The biggest project within a quarter mile since May 1: a $22M alteration or repair at 354-364 Longwood Av, permitted Aug 10.

82 permits on record here. The newest, Jul 22: Demo and remove existing Multistack cooling system. Within a quarter mile, the city has issued 131 more permits (127 projects) since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Jul 22, 2026 | Electrical | Demo and remove existing Multistack cooling system. Demo and remove all associated piping, pumps, controls and electrical. Install new cooling system with cooling tower, chiller, pumps, all associated piping, controls, insulation, startup and balancing. Associated craning and rigging with install. | $1,800,000 | [SF1870506](https://nearbypermits.com/boston/permit/SF1870506/) |
| Jun 17, 2026 | Fire systems | Replace existing fire alarm panels & initiating devices. Existing audio / visual devices to remain. This is required due to current manufacturer being out of business and parts / software support not available. | $627,500 | [ALT1857290](https://nearbypermits.com/boston/permit/ALT1857290/) |
| Jun 2, 2026 | Other | Erect 60x150, 6x22 and 9x37 tents on 6/3/26, removal on 6/10/26. | $13,725 | [SF1850473](https://nearbypermits.com/boston/permit/SF1850473/) |
| May 8, 2026 | Other | Erect 30x45 tent on 5/8/26, removal on 5/10/26. | $2,350 | [SF1846974](https://nearbypermits.com/boston/permit/SF1846974/) |
| May 4, 2026 | Fire systems | Replace existing fire alarm panels & initiating devices only | $375,000 | [EFA1844957](https://nearbypermits.com/boston/permit/EFA1844957/) |
| Nov 14, 2025 | Plumbing | Installing a gas co valve system safety | $5,000 | [G1798227](https://nearbypermits.com/boston/permit/G1798227/) |
| Jul 31, 2025 | Electrical | Relocate switches and wire two bathrooms | $4,000 | [E1743438](https://nearbypermits.com/boston/permit/E1743438/) |
| Jul 9, 2025 | Electrical | Provide temporary power to graduation tent. | $3,000 | [E1730258](https://nearbypermits.com/boston/permit/E1730258/) |
| Jul 1, 2025 | Plumbing | Renovate 2 bathrooms to make handicap accessible; | $15,000 | [PL1743700](https://nearbypermits.com/boston/permit/PL1743700/) |
| May 16, 2025 | Electrical | Installation of structured cabling for the Winsor School Science Wing Renovation project | $101,000 | [ELV1721350](https://nearbypermits.com/boston/permit/ELV1721350/) |
| May 13, 2025 | Alteration or repair | Exterior Deck Renovations, Winsor School maab upgrades. | $106,100 | [SF1713917](https://nearbypermits.com/boston/permit/SF1713917/) |
| May 8, 2025 | Other | Erect 30x45 tent on 5/8/25, removal on 5/11/25. | $1,950 | [SF1714432](https://nearbypermits.com/boston/permit/SF1714432/) |
| May 8, 2025 | Other | Erect 60x150, 6x22 and 9x37 tents on 6/4/25, removal on 6/11/25. | $13,725 | [SF1714170](https://nearbypermits.com/boston/permit/SF1714170/) |
| Apr 22, 2025 | Fire systems | Modifications to existing fire alarm system due to interior renovations in the third floor science wing. Scope to include new and relocated notification devices and new modules for damper control. | $27,000 | [EFA1708393](https://nearbypermits.com/boston/permit/EFA1708393/) |
| Mar 12, 2025 | Electrical | Renovation of an existing science wing at the Winsor School | $850,000 | [E1698127](https://nearbypermits.com/boston/permit/E1698127/) |
| Jan 27, 2025 | Alteration or repair | Gut renovation of science wing to include new classrooms, offices, prep labs and associated spaces. Upgrade to existing MEP systems, including new fume hoods, exhaust fan, AHU, bathroom fixtures, etc. | $5,996,307 | [ALT1678355](https://nearbypermits.com/boston/permit/ALT1678355/) |
| Jan 14, 2025 | Electrical | installation of low voltage building automation system @ Winsor School Science Renovation | $120,650 | [ELV1682152](https://nearbypermits.com/boston/permit/ELV1682152/) |
| Dec 13, 2024 | Plumbing | Cut TW, NDHC, NDHW, NDCW & Natural Gas lines back to their mains. Install new TW branch lines to Emergency showers & eye washes, install new NDHC, NDHW, NDCW branch lines to sinks, lavoratories, water closets, purifers & install new natural gas & Vac branch lines from mains to new lab bench turrets. | $36,437 | [PL1675909](https://nearbypermits.com/boston/permit/PL1675909/) |
| Jun 4, 2024 | Electrical | Install temp power to power spider boxes in courtyard for graduation tent. | $3,000 | [E1607951](https://nearbypermits.com/boston/permit/E1607951/) |
| May 1, 2024 | Electrical | Adding 100amp temp feed. Two 50 spider boxes. | $2,000 | [E1596927](https://nearbypermits.com/boston/permit/E1596927/) |
| Apr 26, 2024 | Other | Erect 30x45 tent on 5/9/24, removal on 5/12/24. | $1,900 | [SF1592851](https://nearbypermits.com/boston/permit/SF1592851/) |
| Apr 25, 2024 | Electrical | Install 250KW natural gas generator with 800 feeder to ATS &; distribution panel in electric room | $350,000 | [E1590264](https://nearbypermits.com/boston/permit/E1590264/) |
| Mar 19, 2024 | Other | Erect 60x100, 20x40 and (2) 6x20 tents plus (2) 8x12x8" high platforms on 4/28/24, removal on 5/4/24. | $9,255 | [SF1579598](https://nearbypermits.com/boston/permit/SF1579598/) |
| Feb 12, 2024 | Plumbing | New gas line for the generator | $10,000 | [G1571530](https://nearbypermits.com/boston/permit/G1571530/) |
| Feb 6, 2024 | Other | Erect 60x150, 8x44, 8x16 and (2) 8x12 tents on 6/5/24, removal on 6/12/24. | $14,000 | [SF1564523](https://nearbypermits.com/boston/permit/SF1564523/) |
| Aug 8, 2023 | Electrical | Elevator Pit Lights electrical repairs | $1,000 | [E1511184](https://nearbypermits.com/boston/permit/E1511184/) |
| Jun 26, 2023 | Electrical | Furnish and Install power and communication conduits within existing field; Weatherproof enclosure on existing netting pole ~ 50-yard line; pull-string in all communications conduits | $30,000 | [E1486391](https://nearbypermits.com/boston/permit/E1486391/) |
| Jan 23, 2023 | Other | Erect 60x150, 8x44, 8x16 and (2) 8x12 tents on 5/31/23, removal on 6/6/23. | $12,810 | [SF1432826](https://nearbypermits.com/boston/permit/SF1432826/) |
| Jul 11, 2022 | Electrical | Renovation of space for new classroom | $30,000 | [E1350257](https://nearbypermits.com/boston/permit/E1350257/) |
| Jun 27, 2022 | Alteration or repair | Interior modification of 3 rooms into 2 with light demo | $150,000 | [ALT1318502](https://nearbypermits.com/boston/permit/ALT1318502/) |
| Mar 22, 2022 | Solar | Roof. Install 1 Roof top solar array consisting of (311) 480watt PV panels, racking and Ballast. (1) 100Kw inverter, (1) AC feeder to the roof from the Main electrical room, Utility meter and Disconnect. [ePlan] | $410,314 | [ALT1294429](https://nearbypermits.com/boston/permit/ALT1294429/) |
| Mar 14, 2022 | Other | Erect 60x150 tent on 3/21/22, removal on 6/30/22. | $23,955 | [SF1303800](https://nearbypermits.com/boston/permit/SF1303800/) |
| Feb 10, 2022 | Solar | Install new Roof top solar array consisting of 350 modules, 2 inverters, 1 200amp Ac panel and Feeder interconnected to the existing 4000amp SWBD | $410,314 | [E1290400](https://nearbypermits.com/boston/permit/E1290400/) |
| Jan 25, 2022 | Electrical | Electrical investigation and repairs post flood | $300 | [E1287898](https://nearbypermits.com/boston/permit/E1287898/) |
| Nov 22, 2021 | Electrical | Retrofit LED lighting | $13,000 | [E1270570](https://nearbypermits.com/boston/permit/E1270570/) |
| Sep 9, 2021 | Other | Erect 40x100 frame tent on 9-16-21 for Temple Israel of Boston, No Side walls | $11,742 | [SF1235716](https://nearbypermits.com/boston/permit/SF1235716/) |
| Aug 30, 2021 | Other | Erect 40x100 frame tent on 9-7-21 for Temple Israel of Boston, No Side walls | $11,742 | [SF1235710](https://nearbypermits.com/boston/permit/SF1235710/) |
| Aug 30, 2021 | Electrical | Wire (9) VFD's for motor control efficiency in Mechanical rooms for pumps | $2,700 | [E1239854](https://nearbypermits.com/boston/permit/E1239854/) |
| Aug 20, 2021 | Other | Erect 40x100 tent on 8/17/21, removal on 11/24/21. | $11,210 | [SF1236124](https://nearbypermits.com/boston/permit/SF1236124/) |
| Jun 11, 2021 | Other | Erect 9x22 and 9x62 tents on 6/2/21, removal on 6/15/21. | $1,905 | [SF1203012](https://nearbypermits.com/boston/permit/SF1203012/) |
| Jun 10, 2021 | Alteration or repair | Winsor School Art Room Chimney Removal | $80,000 | [ALT1194918](https://nearbypermits.com/boston/permit/ALT1194918/) |
| Apr 2, 2021 | Other | Erect 60x150 tent on 3/22/21, removal on 6/30/21. Tent will be used for classroom/ lunch area to provide additional area for social distancing of students. | $20,200 | [SF1170132](https://nearbypermits.com/boston/permit/SF1170132/) |
| Aug 7, 2020 | Other | Erect 80x120 tent on 8/21/20. Removal on 2/20/21. Tent will be used for additional student space for queuing, classroom, break time, as needed. | $18,240 | [SF1100250](https://nearbypermits.com/boston/permit/SF1100250/) |
| Jul 16, 2019 | Other | Erect 15x100, 40x60, 40x40, (4) 20x40, 9x20, (4) 20x20 tents on 7/19/19. Removal on 7/20/19. | $10,020 | [SF975706](https://nearbypermits.com/boston/permit/SF975706/) |
| Jun 27, 2019 | Other | Temporary stage/roof for the Boston Children's Hospital Family and Friend Festival. Stage to be installed on July 19th and removed at 7 PM on July 20, 2019. | $2,880 | [SF943004](https://nearbypermits.com/boston/permit/SF943004/) |
| May 13, 2019 | Electrical | installation of controls for walk in cooler, door heater controls and electrical defrost control | $7,300 | [E939638](https://nearbypermits.com/boston/permit/E939638/) |
| Sep 5, 2018 | Electrical | Parking lot lighting, replacing lights on 10 pole lights | $650 | [E870094](https://nearbypermits.com/boston/permit/E870094/) |
| Aug 7, 2018 | Electrical | Low voltage wiring to provide cable, install, and program (1) new S2 Network Node and (2) ACM Blades to be wall mounted in basement IDF Room 004. Cutover (3) existing card readers/keypads from Network Node located in the Boiler Room to Network Node located in IDF Room 004. | $6,000 | [ELV863512](https://nearbypermits.com/boston/permit/ELV863512/) |
| Jul 24, 2017 | Electrical | Wiring of new roof top chiller unit | $4,000 | [E734680](https://nearbypermits.com/boston/permit/E734680/) |
| Jun 20, 2017 | Alteration or repair | Masonry pointing | $345,685 | [SF722439](https://nearbypermits.com/boston/permit/SF722439/) |
| May 25, 2016 | Alteration or repair | Masonry pointing. | $326,340 | [SF586697](https://nearbypermits.com/boston/permit/SF586697/) |
| Apr 21, 2016 | Other | Erect 30x60 tent on 5/5/16. Removal on 5/7/16. | $2,000 | [SF579179](https://nearbypermits.com/boston/permit/SF579179/) |
| Apr 20, 2016 | Other | remove and replace gym floor in new facility. | $250,000 | [SF581935](https://nearbypermits.com/boston/permit/SF581935/) |
| Mar 19, 2016 | Fire systems | run wire between two school building fire panels in order to network the fire systems | $13,000 | [EFA571098](https://nearbypermits.com/boston/permit/EFA571098/) |
| Jun 26, 2015 | Plumbing | Relocate Gas Meter | $5,000 | [G488422](https://nearbypermits.com/boston/permit/G488422/) |
| Apr 15, 2015 | Other | Erect 30x60 tent on 5/7/15. Removal on 5/9/15. | $1,800 | [SF462888](https://nearbypermits.com/boston/permit/SF462888/) |
| Dec 4, 2014 | Plumbing | Temporary Heat - Winter Conditions | $4,000 | [G431250](https://nearbypermits.com/boston/permit/G431250/) |
| Aug 13, 2014 | Electrical | Low voltage wiring to install card reader pkg entrance to IT offices door. Install new door s2 micro node and lock power supply in switch room or closet. | $6,000 | [ELV395350](https://nearbypermits.com/boston/permit/ELV395350/) |
| Jul 9, 2014 | Alteration or repair | Replace and repair concrete walk | $8,850 | [SF382034](https://nearbypermits.com/boston/permit/SF382034/) |
| Apr 29, 2014 | Other | Erect 30x60 tent on 5/8/14. Removal on 5/10/14. | $1,700 | [SF356577](https://nearbypermits.com/boston/permit/SF356577/) |
| Apr 10, 2014 | Electrical | Low coltage permit for Winsor School Project Install and wire bms contrals HVAC equipment | $200,000 | [ELV351710](https://nearbypermits.com/boston/permit/ELV351710/) |
| Mar 26, 2014 | Electrical | New addition & partial renovation to existing building consisting of new electrical service, multiple feeders to various locations, new generator on roof along with electrical wiring for power, lighting & mechanical equipment | $5,000,000 | [E324739](https://nearbypermits.com/boston/permit/E324739/) |
| Feb 19, 2014 | Plumbing | Temporary Heat | $25,000 | [G319923](https://nearbypermits.com/boston/permit/G319923/) |
| Sep 25, 2013 | Electrical | Provide lighting and power distribution for an event in a tent at the Winsor School in Boston, Mass. on 9/27-29/13. We will provide 2 - 125kw generators, (1 - is a back up) to power the lightng, catering and audio visual. | $5,000 | [ETS287423](https://nearbypermits.com/boston/permit/ETS287423/) |
| Sep 20, 2013 | Other | Erect 80x100 and 16x24 tents on 9/25/13. Removal on 9/29/13. | $6,300 | [SF287499](https://nearbypermits.com/boston/permit/SF287499/) |
| Aug 26, 2013 | Fire systems | Amendment to Long Form Permit No. ALT263756. Electrical Work: Installation of a temporary exterior generator as a primary power source for the Section 10-3 (of the Boston Building Code) Winsor School Temporary Trailer Locker Rooms. Generator to operate 24 hours/day and 7 days/week until the permanen | $5,000 | [A274843](https://nearbypermits.com/boston/permit/A274843/) |
| Aug 6, 2013 | Fire systems | Install fire alarm devices in temporary athletic trailers | $12,000 | [EFA271036](https://nearbypermits.com/boston/permit/EFA271036/) |
| Aug 6, 2013 | Electrical | Install (4) feeders to athletic trailers to be used for temp locker rooms | $2,500 | [E271032](https://nearbypermits.com/boston/permit/E271032/) |
| Jul 2, 2013 | Plumbing | New school building/demo existing | $2,000,000 | [PL259167](https://nearbypermits.com/boston/permit/PL259167/) |
| Jun 27, 2013 | Electrical | Install primary conduits from existing manhole to new transformer pad to feed a 400 amp, 277/480 volt temp service to provide power to office trailers and new building during construction N Star work order - 1947828 | $35,000 | [ETS257931](https://nearbypermits.com/boston/permit/ETS257931/) |
| Jun 27, 2013 | Electrical | Install new secondary conduit from N Star manhole to refeed existing building. The original ductbank is in the way of the construction for the new building | $10,000 | [E257937](https://nearbypermits.com/boston/permit/E257937/) |
| Jun 27, 2013 | Electrical | Install underground conduit / wiring for new parking lot and walkway lighting. Install empty underground conduits for parking lot security. Install new underground conduits to refeed existing field lighting. | $85,000 | [E257921](https://nearbypermits.com/boston/permit/E257921/) |
| May 23, 2013 | Other | install tent and marquees for graduation at Winsor School | $9,000 | [SF247175](https://nearbypermits.com/boston/permit/SF247175/) |
| May 8, 2013 | Demolition | Site mobilization and site clearing permit to convert a tennis court into a surface parking lot for the Winsor School. This application is being submitted while the long form permit process for ALT#225699 takes its course. | $50,000 | [SF242035](https://nearbypermits.com/boston/permit/SF242035/) |
| Jul 3, 2012 | Grading | Subsurface boring explorations | $12,000 | [SF159366](https://nearbypermits.com/boston/permit/SF159366/) |
| Apr 11, 2012 | Other | We are installing a 60x150 tent with a 8x30 entrance marquee for the Winsor School Graduation on 6/7/2012. We plan to set the tent Monday 6/3/12 and pick them up 6/10/12. | $8,000 | [SF130319](https://nearbypermits.com/boston/permit/SF130319/) |
| Jul 14, 2011 | Plumbing | To furnish and install (2) hot water heaters and a storage tank on the first floor for the Windsor School Renovation Project. | $77,000 | [PL85579](https://nearbypermits.com/boston/permit/PL85579/) |
| Jul 14, 2011 | Plumbing | To furnish and install (2) hot water heaters and a storage tank on the first floor for the Windsor School Renovation Project. | $77,000 | [G85582](https://nearbypermits.com/boston/permit/G85582/) |
| Jul 6, 2010 | Roofing | Remove existing rubber roof membrane and install new tapered insulation with new rubber roof. | $57,500 | [SF32582](https://nearbypermits.com/boston/permit/SF32582/) |
| Jun 4, 2010 | Electrical | 103 Pilgrim Rd. - Winsor School - Replace lighting with energy efficient fixtures. | $6,090 | [E28214](https://nearbypermits.com/boston/permit/E28214/) |
| Jun 1, 2010 | Other | tent for graduation 1200 seats setup 6/8 takedown 6/10 60 x 120 | $10,000 | [SF27916](https://nearbypermits.com/boston/permit/SF27916/) |
| Dec 23, 2009 | Other | subsurface boring investigation | $15,000 | [SF2404](https://nearbypermits.com/boston/permit/SF2404/) |

## Within ¼ mi since May 1, 2026

131 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 82 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 7, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Feldberg Building; 7th Floor Renovation of entire floor, with new patient rooms and admin areas; installation of extension of building nurse call system Installation of nurse call wiring and devices for office admin and patient rooms; an extension of the existing building nurse call system | $25,000 | [ELV1905744](https://nearbypermits.com/boston/permit/ELV1905744/) |
| Sep 30, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Feldberg Building; 7th Floor. Renovation of entire floor, with new patient rooms and admin areas; installation of new lighting and power for entire floor | $350,000 | [E1905755](https://nearbypermits.com/boston/permit/E1905755/) |
| Sep 30, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Feldberg Building; 8th Floor and 8M. Installation of new mechanical equipment on Level 8M, (1) AHU, (1) HRU, (1) CP with some associated demo and relocates on the floor below level 8 | $75,000 | [E1905746](https://nearbypermits.com/boston/permit/E1905746/) |
| Sep 24, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Feldberg Building; basement, Level 1 mech; and 6th Flr Roof Renovation of Basement area for new cleanrooms and offices, Installation of new AHU on level 1, and wiring of new exhaust fans on 6th floor roof | $120,000 | [E1902805](https://nearbypermits.com/boston/permit/E1902805/) |
| Oct 6, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Plumbing | Remove (2) existing burners and replace with (2) new burners | $42,000 | [G1907114](https://nearbypermits.com/boston/permit/G1907114/) |
| Oct 2, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Plumbing | Installation of water and waste piping serving new plumbing fixtures on inpatient floor of hospital. (465500-1) | $480,000 | [PL1906433](https://nearbypermits.com/boston/permit/PL1906433/) |
| Oct 2, 2026 | [21 Autumn St](https://nearbypermits.com/boston/address/21-autumn-st/) | 940 ft SW | Electrical | Renovate existing space into new site office. Added power outlets and above floor raceway for conference room. | $10,000 | [E1905197](https://nearbypermits.com/boston/permit/E1905197/) |
| Oct 1, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Plumbing | Installation of water and waste piping serving inpatient rooms and mechanical room. (465300-1) | $66,000 | [PL1905564](https://nearbypermits.com/boston/permit/PL1905564/) |
| Oct 1, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Swo 114928 bidmc 12 cables | $5,000 | [ELV1905041](https://nearbypermits.com/boston/permit/ELV1905041/) |
| Oct 1, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Fire systems | Renovation of BIDMC's Reisman Building 10th Floor Labor and Delivery Unit | $9,000 | [EFA1905110](https://nearbypermits.com/boston/permit/EFA1905110/) |
| Oct 1, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Renovations of existing Fluoro room to receive new equipment. Updated architectural finishes. Fire Alarm Alterations E-File | $949,374 | [ALT1894050](https://nearbypermits.com/boston/permit/ALT1894050/) |
| Sep 30, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Select renovation of BIDMC's Reisman 10th Floor Labor and Delivery unit | $60,000 | [E1905105](https://nearbypermits.com/boston/permit/E1905105/) |
| Sep 29, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Replacement of HVAC equipment and associated electrical, plumbing and mechanical piping serving adjacent floor. New slab penetrations between mechanical floor and floor below for new ductwork. Selective replacement/relocation of existing MEPs serving 6 patient rooms on 8th floor. | $4,313,437 | [ALT1888176](https://nearbypermits.com/boston/permit/ALT1888176/) |
| Sep 28, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Electrical Service & Maintenance as required by the owner of the facility - Beth Israel Lahey Health/BIDMC | $50,000 | [E1904411](https://nearbypermits.com/boston/permit/E1904411/) |
| Sep 28, 2026 | [364-370 Brookline Av](https://nearbypermits.com/boston/address/364--370-brookline-av/) | 710 ft S | Electrical | Electrical Service and Maintenance as required by owner of the facility - Beth Israel Lahey Health/BIDMC | $50,000 | [E1904402](https://nearbypermits.com/boston/permit/E1904402/) |
| Sep 28, 2026 | [333 Longwood Av](https://nearbypermits.com/boston/address/333-longwood-av/) | 990 ft SE | Electrical | Electrical feed to five (5) car chargers. | $30,000 | [E1904065](https://nearbypermits.com/boston/permit/E1904065/) |
| Sep 28, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Gut renovation of 17,000 sf of existing inpatient unit. Work includes removal of existing finishes and MEPs. New work includes: drywall partitions, ceilings, finishes, specialties, HVAC, electrical, fire alarm, and rework of existing plumbing and sprinkler. | $9,206,424 | [ALT1898017](https://nearbypermits.com/boston/permit/ALT1898017/) |
| Sep 24, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Fire systems | Feldberg Building; basement, Level 1 mech; and 6th Flr Roof Renovation of Basement area for new cleanrooms and offices; new indicating devices, Installation of new AHU on level 1 with new initiating devices | $10,000 | [EFA1902810](https://nearbypermits.com/boston/permit/EFA1902810/) |
| Sep 22, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Furnish and install control work LC7 | $150,000 | [ELV1901989](https://nearbypermits.com/boston/permit/ELV1901989/) |
| Sep 21, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Initial abatement and exploratory removal of architectural finishes associated with permit application ALT1898017. | $709,450 | [SF1901886](https://nearbypermits.com/boston/permit/SF1901886/) |
| Aug 25, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Initial abatement and exploratory removal of architectural finishes associated with permit application ALT1888176. Cost of work accounted for on permit application ALT1888176. | $1,000 | [SF1888185](https://nearbypermits.com/boston/permit/SF1888185/) |
| Sep 18, 2026 | [21 Autumn St](https://nearbypermits.com/boston/address/21-autumn-st/) | 940 ft SW | Alteration or repair | Removal of six non-load-bearing walls to create an open floor plan, along with the construction of two new partition walls to support the revised layout. No impacts for existing FA & FP systems. | $30,000 | [SF1900640](https://nearbypermits.com/boston/permit/SF1900640/) |
| Sep 18, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Plumbing | Install two shower stalls | $5,000 | [PL1901774](https://nearbypermits.com/boston/permit/PL1901774/) |
| Sep 17, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Renovation of approximately 2,000 sf of existing space in the FD basement to replace the Pharmacy's aging clean room suite with new. Approximately 1,400 sf mechanical room infill/addition in the plaza level courtyard above to serve the clean room suite, including new ductwork and MEP upgrades. | $7,133,133 | [ALT1896244](https://nearbypermits.com/boston/permit/ALT1896244/) |
| Sep 14, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Plumbing | Rework of existing hospital treatment space. Demolition of old piping, installation of new medical gas piping and (2) medical gas zone valve boxes, and installation of (2) new sinks. | $14,000 | [PL1901022](https://nearbypermits.com/boston/permit/PL1901022/) |
| Sep 14, 2026 | [375 Longwood Av](https://nearbypermits.com/boston/address/375-longwood-av/) | 460 ft SW | Electrical | Rewire (4) HVAC low voltage control terminal equipment. | $5,000 | [ELV1896885](https://nearbypermits.com/boston/permit/ELV1896885/) |
| Sep 9, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Plumbing | Renovation of existing core space in lab space | $2,500,000 | [PL1899441](https://nearbypermits.com/boston/permit/PL1899441/) |
| Sep 8, 2026 | [364-370 Brookline Av](https://nearbypermits.com/boston/address/364--370-brookline-av/) | 710 ft S | Electrical | Feed BIDMC's 1st floor pharmacy panel (existing) off of new power source | $87,000 | [E1897765](https://nearbypermits.com/boston/permit/E1897765/) |
| Sep 2, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Fire systems | Select renovation of BIDMC's Stoneman Building 4th floor to accommodate new ERCP2 Lab Equipment. 2 smoke detectors and 2 remote indicator lights. | $9,000 | [EFA1896310](https://nearbypermits.com/boston/permit/EFA1896310/) |
| Sep 1, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Select renovation of BIDMC Stoneman Building 4th floor ERCP Lab | $90,000 | [E1896306](https://nearbypermits.com/boston/permit/E1896306/) |
| Aug 27, 2026 | [340-350 Longwood Av](https://nearbypermits.com/boston/address/340--350-longwood-av/) | 940 ft S | Alteration or repair | Finish Upgrades to existing office suite in the galleria located at 350 longwood avenue. Work includes new carpet, paint, misc. carpentry, minor electrical upgrades, relocating one thermostat, 2 new doors, specialties, and minor millwork modifications | $119,924 | [SF1889363](https://nearbypermits.com/boston/permit/SF1889363/) |
| Aug 24, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Plumbing | renovation of pharmacy cleanroom area. addition of 2 sinks and eyewash stations | $150,000 | [PL1880250](https://nearbypermits.com/boston/permit/PL1880250/) |
| Aug 19, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Retrofit existing light fixtures in level 9 Vivarium | $85,000 | [E1889700](https://nearbypermits.com/boston/permit/E1889700/) |
| Aug 18, 2026 | [175 Pilgrim Rd](https://nearbypermits.com/boston/address/175-pilgrim-rd/) | 980 ft SW | Fire systems | Installation of a 2" branch line and (7) sprinkler heads inside an existing utility tunnel. | $10,000 | [SF1881876](https://nearbypermits.com/boston/permit/SF1881876/) |
| Aug 13, 2026 | [1 Joslin Pl](https://nearbypermits.com/boston/address/1-joslin-pl/) | 930 ft S | Grading | Drill two borings in the sidewalk at Crossover in front of the exisiting parking garage. | $18,500 | [SF1873087](https://nearbypermits.com/boston/permit/SF1873087/) |
| Aug 11, 2026 | [477 Longwood Av](https://nearbypermits.com/boston/address/477-longwood-av/) | 620 ft W | Alteration or repair | Run MC cable feed inside for exterior light poles (4) on Nessel way fed by underground pipe | $13,000 | [E1886244](https://nearbypermits.com/boston/permit/E1886244/) |
| Aug 10, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Alteration or repair | Renovation and fit out of existing 7th floor of the Longwood Center. Includes new MEPFP systems and FA. Three cancer research wet labs, associated equipment and misc. office and collaborative spaces. | $22,160,062 | [ALT1872890](https://nearbypermits.com/boston/permit/ALT1872890/) |
| Aug 6, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Rooms getting the "uplift" portion will have new Staff Terminals replace the existing 4-button stations currently n place today. Rooms with full hardware replacement will meet the BIDMC room standards. Reisman 11: ??10 rooms (dark green) will be gutted completely - plan new ??ST-1170, RS-1169, RS-11 | $19,000 | [ELV1877927](https://nearbypermits.com/boston/permit/ELV1877927/) |
| Aug 5, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Fire systems | Renovation of 40,000 square foot 7th floor | $150,000 | [EFA1882132](https://nearbypermits.com/boston/permit/EFA1882132/) |
| Aug 5, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Renovation of 40,000 square foot on 7th floor | $2,450,000 | [E1882130](https://nearbypermits.com/boston/permit/E1882130/) |
| Aug 4, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Low Voltage BIDMC | $20,000 | [ELV1881389](https://nearbypermits.com/boston/permit/ELV1881389/) |
| Aug 3, 2026 | [477 Longwood Av](https://nearbypermits.com/boston/address/477-longwood-av/) | 620 ft W | Electrical | 2 – Access Control Doors | $10,000 | [ELV1880430](https://nearbypermits.com/boston/permit/ELV1880430/) |
| Jul 31, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Fire systems | Add 2 fire alarm devices to an existing loop | $5,000 | [EFA1879498](https://nearbypermits.com/boston/permit/EFA1879498/) |
| Jul 31, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Fire systems | We are installing Temp Heat Detector protectowire (2 Devices | $12,000 | [EFA1879276](https://nearbypermits.com/boston/permit/EFA1879276/) |
| Jul 31, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Demo Cleanroom Space in the Feldberg Basement Level, add temp light stringers | $20,000 | [E1879272](https://nearbypermits.com/boston/permit/E1879272/) |
| Jul 24, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Description: Furnish & Install (96) LCM's & (11) VAV's. | $200,000 | [ELV1875284](https://nearbypermits.com/boston/permit/ELV1875284/) |
| Jul 23, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Install light fixtures on floors 2,3,&4th floor | $110,000 | [E1875682](https://nearbypermits.com/boston/permit/E1875682/) |
| Jul 20, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Alteration or repair | HVAC equipment replacement on Level 9 in existing vivarium. Includes HVAC, HVAC controls, carpentry, and electrical. Relocation of (9) or less sprinkler heads | $3,505,243 | [SF1872539](https://nearbypermits.com/boston/permit/SF1872539/) |
| Jul 7, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Fire systems | temp fire alarm system being installed for this demo phase job. -7th floor electrical FA demolition | $10,000 | [EFA1868727](https://nearbypermits.com/boston/permit/EFA1868727/) |
| Jul 6, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Sign | Elec app. Per BPDA approval 6-4-26 and stamped engineer plans replace two existing free-standing wayfinding signs with two new ones in same locations @ 52 sq ft each. Internally illuminated. On Longwood Ave @ Binney St and on Brookline Ave @ Longwood. For: Beth Israel Deaconess Medical Center. | $42,000 | [ALT1863169](https://nearbypermits.com/boston/permit/ALT1863169/) |
| Jul 6, 2026 | [364-370 Brookline Av](https://nearbypermits.com/boston/address/364--370-brookline-av/) | 710 ft S | Alteration or repair | Interior renovation of existing space and a new fire alarm;"Interior renovation of 1500sf of hospital office space | $120,000 | [ALT1845481](https://nearbypermits.com/boston/permit/ALT1845481/) |
| Jul 2, 2026 | [477 Longwood Av](https://nearbypermits.com/boston/address/477-longwood-av/) | 620 ft W | Plumbing | installation of new inlet and outlet connections along with associated piping for existing floor drain back to main | $5,750 | [PL1866941](https://nearbypermits.com/boston/permit/PL1866941/) |
| Jun 25, 2026 | [477 Longwood Av](https://nearbypermits.com/boston/address/477-longwood-av/) | 620 ft W | Electrical | Installation of Low Voltage Building Automation System at Temple Israel Vestibule. | $1,750 | [ELV1864857](https://nearbypermits.com/boston/permit/ELV1864857/) |
| Jun 25, 2026 | [333 Longwood Av](https://nearbypermits.com/boston/address/333-longwood-av/) | 990 ft SE | Fire systems | BCH Project 21436 - Disconnect existing fire pump and install and wire new fire pump. | $8,200 | [EFA1862036](https://nearbypermits.com/boston/permit/EFA1862036/) |
| Jun 25, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | 7th floor electrical demolition @ 360 Longwood Ave, Boston, MA 02115 | $75,000 | [E1863811](https://nearbypermits.com/boston/permit/E1863811/) |
| Jun 16, 2026 | [364-370 Brookline Av](https://nearbypermits.com/boston/address/364--370-brookline-av/) | 710 ft S | Fire systems | : Adding an AV and relay for the auto door | $3,000 | [EFA1860583](https://nearbypermits.com/boston/permit/EFA1860583/) |
| Jun 16, 2026 | [364-370 Brookline Av](https://nearbypermits.com/boston/address/364--370-brookline-av/) | 710 ft S | Electrical | Add 2 receptacles in kitchen and power to 1 autodoor | $4,000 | [E1860582](https://nearbypermits.com/boston/permit/E1860582/) |
| Jun 10, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Alteration or repair | Interior demolition of existing damaged plumbing. Installing new plumbing in place to match existing. | $233,411 | [SF1856809](https://nearbypermits.com/boston/permit/SF1856809/) |
| Jun 9, 2026 | [375 Longwood Av](https://nearbypermits.com/boston/address/375-longwood-av/) | 460 ft SW | Fence, wall or deck | We will be completing small concrete, sealant and traffic topping repairs to the garage @ 375 Longwood ave. | $713,825 | [SF1856630](https://nearbypermits.com/boston/permit/SF1856630/) |
| Jun 9, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | This project consists of concrete restoration and the interior demolition to enable that restoration. Life safety systems are to be maintained. This work is being performed in the Feldberg Building basement. | $700,000 | [ALT1858052](https://nearbypermits.com/boston/permit/ALT1858052/) |
| Jun 3, 2026 | [340-350 Longwood Av](https://nearbypermits.com/boston/address/340--350-longwood-av/) | 940 ft S | Electrical | L26016- wire and install telecommunications locations on the 1st floor. | $74,000 | [ELV1856961](https://nearbypermits.com/boston/permit/ELV1856961/) |
| Jun 2, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | Select renovation of room 0B01 in BIDMC's Rabb building basement level. | $35,000 | [E1826177](https://nearbypermits.com/boston/permit/E1826177/) |
| Jun 1, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Nurse call low voltage additions | $30,000 | [ELV1853297](https://nearbypermits.com/boston/permit/ELV1853297/) |
| Jun 1, 2026 | [477 Longwood Av](https://nearbypermits.com/boston/address/477-longwood-av/) | 620 ft W | Fire systems | Installation and 1 AV fire alarm device in the entry way of vestibule. | $1,500 | [EFA1855895](https://nearbypermits.com/boston/permit/EFA1855895/) |
| Jun 1, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Fire systems | Fire alarm demo and renovations | $20,000 | [EFA1853299](https://nearbypermits.com/boston/permit/EFA1853299/) |
| Jun 1, 2026 | [477 Longwood Av](https://nearbypermits.com/boston/address/477-longwood-av/) | 620 ft W | Electrical | Electrical work in the entry way vestibule. Includes adding lights and switches. | $25,000 | [E1855897](https://nearbypermits.com/boston/permit/E1855897/) |
| Jun 1, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | Floor 1 exam suite electrical demo and renovation (+1) 100A/3P 120/208V panelboard | $95,000 | [E1855860](https://nearbypermits.com/boston/permit/E1855860/) |
| May 28, 2026 | [340-350 Longwood Av](https://nearbypermits.com/boston/address/340--350-longwood-av/) | 940 ft S | Alteration or repair | Finish Upgrades to three existing office suites in the galleria located at 350 longwood avenue. Work includes new carpet, paint, misc. carpentry, minor electrical upgrades, relocating one thermostat, 2 new doors, specialties, and minor millwork modifications | $125,548 | [SF1855143](https://nearbypermits.com/boston/permit/SF1855143/) |
| May 27, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | No work associated with amendment- amendment to provide final cost increase; associated with ALT1808754 only | $5,948,664 | [A1853645](https://nearbypermits.com/boston/permit/A1853645/) |
| May 26, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Plumbing | Renovation of an Exam Suite adding hand sinks | $75,000 | [PL1852856](https://nearbypermits.com/boston/permit/PL1852856/) |
| May 26, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | HVAC control wiring | $2,500 | [ELV1852519](https://nearbypermits.com/boston/permit/ELV1852519/) |
| May 26, 2026 | [375 Longwood Av](https://nearbypermits.com/boston/address/375-longwood-av/) | 460 ft SW | Fire systems | Renovation of 2nd floor, Add strobe only in offices, add 2 A?V's, Remove existing smokes during construction and reinstall when complete | $45,000 | [EFA1853328](https://nearbypermits.com/boston/permit/EFA1853328/) |
| May 26, 2026 | [375 Longwood Av](https://nearbypermits.com/boston/address/375-longwood-av/) | 460 ft SW | Electrical | Partial renovation of 2nd floor. Added power in various locations, replace all light fixtures | $155,000 | [E1853322](https://nearbypermits.com/boston/permit/E1853322/) |
| May 26, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Electrical | remove and replace light fixtures and outlets | $30,000 | [E1850624](https://nearbypermits.com/boston/permit/E1850624/) |
| May 15, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Plumbing | Installation of ne RO Water Skid with Floor Drains | $922,000 | [PL1850052](https://nearbypermits.com/boston/permit/PL1850052/) |
| May 14, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Electrical | LOW VOLTAGE - 360 Longwood Ave - DFCI LC9 ARF Expansion | $40,000 | [ELV1849096](https://nearbypermits.com/boston/permit/ELV1849096/) |
| May 14, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Alteration or repair | Non- structural interior renovation of an existing research pharmacy to create new work spaces. Work includes selective demolition/ installation of interior partitions, finishes, and modifications to the existing MEP/ FP systems. | $503,277 | [ALT1836297](https://nearbypermits.com/boston/permit/ALT1836297/) |
| May 12, 2026 | [1 Joslin Pl](https://nearbypermits.com/boston/address/1-joslin-pl/) | 930 ft S | Demolition | Demolition of building structure slab and foundationsDig Safe#20261705900 | $6,874,334 | [SF1842319](https://nearbypermits.com/boston/permit/SF1842319/) |
| May 11, 2026 | [375 Longwood Av](https://nearbypermits.com/boston/address/375-longwood-av/) | 460 ft SW | Plumbing | Installing a new sink and hooking up a water dispenser in an office setting. | $11,700 | [PL1847309](https://nearbypermits.com/boston/permit/PL1847309/) |
| May 11, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Alteration or repair | Demolition ONLY of the existing office space on 7th floor of the Longwood Center. Scope includes demo of the existing office space: MEPs and finishes. Turning up sprinkler heads, installing temporary heat loop, general demo and make safe. | $1,000,000 | [ALT1841839](https://nearbypermits.com/boston/permit/ALT1841839/) |
| May 6, 2026 | [330 Brookline Av](https://nearbypermits.com/boston/address/330-brookline-av/) | 550 ft SE | Fire systems | Replace existing fire pump panel | $39,450 | [ALT1826485](https://nearbypermits.com/boston/permit/ALT1826485/) |
| May 4, 2026 | [354-364 Longwood Av](https://nearbypermits.com/boston/address/354--364-longwood-av/) | 730 ft S | Alteration or repair | Renovation of existing space includes new finishes and MEPs. | $1,253,427 | [ALT1842317](https://nearbypermits.com/boston/permit/ALT1842317/) |

### Farther (1,000 ft to ¼ mi), 49 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 12, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Electrical | Deenergized testing and maintenance | $57,920 | [E1908063](https://nearbypermits.com/boston/permit/E1908063/) |
| Oct 9, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Electrical | CLS building Level 14; #14036, 14039, 14043, 14C60, 1475 Installation of receptacles in offices for a variety amount of equipment | $20,000 | [E1908336](https://nearbypermits.com/boston/permit/E1908336/) |
| Oct 8, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Electrical | CLSB Office Reno. MISC Low Voltage HVAC Control Wiring PG 264366 | $5,144 | [ELV1907993](https://nearbypermits.com/boston/permit/ELV1907993/) |
| Oct 8, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Fire systems | Renovation of 6000 square feet of space on 1st floor | $20,000 | [EFA1907637](https://nearbypermits.com/boston/permit/EFA1907637/) |
| Oct 8, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Fire systems | Renovation of 10,000 square feet on 1st floor. Phase 1 of 2 phase project | $25,000 | [EFA1907631](https://nearbypermits.com/boston/permit/EFA1907631/) |
| Oct 8, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Electrical | Renovation of 6000 square feet of space on 1st floor with 2 Spec CT suites. 2nd phase of project | $270,000 | [E1907635](https://nearbypermits.com/boston/permit/E1907635/) |
| Oct 8, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Electrical | Renovation of 10,000 square feet of clinical space and 3 Pet Ct suites. Upgrades to AHU and mechanical support space on 4th floor. phase 1 or 2 phase project | $930,000 | [E1907630](https://nearbypermits.com/boston/permit/E1907630/) |
| Oct 6, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Plumbing | Installation of water and waste piping serving new fixtures in lab space. (885981-1) | $64,000 | [PL1907622](https://nearbypermits.com/boston/permit/PL1907622/) |
| Oct 5, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Alteration or repair | Add new outlets / circuits in CLSB 14th Floor lab for Boston Children's Hospital. Infill east door in room CL14043 | $67,064 | [SF1906000](https://nearbypermits.com/boston/permit/SF1906000/) |
| Oct 5, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Plumbing | Renovation of existing Level 1 Office Space to Create a New Nuclear Medicine Department | $1,000,000 | [PL1906797](https://nearbypermits.com/boston/permit/PL1906797/) |
| Oct 1, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Plumbing | Demo Waste Water Piping on lower level, install waste piping on lower level, demo waste, sanitary, and rain leader piping on 1st floor. Install new sanitary piping on 1st floor | $43,450 | [PL1904949](https://nearbypermits.com/boston/permit/PL1904949/) |
| Oct 1, 2026 | [1 Deaconess Rd](https://nearbypermits.com/boston/address/1-deaconess-rd/) | 0.22 mi SW | Electrical | 26-0294-10 BIDMC Rosenburg 3 INR | $115,000 | [ELV1904008](https://nearbypermits.com/boston/permit/ELV1904008/) |
| Oct 1, 2026 | [10 Joslin Pl](https://nearbypermits.com/boston/address/10-joslin-pl/) | 0.20 mi SW | Electrical | Adding new 400A panel, bringing equipment feed through existing Joslin park utility tunnel to power new exhaust fan. | $95,000 | [E1906379](https://nearbypermits.com/boston/permit/E1906379/) |
| Oct 1, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Electrical | Renovation of 3000 square feet of space on the 5th floor | $270,000 | [E1905938](https://nearbypermits.com/boston/permit/E1905938/) |
| Sep 30, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Fire systems | Renovation of 9000 square feet of the 9th floor | $75,000 | [EFA1903359](https://nearbypermits.com/boston/permit/EFA1903359/) |
| Sep 30, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Electrical | Renovation of 9000 square feet of the 9th floor | $275,000 | [E1903337](https://nearbypermits.com/boston/permit/E1903337/) |
| Sep 28, 2026 | [1 Deaconess Rd](https://nearbypermits.com/boston/address/1-deaconess-rd/) | 0.22 mi SW | Electrical | Electrical Service & Maintenance as required by the owner of the facility - Beth Israel Lahey Health/BIDMC | $50,000 | [E1904420](https://nearbypermits.com/boston/permit/E1904420/) |
| Sep 28, 2026 | [283 Longwood Av](https://nearbypermits.com/boston/address/283-longwood-av/) | 0.24 mi SE | Electrical | Electrical feed to five (5) car chargers | $30,000 | [E1904056](https://nearbypermits.com/boston/permit/E1904056/) |
| Sep 25, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Plumbing | Installation of water and sanitary piping serving new kitchen sink. (885891-1) | $12,500 | [PL1904441](https://nearbypermits.com/boston/permit/PL1904441/) |
| Sep 24, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Plumbing | Installation of water and waste piping serving new sink in Lab. (885980-1) | $14,100 | [PL1904238](https://nearbypermits.com/boston/permit/PL1904238/) |
| Sep 17, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Alteration or repair | Interior renovation of approximately 19000 sf. Construction includes finish upgrades of paint, flooring, millwork ext. Construction also includes minor MEP upgrades. | $3,017,630 | [ALT1899036](https://nearbypermits.com/boston/permit/ALT1899036/) |
| Sep 17, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Alteration or repair | Interior renovation of approximately 9,000 sf. Finish upgrades include flooring, paint, millwork ext. Construction also includes minor finish upgrades. | $2,322,407 | [ALT1898021](https://nearbypermits.com/boston/permit/ALT1898021/) |
| Sep 16, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Fire systems | Modification to existing fire alarm system. Installation of new speaker strobes and visual only devices. demo and relocate select fire alarm devices in area. demo and make safe. | $79,000 | [EFA1901317](https://nearbypermits.com/boston/permit/EFA1901317/) |
| Sep 14, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Electrical | Selective/full-gut electrical & fire alarm demo; new lighting, controls, power, panelboards/feeders, relocated panels, and complete new addressable fire alarm devices, tied into building system. | $500,000 | [E1900549](https://nearbypermits.com/boston/permit/E1900549/) |
| Sep 14, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Alteration or repair | Minimal demolition of existing interior partitions and MEP. New Construction consists of relocating existing pantry, new floor finishes, new lighting, new systems furniture in conference and office spaces. | $286,497 | [ALT1849184](https://nearbypermits.com/boston/permit/ALT1849184/) |
| Aug 27, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Fire systems | Add 2 new strobe only devices to the fully addressable fire alarm system as part of the BMR office renovations. | $2,200 | [EFA1894116](https://nearbypermits.com/boston/permit/EFA1894116/) |
| Aug 26, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Electrical | 2nd floor work includes power, lighting, and fire alarm in scope. furnish & install outlets and light fixtures in MC cable. Furnish & install (3) 20A 1-pole GFCI circuit breakers. Pidc112 | $20,000 | [E1894029](https://nearbypermits.com/boston/permit/E1894029/) |
| Aug 25, 2026 | [10 Joslin Pl](https://nearbypermits.com/boston/address/10-joslin-pl/) | 0.20 mi SW | Alteration or repair | Selective demolition and renovation of existing utility tunnel, including removal of precast lid/vent elements, new structural concrete infill, new intake/exhaust openings, waterproofing, fan installation, and related MEP modifications.All work to be verified in the field by the ward Inspector per I | $1,903,400 | [ALT1850232](https://nearbypermits.com/boston/permit/ALT1850232/) |
| Aug 18, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Electrical | E26101 BWH HIM-7 electrically renovate space. | $14,000 | [E1889525](https://nearbypermits.com/boston/permit/E1889525/) |
| Aug 17, 2026 | [332 Longwood Av](https://nearbypermits.com/boston/address/332-longwood-av/) | 0.21 mi S | Electrical | Enders Bldg - Access Control and Video work for elevator rehab project | $80,000 | [ELV1887645](https://nearbypermits.com/boston/permit/ELV1887645/) |
| Jul 23, 2026 | [1 Deaconess Rd](https://nearbypermits.com/boston/address/1-deaconess-rd/) | 0.22 mi SW | Alteration or repair | Interior renovation of existing radiology spaces to create new patient care areas. Work involves the removal and reconstruction of non structural partitions, finishes, and modifications to MEP/FP systems. [ePlans] | $2,188,255 | [ALT1857260](https://nearbypermits.com/boston/permit/ALT1857260/) |
| Jul 21, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Plumbing | demo of existing TW line. install new plumbing piping including VAC, CO2, TW, RODI, NCW, NHW, NHWR, LV, LW and fixtures inlcuding an eyewash and lab sink to be installed with the project space. | $42,079 | [PL1874108](https://nearbypermits.com/boston/permit/PL1874108/) |
| Jul 9, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Alteration or repair | HIM 7 Tissue Culture Room (Hematology) - This work includes the replacement of selective renovation of select flooring, relocation of walls, modification of plumbing, electrical, and HVAC, and modify less than 9 sprinkler heads for new layout. | $403,223 | [SF1869657](https://nearbypermits.com/boston/permit/SF1869657/) |
| Jul 8, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Electrical | Center for Life Science - Provide new DDC wiring and update controls on 3rd floor and mechanical room. Provide 120V circuits for new controllers on 3rd floor. | $231,785 | [E1870232](https://nearbypermits.com/boston/permit/E1870232/) |
| Jun 29, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Plumbing | Modification of existing plumbing piping and installation of (1) CO2 regulator to assist in the upgrade of space | $17,000 | [PL1862718](https://nearbypermits.com/boston/permit/PL1862718/) |
| Jun 15, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Plumbing | Relocate Domestic Water fixtures and associated pipe | $9,950 | [PL1860388](https://nearbypermits.com/boston/permit/PL1860388/) |
| Jun 15, 2026 | [440 Brookline Av](https://nearbypermits.com/boston/address/440-brookline-av/) | 0.20 mi S | Alteration or repair | Replace two (2) existing 450kW Generators in-kind along with the associated emergency switchgear located on Level 7 of the Mayer Building. | $2,881,440 | [ALT1829642](https://nearbypermits.com/boston/permit/ALT1829642/) |
| Jun 11, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Alteration or repair | MCP Lease Consolidation HIM 5 - This work includes the replacement of selective renovation of select flooring, relocation of walls, modification of plumbing and electrical, and modify less than 9 sprinkler heads for new layout. | $60,000 | [SF1853305](https://nearbypermits.com/boston/permit/SF1853305/) |
| Jun 9, 2026 | [440 Brookline Av](https://nearbypermits.com/boston/address/440-brookline-av/) | 0.20 mi S | Plumbing | Installation of new clear water waste drainage and vent piping off existing rain water leader within the 7th floor of the DFCI Yawkey Building. | $19,851 | [PL1859000](https://nearbypermits.com/boston/permit/PL1859000/) |
| Jun 2, 2026 | [1 Deaconess Rd](https://nearbypermits.com/boston/address/1-deaconess-rd/) | 0.22 mi SW | Fire systems | Fire Alarm scope to support a select renovation of BIDMC's Rosenberg Building 3rd floor to accommodate a new Interventional Radiology Suite | $16,000 | [EFA1856727](https://nearbypermits.com/boston/permit/EFA1856727/) |
| Jun 2, 2026 | [1 Deaconess Rd](https://nearbypermits.com/boston/address/1-deaconess-rd/) | 0.22 mi SW | Electrical | Select renovation of BIDMC's Rosenberg Building 3rd floor to accommodate a new Interventional Radiology Suite | $480,000 | [E1856724](https://nearbypermits.com/boston/permit/E1856724/) |
| May 27, 2026 | [450-458 Brookline Av](https://nearbypermits.com/boston/address/450--458-brookline-av/) | 0.24 mi S | Plumbing | Connect 2 - 100 gallons water heaters | $40,000 | [PL1853786](https://nearbypermits.com/boston/permit/PL1853786/) |
| May 20, 2026 | [283 Longwood Av](https://nearbypermits.com/boston/address/283-longwood-av/) | 0.24 mi SE | Sign | Installation of 1 - 2' 6" x 10" internally illuminated blade sign. Installation of 1 - 40" round internally illuminated wall sign. | $5,000 | [ALT1820610](https://nearbypermits.com/boston/permit/ALT1820610/) |
| May 18, 2026 | [3 Blackfan Ci](https://nearbypermits.com/boston/address/3-blackfan-ci/) | 0.20 mi SE | Plumbing | Demolition and make safe of existing plumbing fixtures. (885927-1) | $1,000 | [PL1849970](https://nearbypermits.com/boston/permit/PL1849970/) |
| May 15, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Electrical | Install 42 Cat 6A Cables | $24,000 | [ELV1849915](https://nearbypermits.com/boston/permit/ELV1849915/) |
| May 14, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Alteration or repair | Minor interior renovation to an existing facility. Architectural & MEP upgrades to a small area in the basement level of 44 Binney to create added storage and break space for the clinic users. Approx. 1,500 sq.ft, not considered a substantial renovation. | $598,675 | [ALT1827040](https://nearbypermits.com/boston/permit/ALT1827040/) |
| May 13, 2026 | [332 Longwood Av](https://nearbypermits.com/boston/address/332-longwood-av/) | 0.21 mi S | Elevator | Work consists of replacing 6 elevator cabs and replacing components of existing AHUs located on level 1 mezzanine, 15th floor mechanical space, and penthouse. All work will be done in 3 phases. Work includes plumbing, electrical, sheetmetal, fire alarm, and sprinkler. | $7,800,000 | [ALT1840212](https://nearbypermits.com/boston/permit/ALT1840212/) |
| May 6, 2026 | [44 Binney St](https://nearbypermits.com/boston/address/44-binney-st/) | 0.23 mi S | Sign | remove & replace (2) signs on PMC Bridge To Progress (1 each side), located on Jimmy Fund Way Move (1) sign from PMC Bridge To Progress to walkway overpass at 44 Binney Street | $15,326 | [ALT1839841](https://nearbypermits.com/boston/permit/ALT1839841/) |
| May 4, 2026 | [4 Blackfan Ci](https://nearbypermits.com/boston/address/4-blackfan-ci/) | 0.24 mi SE | Electrical | E26048 BWH HIM 6 electrically remodel a portion of the floor. | $101,400 | [E1845439](https://nearbypermits.com/boston/permit/E1845439/) |

## Zoning requests nearby

There are no zoning requests on file within ¼ mi. Boston's feed was last read Oct 14.

## More on this street

Other addresses on Pilgrim Rd with permits, nearest house number first:

- [86 Pilgrim Rd](https://nearbypermits.com/boston/address/86-pilgrim-rd/): newest permit Mar 25, 2026
- [175 Pilgrim Rd](https://nearbypermits.com/boston/address/175-pilgrim-rd/): newest permit Aug 18, 2026
- [185 Pilgrim Rd](https://nearbypermits.com/boston/address/185-pilgrim-rd/): newest permit Oct 30, 2025

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-14 19:26 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Zoning requests come from the Boston Zoning Board of Appeal tracker (https://data.boston.gov/dataset/zoning-board-of-appeal-tracker). We read it Oct 14, 16:47 UTC.

Map, all 82 permits at this address and 131 nearby: https://nearbypermits.com/boston/address/103--117-pilgrim-rd/