since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Aug 26, 2026 | Electrical | I will be adding six outlets. Four of them will be new Work. I will be adding three emergency lights at the doors and I will be relocating one ceiling fan. | $1,000 | [E1891693](https://nearbypermits.com/boston/permit/E1891693/) |
| Aug 24, 2026 | Alteration or repair | Add wall to create conference room in existing room. Scope includes minor electrical, framing and drywall. | $69,128 | [SF1890440](https://nearbypermits.com/boston/permit/SF1890440/) |
| Aug 13, 2026 | Plumbing | Emergency Repair. Unknown gas leak in the building. Need to blank off piping, pressurize, and bubble leak check and make repairs. Will coordinate with National Grid. Meter is currently red tagged by National Grid. | $10,000 | [G1886366](https://nearbypermits.com/boston/permit/G1886366/) |
| Oct 31, 2025 | Electrical | One 52 kVA generator and distribution equipment to supply vendors inside Artists for Humanity. One-day event inspection requested after 13:00 | $3,500 | [ETS1792239](https://nearbypermits.com/boston/permit/ETS1792239/) |
| Mar 24, 2025 | Alteration or repair | Erect 12x20x32" platform with ramp on 3/27/25, removal on 3/27/25. | $3,700 | [SF1699163](https://nearbypermits.com/boston/permit/SF1699163/) |
| Oct 31, 2024 | Electrical | Provide 1 x 150kW portable diesel generator (120/208V) and all outdoor rated portable electrical distribution equipment powering Sound, Lighting, Staging and Catering as needed for one day event 11/7/24. | $5,000 | [ETS1666895](https://nearbypermits.com/boston/permit/ETS1666895/) |
| Oct 26, 2023 | Electrical | Provide 1 x 150kVA diesel generator (120/208V) and any outdoor rated portable electrical distribution equipment for sound and lighting equipment for one day event. Load equipment in 10/29 inspection later in day, use on 10/30, removed on 10/31. Bart McCracken. | $5,000 | [ETS1539182](https://nearbypermits.com/boston/permit/ETS1539182/) |
| Sep 27, 2022 | Electrical | Temp generator power for film production. (And only temp generator power) set 10-3-2022 | $500 | [ETS1395889](https://nearbypermits.com/boston/permit/ETS1395889/) |
| Dec 29, 2020 | Electrical | Temp generator power for film production. (And only temp generator power) set #2 1-4-2021 | $500 | [ETS1150448](https://nearbypermits.com/boston/permit/ETS1150448/) |
| Jan 31, 2020 | Fire systems | Addition of (2) speaker/strobes on the 2nd floor. [ePlan] | $2,037 | [ALT1041092](https://nearbypermits.com/boston/permit/ALT1041092/) |
| Jan 10, 2020 | Fire systems | Addition of (2) speaker/strobes on the 2nd floor. | $2,037 | [EFA1040827](https://nearbypermits.com/boston/permit/EFA1040827/) |
| Oct 17, 2019 | Plumbing | 367800 - Artists for Humanity Gas meter connection | $1,000 | [G1013646](https://nearbypermits.com/boston/permit/G1013646/) |
| Aug 9, 2018 | Electrical | Artist for Humanity - Epicenter, Misc low voltage HVAC control wiring - SGG, 185495 | $120,000 | [ELV862139](https://nearbypermits.com/boston/permit/ELV862139/) |
| Dec 11, 2017 | Plumbing | 367800 - Artist for Humanity - Installing (2) Temp Heaters | $1,500 | [G785317](https://nearbypermits.com/boston/permit/G785317/) |
| Nov 1, 2017 | Fire systems | Installation of new FACP to accommodate existing devices and additional new devices to be installed. | $80,000 | [EFA773277](https://nearbypermits.com/boston/permit/EFA773277/) |
| Oct 31, 2017 | Plumbing | 367800 - Artist for Humanity - The Others items are Hose bibs/Wall hydrants, Domestic Water Booster Pump, Electric Hot Water Heater, Grease Trap, and grease sand oil separator. | $300,000 | [PL772720](https://nearbypermits.com/boston/permit/PL772720/) |
| Oct 31, 2017 | Plumbing | 367800 - Artist for Humanity - Installing (1) Gas Fire Water Heater and gas piping to future use | $150,000 | [G772719](https://nearbypermits.com/boston/permit/G772719/) |
| Oct 24, 2017 | Electrical | (3) story addition for new art studios and event space. | $960,000 | [E769699](https://nearbypermits.com/boston/permit/E769699/) |
| Aug 17, 2017 | Alteration or repair | Reduction in square footage. ALT542035 Fees paid on this alteration permit also. | Not listed | [A721515](https://nearbypermits.com/boston/permit/A721515/) |
| Aug 16, 2017 | Alteration or repair | Revised work description; Combine parcel I.D. #sL: 0601175000 (11,100 sq. ft.), 0601176000 ( 6,688 sq. ft.), 0601172000 (2303 sq ft), to be known as, 100 west second street; totaling 20,091 sq. ft., then, Construct An addition to the existing Artists For Humanity EpiCenter for commercial and industr | Not listed | [SF745231](https://nearbypermits.com/boston/permit/SF745231/) |
| Dec 8, 2016 | Alteration or repair | Revised work description; Combine parcel I.D. #sL: 0601175000 (11,100 sq. ft.), 0601176000 ( 6,688 sq. ft.), 0601172000 (2303 sq ft), to be known as, 100 west second street; totaling 20,091 sq. ft., then, Construct An addition to the existing Artists For Humanity EpiCenter for commercial and industr | $19,000,000 | [ALT542035](https://nearbypermits.com/boston/permit/ALT542035/) |
| May 4, 2016 | Other | Erect 15x50 tent on 5/27/16. Removal on 5/59/16. | $1,000 | [SF586870](https://nearbypermits.com/boston/permit/SF586870/) |
| Apr 29, 2016 | Grading | Five (5) exploratory test borings up to approximately 10 feet. | $3,475 | [SF585387](https://nearbypermits.com/boston/permit/SF585387/) |
| Apr 26, 2016 | Other | Erect 20x30 and 9x10 tents on 4/29/16. Removal on 5/2/16. | $1,000 | [SF583821](https://nearbypermits.com/boston/permit/SF583821/) |
| Mar 24, 2016 | Electrical | install a temporary generator and distribution for a Commercial being filmed at this location on 3/25/16 and 3/26/16 | $200 | [ETS573394](https://nearbypermits.com/boston/permit/ETS573394/) |
| Feb 9, 2016 | Electrical | Install a Temporary Generator for power to a commercial being filmed at Artists for Humanity 100 West Second Street in South Boston on 2/10/16 | $200 | [ETS561486](https://nearbypermits.com/boston/permit/ETS561486/) |
| Dec 23, 2015 | Other | Erect 16x16 tent on 12/14/15. Removal on 12/15/15 | $1,000 | [SF547234](https://nearbypermits.com/boston/permit/SF547234/) |
| Apr 22, 2015 | Other | Erect 20x30 and 9x10 tents on 4/24/15. Removal on 4/27/15. | $1,000 | [SF464237](https://nearbypermits.com/boston/permit/SF464237/) |
| Apr 18, 2014 | Other | Erect 20x30, 9x10 and 9x20 tents and 4'x 16'x 16"high platform, 8'x 20'x 24"high platform and 8'x 12'x 24" high platform on 4/25/14. Removal on 4/28/14. | $1,000 | [SF353988](https://nearbypermits.com/boston/permit/SF353988/) |
| Mar 3, 2014 | Other | Install (1) 9' x 10' and (1) 20' x 30' temporary tents on 3/5/14 and remove by 3/6/14. | $1,008 | [SF340683](https://nearbypermits.com/boston/permit/SF340683/) |
| Feb 20, 2014 | Other | Erect 20x20 tent on 2/21/14. Removal on 2/23/14. | $1,000 | [SF338104](https://nearbypermits.com/boston/permit/SF338104/) |
| Jan 28, 2014 | Other | Erect 16x16 tent on 1/31/14. Removal on 2/1/14. | $1,000 | [SF322221](https://nearbypermits.com/boston/permit/SF322221/) |
| Nov 13, 2013 | Other | Erect 20x30 and 9x30 tents on 11/18/13. Removal on 11/20/13. | $1,500 | [SF304111](https://nearbypermits.com/boston/permit/SF304111/) |
| Nov 6, 2013 | Other | Erect 20x30 and 9x10 tents on 12/5/13. Removal on 12/6/13 | $1,000 | [SF301719](https://nearbypermits.com/boston/permit/SF301719/) |
| Sep 30, 2013 | Other | Erect a temporary tent, 20 x 30, to be used as a service area on Saturday, October 26, 2013. Install Friday, October 25th and removed Monday, October 28th, 2013. | $1,375 | [SF289298](https://nearbypermits.com/boston/permit/SF289298/) |
| Sep 30, 2013 | Other | Erect a temporary tent, 20 x 30,to be used as a service are on Saturday, October 5, 2013. Install Friday, October 4th and removed Monday, October 7, 2013. | $1,375 | [SF289291](https://nearbypermits.com/boston/permit/SF289291/) |
| Aug 14, 2013 | Other | Erect 20x20 tent on 8/17/13. Removal on 8/18/13. | $1,000 | [SF274161](https://nearbypermits.com/boston/permit/SF274161/) |
| Apr 18, 2013 | Other | Erect 10x20, 20x30 and 9x10 tents on 4/26/13. Removal on 4/28/13. | $1,000 | [SF236296](https://nearbypermits.com/boston/permit/SF236296/) |
| Oct 23, 2012 | Other | Erect 20x30 and 9x10 tents on 12/6/12. Removal on 12/7/12. | $1,000 | [SF193089](https://nearbypermits.com/boston/permit/SF193089/) |
| Aug 2, 2012 | Electrical | Install Temporary 125KW generator to power one 30 ton A/C unit and four 2 Ton A/C Units for an event on Saturday August 11, 2012. After Hours Inspection required. Dave Norcott is the electrician for High Output Cell | $500 | [ETS168667](https://nearbypermits.com/boston/permit/ETS168667/) |
| Aug 2, 2012 | Electrical | Install Temporary 125KW generator to power one 30 ton A/C unit and four 2 Ton A/C Units for an event on Saturday August 4, 2012. After Hours Inspection required. Dave Norcott is the electrician for High Output Cell | $500 | [ETS168214](https://nearbypermits.com/boston/permit/ETS168214/) |
| Aug 1, 2012 | Other | Erect a temporary tent, 20x30, to be used as a service area on Saturday, August 11, 2012. Install Friday, August 10, 1012. Remove Monday, August 13, 2012. | $1,300 | [SF168029](https://nearbypermits.com/boston/permit/SF168029/) |
| Jun 25, 2012 | Other | Erect a temporary tent, size 25x25, to be used as an overflow area for a function on Wednesday, June 27, 2012. Capacity: 30 Install Wednesday June 27, 2012. Remove Thursday, June 28, 2012. | $1,050 | [SF152418](https://nearbypermits.com/boston/permit/SF152418/) |
| May 30, 2012 | Other | Erect a temporary tent, 20x 30, to be used as a service area on Saturday, June 2, 2012. Install Friday, June 1, 2012 Remove Sunday, June 3, 2012 | $1,350 | [SF144676](https://nearbypermits.com/boston/permit/SF144676/) |
| May 15, 2012 | Electrical | Install a temporary generator for a commercial at the ART Epi Center on May 16th. Generator and distro to feed Lights and A/V. Dave Norcott has been hired to get Electrical permit | $500 | [ETS141610](https://nearbypermits.com/boston/permit/ETS141610/) |
| Apr 26, 2012 | Other | Erect 20x20 and 20x30 tents on 5/4/12. Removal on 5/5/12. | $1,000 | [SF134587](https://nearbypermits.com/boston/permit/SF134587/) |
| Apr 24, 2012 | Other | Erect two (2) temporary tents, 20x30 with a 10' canopy and 25x25 to be used as a bar areas for use on Saturday, 4/28/2012. Install Friday, 4/27/12 and remove Monday, 4/30/12. | $1,150 | [SF134424](https://nearbypermits.com/boston/permit/SF134424/) |
| Apr 11, 2012 | Other | Erect temporary tent, 25x25 to be used as an overflow bar area on Saturday, April 21, 2012. Install Friday, April 20, 2012 and remove on Monday, April 23, 2012. | $950 | [SF131281](https://nearbypermits.com/boston/permit/SF131281/) |
| Dec 1, 2011 | Electrical | Install temporary truck mounted generator and power distribution for a Wedding at the Art EPI center for a wedding on Dec 3, 2011. Install on Friday DEC 2, 2011 and removal on Sat Dec 3, 2011 in the evening. David Norcott is the electrician for High Output Inc cell number Inspection on Friday Dec 2, | $500 | [ETS107990](https://nearbypermits.com/boston/permit/ETS107990/) |
| Nov 30, 2011 | Other | Erect 20x20 tent on 12/3/11. Removal on 12/4/11. | $1,000 | [SF107940](https://nearbypermits.com/boston/permit/SF107940/) |
| Nov 30, 2011 | Other | Erect 20x30 tent on 12/13/11. Removal on 12/14/11. | $1,000 | [SF107547](https://nearbypermits.com/boston/permit/SF107547/) |
| Oct 26, 2011 | Other | Erect 20x30 tent on 11/4/11 AM. Removal 11/4/11 PM. | $1,000 | [SF102651](https://nearbypermits.com/boston/permit/SF102651/) |
| Oct 25, 2011 | Other | Erect a temporary tent, 20x20, to be used as a catering area. Install Thursday November 10, 2011. Remove Monday November 14, 2011. | $850 | [SF102343](https://nearbypermits.com/boston/permit/SF102343/) |
| Oct 21, 2011 | Other | Erect 16'x 24'x 24" high stage on 10/21/11. Removal on 10/22/11. | $800 | [SF101926](https://nearbypermits.com/boston/permit/SF101926/) |
| Oct 20, 2011 | Alteration or repair | Install projecting Glass &; Steel awning over Building entrance. | $25,000 | [ALT95932](https://nearbypermits.com/boston/permit/ALT95932/) |
| Sep 19, 2011 | Other | Erect 20x20 tent on 9/23/11 AM. Removal on 9/24/11. | $1,000 | [SF95993](https://nearbypermits.com/boston/permit/SF95993/) |
| Jul 18, 2011 | Other | Erect 20x20 tent on 7/22/11. Removal on 7/23/11. | $1,000 | [SF86221](https://nearbypermits.com/boston/permit/SF86221/) |
| May 19, 2011 | Other | Erect a temporary tent, 20 x 30 with a short canopy to be used as a service area on Saturday, June 4, 2011. Install Friday June 3rd and remove on Sunday, June 5, 2011. | $1,375 | [SF77327](https://nearbypermits.com/boston/permit/SF77327/) |
| May 17, 2011 | Other | Erect two (2) temporary tents, a 20 x 30 sevice tent with a 10' canopy and a 25 x 25 tent to be used as a bar area for use on Saturday, May 21, 2011. Install Friday, May 20th and remove Sunday, May 22nd. | $2,000 | [SF77183](https://nearbypermits.com/boston/permit/SF77183/) |
| Apr 21, 2011 | Electrical | Temp. 45Kw generator for one day production event at gillette. Jerry kopoyan immedia. John schiavone electrician ready for inspection 10am 4-25-11 (grounding of generator) | Not listed | [ETS73408](https://nearbypermits.com/boston/permit/ETS73408/) |
| Jan 19, 2011 | Other | Erect 20' x 20' tent on 1/19/11. Removal on 1/20/11. | $1,000 | [SF60939](https://nearbypermits.com/boston/permit/SF60939/) |
| Dec 6, 2010 | Other | Erect 20x30 tent on 12/9/10. Removal on 12/10/10. No smoking under tent. | $1,000 | [SF53809](https://nearbypermits.com/boston/permit/SF53809/) |
| Oct 20, 2010 | Other | Erect 20x20 and 20x30 tents on 10/22/10. Removal on 10/24/10. No smoking under tents. | $1,300 | [SF47808](https://nearbypermits.com/boston/permit/SF47808/) |
| Sep 30, 2010 | Fire systems | Adding 2 relays to fire alarm system so that the "house" lights come on when fire alarm is activated due to building is a place of assembly with 200+ capacity. There is a violation/abatement on this property but I do not have the violation number. | $3,000 | [EFA44028](https://nearbypermits.com/boston/permit/EFA44028/) |
| Sep 29, 2010 | Electrical | Temporary electrical disribution for event at the Artist for Humanity Epicenter on September 30th of 2010. | $2,000 | [ETS44468](https://nearbypermits.com/boston/permit/ETS44468/) |
| Aug 19, 2010 | Electrical | Install Trailer Towed Generator and Trailer Mounted 10 Ton A/C unit for an event on Saturday August 21, 2010. Requires after hours inspection | $500 | [ETS38832](https://nearbypermits.com/boston/permit/ETS38832/) |
| Jul 20, 2010 | Other | Erect 16'x 16' tent on 7/23/10. Removal on 7/23/10 pm. No smoking under tent. | $1,000 | [SF34430](https://nearbypermits.com/boston/permit/SF34430/) |
| Jul 16, 2010 | Electrical | Temporary electrical services at the Artists for Humanity Epicenter on July 22nd of 2010. | $5,000 | [ETS34096](https://nearbypermits.com/boston/permit/ETS34096/) |
| May 27, 2010 | Electrical | Temporary power for "Boston Homes" event at the Artists for Humanity Epicenter on June 10th of 2010. | $1,200 | [ETS27622](https://nearbypermits.com/boston/permit/ETS27622/) |
| Apr 23, 2010 | Other | Erect a temporary tent, 20x20, to be used as a service tent on Wednesday, April 28, 2010. Install Wednesday 4/28/10. Remove Thursday 4/29/10. | $1,225 | [SF21829](https://nearbypermits.com/boston/permit/SF21829/) |
| Apr 13, 2010 | Other | Erect a temporary tent, 20x30, to be used as a service area for a function on Saturday, May 8, 2010. Install Friday May 7th and remove Monday, May 10th. | $1,375 | [SF20654](https://nearbypermits.com/boston/permit/SF20654/) |
| Apr 13, 2010 | Other | Erect two (2) temporary tents, a 30 x 30 and a 25 x 25, to be used as service areas for a function on april 17,&; april 24, 2010 | $2,500 | [SF20653](https://nearbypermits.com/boston/permit/SF20653/) |
| Mar 30, 2010 | Alteration or repair | Erect a temporay tent, 20x20, to be used as a service tent on Saturday, April 10, 2010. Install Friday, April 9, 2010. Remove Monday, April 12, 2010.; (k wauters g-28 lic b18895) | $1,225 | [SF19775](https://nearbypermits.com/boston/permit/SF19775/) |
| Jan 7, 2010 | Electrical | Temporary Generator for Event for weekend. Distro power for event lighting and catering | $500 | [ETS10204](https://nearbypermits.com/boston/permit/ETS10204/) |
| Dec 30, 2009 | Other | Erect 20'x 30' tent on 1/9/10. Removal on 1/10/10. No smoking under tent. | $1,000 | [SF2698](https://nearbypermits.com/boston/permit/SF2698/) |

## Within ¼ mi since May 1, 2026

37 permits in the circle. From our copy of the city's data (last 24 months).

### Next door (under 250 ft), 8 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Aug 10, 2026 | [30-40 W Third St](https://nearbypermits.com/boston/address/30--40-w-third-st/) | 220 ft S | Plumbing | Fitout of Hugo Speakeasy Restaurant space | $270,000 | [PL1882848](https://nearbypermits.com/boston/permit/PL1882848/) |
| Aug 10, 2026 | [30-40 W Third St](https://nearbypermits.com/boston/address/30--40-w-third-st/) | 220 ft S | Plumbing | Fitout of Hugo Speakeasy Restaurant space | $19,000 | [G1882852](https://nearbypermits.com/boston/permit/G1882852/) |
| Jul 29, 2026 | [105 W First St](https://nearbypermits.com/boston/address/105-w-first-st/) | 140 ft NE | Electrical | Need an inspection of the meter socket so Eversource can install new meter for EV Chargers per WO#27364467 (main electrical room) | $250 | [E1878942](https://nearbypermits.com/boston/permit/E1878942/) |
| Jul 28, 2026 | [30-40 W Third St](https://nearbypermits.com/boston/address/30--40-w-third-st/) | 220 ft S | Electrical | Wire POS cables | $6,000 | [ELV1877758](https://nearbypermits.com/boston/permit/ELV1877758/) |
| Jul 28, 2026 | [30-40 W Third St](https://nearbypermits.com/boston/address/30--40-w-third-st/) | 220 ft S | Fire systems | Install Fire alarm devices | $5,000 | [EFA1877737](https://nearbypermits.com/boston/permit/EFA1877737/) |
| Jul 28, 2026 | [30-40 W Third St](https://nearbypermits.com/boston/address/30--40-w-third-st/) | 220 ft S | Electrical | wire Restaurant for lights power and air conditioning | $606,000 | [E1877731](https://nearbypermits.com/boston/permit/E1877731/) |
| Jul 16, 2026 | [30-40 W Third St](https://nearbypermits.com/boston/address/30--40-w-third-st/) | 220 ft S | Alteration or repair | Renovate a two-story restaurant into a new concept. Scope of work incl. structural modifications to add a mezz. space, re-using the existing MEP systems w/ modifications to distribution to service the new layout &; all new finishes, furnishings and equip.;On amendment: pergolas at existing G floor + | $2,493,000 | [ALT1818046](https://nearbypermits.com/boston/permit/ALT1818046/) |
| May 26, 2026 | [18-22 W Third St](https://nearbypermits.com/boston/address/18--22-w-third-st/) | 200 ft SW | Electrical | existing main service is back feed from another meter and has been for very long. I am running new feeders to new upgraded transformer being installed by Eversource WO# 21808355 I am running 4 sets of 500 MCM copper for 1200 amps. 3 phase, 4 wire, 120/208 volts | $10,000 | [E1852478](https://nearbypermits.com/boston/permit/E1852478/) |

### This block (250 to 1,000 ft), 21 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 16, 2026 | [69-71 A St](https://nearbypermits.com/boston/address/69--71-a-st/) | 470 ft SW | Alteration or repair | CIEE Interior demolition as setup for new interior buildout. No Structural, Fire Alarm or Fire Protection work. All life safety System to remain active. All work n full compliance with 780 CMR, 527 CMR, 521 CMR. | $16,700 | [SF1901541](https://nearbypermits.com/boston/permit/SF1901541/) |
| Sep 4, 2026 | [135-143 W Third St](https://nearbypermits.com/boston/address/135--143-w-third-st/) | 940 ft SE | Alteration or repair | Air seal and insulate attic. | $3,000 | [SF1897235](https://nearbypermits.com/boston/permit/SF1897235/) |
| Aug 27, 2026 | [36 A St](https://nearbypermits.com/boston/address/36-a-st/) | 930 ft SW | Plumbing | For unit 3E, Replacing boiler with 199K BTU combi boiler and all associated plumbing work. | $5,000 | [PL1894581](https://nearbypermits.com/boston/permit/PL1894581/) |
| Aug 27, 2026 | [36 A St](https://nearbypermits.com/boston/address/36-a-st/) | 930 ft SW | Plumbing | For unit 3E, Replacing boiler with 199K BTU combi boiler and all associated gas work. | $3,000 | [G1894588](https://nearbypermits.com/boston/permit/G1894588/) |
| Aug 12, 2026 | [135-143 W Third St](https://nearbypermits.com/boston/address/135--143-w-third-st/) | 940 ft SE | Alteration or repair | repoint brick around windows, remove and replace caulking | $6,690 | [SF1884071](https://nearbypermits.com/boston/permit/SF1884071/) |
| Jul 27, 2026 | [108 W Third St](https://nearbypermits.com/boston/address/108-w-third-st/) | 790 ft SE | Alteration or repair | Confirm occupancy of single family for a short form permit SF1771550 | Not listed | [ALT1788451](https://nearbypermits.com/boston/permit/ALT1788451/) |
| Jul 22, 2026 | [108 W Third St](https://nearbypermits.com/boston/address/108-w-third-st/) | 790 ft SE | Roofing | Remove existing roof deck, remove existing rubber roof, install new rubber roof, install new roof deck same size and location | $42,430 | [SF1874751](https://nearbypermits.com/boston/permit/SF1874751/) |
| Jul 21, 2026 | [84-90 A St](https://nearbypermits.com/boston/address/84--90-a-st/) | 350 ft W | Roofing | Front soffit roof repair | $2,500 | [SF1875102](https://nearbypermits.com/boston/permit/SF1875102/) |
| Jul 16, 2026 | [120 W Fourth St](https://nearbypermits.com/boston/address/120-w-fourth-st/) | 910 ft SW | Alteration or repair | COO1754450 issued 7/28/25 included core and shell commercial space on 3rd floor. Permit is to change occupancy from core and shell commercial to office/studio. Also included is relocating/adding sprinkler heads and fire alarm work. (other fit out work and fees under SF1799217) | $10,000 | [ALT1868553](https://nearbypermits.com/boston/permit/ALT1868553/) |
| Jul 13, 2026 | [114 W Third St](https://nearbypermits.com/boston/address/114-w-third-st/) | 850 ft SE | Alteration or repair | Installation/Replacement of (21) Full Frame Windows. Like-for-like with no structural changes. | $62,157 | [SF1870289](https://nearbypermits.com/boston/permit/SF1870289/) |
| Jul 10, 2026 | [5 Channel Center St](https://nearbypermits.com/boston/address/5-channel-center-st/) | 890 ft NE | Alteration or repair | Restorative work to the facade as directed by Building Enclosure Science. Scope includes: Joint sealant replacement, repointing, coating fire escape connections, installation of sheet flashing, reconfiguring the scupper, brick replacement, lead tee installation, lintel replacement. | $250,824 | [SF1869019](https://nearbypermits.com/boston/permit/SF1869019/) |
| Jun 30, 2026 | [36 A St](https://nearbypermits.com/boston/address/36-a-st/) | 930 ft SW | Plumbing | For unit 4E, installing a combi boiler, 199K BTU, removing old equipment and all associated plumbing work | $10,000 | [PL1862637](https://nearbypermits.com/boston/permit/PL1862637/) |
| Jun 30, 2026 | [36 A St](https://nearbypermits.com/boston/address/36-a-st/) | 930 ft SW | Plumbing | For unit 4E, installing a combi boiler, 199K BTU, removing old equipment and all associated gas work | $5,000 | [G1862642](https://nearbypermits.com/boston/permit/G1862642/) |
| Jun 25, 2026 | [148-152 Dorchester Av](https://nearbypermits.com/boston/address/148--152-dorchester-av/) | 950 ft SW | Plumbing | fixture swap on two shower valves vanity and toilet | $3,000 | [PL1864163](https://nearbypermits.com/boston/permit/PL1864163/) |
| Jun 16, 2026 | [148-152 Dorchester Av](https://nearbypermits.com/boston/address/148--152-dorchester-av/) | 950 ft SW | Electrical | En-suite bathroom receptacle, wall switches, fixture lights and circuit breakers upgrade | $1,800 | [E1860411](https://nearbypermits.com/boston/permit/E1860411/) |
| Jun 12, 2026 | [148-152 Dorchester Av](https://nearbypermits.com/boston/address/148--152-dorchester-av/) | 950 ft SW | Alteration or repair | Bathroom Remodel | $22,750 | [SF1856845](https://nearbypermits.com/boston/permit/SF1856845/) |
| Jun 8, 2026 | [169-171 W Second St](https://nearbypermits.com/boston/address/169--171-w-second-st/) | 650 ft SE | Alteration or repair | ;existing conditions. Change from Light Manufacture to single-family residence. No work. property has been a single family since 1938.; | Not listed | [ALT1838789](https://nearbypermits.com/boston/permit/ALT1838789/) |
| Jun 5, 2026 | [135-143 W Third St](https://nearbypermits.com/boston/address/135--143-w-third-st/) | 940 ft SE | Plumbing | RENOVATION: 1 3/4-bathroom in the basement. | $2,500 | [PL1858003](https://nearbypermits.com/boston/permit/PL1858003/) |
| May 19, 2026 | [86 W Third St](https://nearbypermits.com/boston/address/86-w-third-st/) | 620 ft SE | Alteration or repair | vinyl the front of the house double section roof in front of the house paint 2 small front domers. | $15,000 | [SF1850305](https://nearbypermits.com/boston/permit/SF1850305/) |
| May 18, 2026 | [135-143 W Third St](https://nearbypermits.com/boston/address/135--143-w-third-st/) | 940 ft SE | Alteration or repair | replace shower tub,replace bath floor,replace vanity and toilet | $26,800 | [SF1847895](https://nearbypermits.com/boston/permit/SF1847895/) |
| May 6, 2026 | [120 W Fourth St](https://nearbypermits.com/boston/address/120-w-fourth-st/) | 910 ft SW | Alteration or repair | Change occupancy from core & shell to pottery studio. No construction required except flooring and paint. | $4,000 | [ALT1833001](https://nearbypermits.com/boston/permit/ALT1833001/) |

### Farther (1,000 ft to ¼ mi), 8 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 23, 2026 | [159 W Third St](https://nearbypermits.com/boston/address/159-w-third-st/) | 0.24 mi SE | Plumbing | Gas furnace replacement | $7,500 | [G1902202](https://nearbypermits.com/boston/permit/G1902202/) |
| Sep 10, 2026 | [178 W Fourth St](https://nearbypermits.com/boston/address/178-w-fourth-st/) | 0.19 mi S | Plumbing | Gas furnace replacement | $2,500 | [G1887960](https://nearbypermits.com/boston/permit/G1887960/) |
| Sep 8, 2026 | [10 Channel Center St](https://nearbypermits.com/boston/address/10-channel-center-st/) | 0.20 mi NE | Plumbing | to install 1 sink and 1 water heater at 10 Channel St St | $5,000 | [PL1899183](https://nearbypermits.com/boston/permit/PL1899183/) |
| Sep 2, 2026 | [10 Channel Center St](https://nearbypermits.com/boston/address/10-channel-center-st/) | 0.20 mi NE | Electrical | Minor lighting & power renovations to 5th floor for fit-out | $10,000 | [E1896528](https://nearbypermits.com/boston/permit/E1896528/) |
| Aug 28, 2026 | [10 Channel Center St](https://nearbypermits.com/boston/address/10-channel-center-st/) | 0.20 mi NE | Alteration or repair | Facade restoration involving brick spot pointing and brick replacement along the first floor, Steal investigation requiring removal of brick couses and coating structural steel, stone pointing, Lintel replacement along first floor. | $884,000 | [SF1863504](https://nearbypermits.com/boston/permit/SF1863504/) |
| Aug 17, 2026 | [20 Gillette Pk](https://nearbypermits.com/boston/address/20-gillette-pk/) | 0.24 mi N | Other | Erect 30x50 tent on 8/21/26, removal on 8/28/26. | $2,625 | [SF1883609](https://nearbypermits.com/boston/permit/SF1883609/) |
| Jul 24, 2026 | [10 Channel Center St](https://nearbypermits.com/boston/address/10-channel-center-st/) | 0.20 mi NE | Fire systems | Interior renovation of an existing office space 5,000 sqft located on 5th floor. This project will include new office space, millwork, wall and floor finishes, and minor upgrades to the MEFP system. This will include relocating 7 sprinkler heads | $275,000 | [SF1877571](https://nearbypermits.com/boston/permit/SF1877571/) |
| May 22, 2026 | [20 Gillette Pk](https://nearbypermits.com/boston/address/20-gillette-pk/) | 0.24 mi N | Demolition | This project will include removal of a storage shed.; 10; feet by 15 feet to make room for exploratory. | $43,174 | [SF1850219](https://nearbypermits.com/boston/permit/SF1850219/) |

## More on this street

Other addresses on W Second St with permits, nearest house number first:

- [161 W Second St](https://nearbypermits.com/boston/address/161-w-second-st/): newest permit Nov 24, 2025
- [167 W Second St](https://nearbypermits.com/boston/address/167-w-second-st/): newest permit Dec 29, 2025
- [169-171 W Second St](https://nearbypermits.com/boston/address/169--171-w-second-st/): newest permit Jun 8, 2026
- [21-35 W Second St](https://nearbypermits.com/boston/address/21--35-w-second-st/): newest permit Jun 18, 2025
- [206 W Second St](https://nearbypermits.com/boston/address/206-w-second-st/): newest permit Feb 4, 2026
- [225 W Second St](https://nearbypermits.com/boston/address/225-w-second-st/): newest permit Mar 17, 2026
- [273-275 W Second St](https://nearbypermits.com/boston/address/273--275-w-second-st/): newest permit Feb 26, 2026
- [291 W Second St](https://nearbypermits.com/boston/address/291-w-second-st/): newest permit May 26, 2026
- [295 W Second St](https://nearbypermits.com/boston/address/295-w-second-st/): newest permit Feb 13, 2026
- [314-330 W Second St](https://nearbypermits.com/boston/address/314--330-w-second-st/): newest permit Oct 2, 2026

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-07 00:53 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, all 75 permits at this address and 37 nearby: https://nearbypermits.com/boston/address/100-w-second-st/