# Building permits at 19 Thatcher St, Boston, MA

Six permits on record here. The newest, Sep 15: Installing a burnham x204 boiler. Within a quarter mile, the city has issued 51 more permits (46 projects) since May 1. Two are for new buildings, the nearest 570 ft away.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 15, 2026 | Plumbing | installing a burnham x204 boiler | $5,500 | [PL1901067](https://nearbypermits.com/boston/permit/PL1901067/) |
| Sep 15, 2026 | Plumbing | install burnham x204 boiler | $5,500 | [G1901061](https://nearbypermits.com/boston/permit/G1901061/) |
| Jan 21, 2025 | Alteration or repair | Rebuild handicap ramp, same footprints, per plans | $28,000 | [ALT1649593](https://nearbypermits.com/boston/permit/ALT1649593/) |
| Oct 15, 2014 | Solar | Install solar electric panels on roof of existing house, to be interconnected with home electrical system. 9.435kW @ 37 panels Job# JB-0212394-00 | $16,500 | [E405561](https://nearbypermits.com/boston/permit/E405561/) |
| Sep 29, 2014 | Solar | Install solar electric panels on roof of existing house, to be interconnected with home electrical system. 9.435kW @ 37 panels Job# JB-0212394-00 | $23,500 | [SF405560](https://nearbypermits.com/boston/permit/SF405560/) |
| Apr 8, 2010 | Electrical | eie junction box outlet | $300 | [E20979](https://nearbypermits.com/boston/permit/E20979/) |

## Within ¼ mi since May 1, 2026

51 permits in the circle. From our copy of the city's data (last 24 months).

### Next door (under 250 ft), 3 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 16, 2026 | [8 Thatcher St](https://nearbypermits.com/boston/address/8-thatcher-st/) | 230 ft W | Solar | Installation of roof mounted photovoltaic solar systems, 8.61 kw 21 panels with installation of 1 tesla battery installed on exterior of home | $80,100 | [E1896273](https://nearbypermits.com/boston/permit/E1896273/) |
| Sep 14, 2026 | [8 Thatcher St](https://nearbypermits.com/boston/address/8-thatcher-st/) | 230 ft W | Solar | Installation of roof mounted photovoltaic solar systems, 8.61 kw 21 panels with installation of 1 tesla battery installed on exterior of home | $80,100 | [SF1896265](https://nearbypermits.com/boston/permit/SF1896265/) |
| May 14, 2026 | [3-5 Thatcher St](https://nearbypermits.com/boston/address/3--5-thatcher-st/) | 220 ft W | Alteration or repair | Replace front Deck install new footing, and new staircase. | $9,000 | [SF1842856](https://nearbypermits.com/boston/permit/SF1842856/) |

### This block (250 to 1,000 ft), 19 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 8, 2026 | [21 Park St](https://nearbypermits.com/boston/address/21-park-st/) | 930 ft S | Electrical | Temporarily remove and reinstall existing exterior light fixtures, outlets, and electrical covers as needed for siding replacement. Reconnect and test upon completion. | $500 | [E1905196](https://nearbypermits.com/boston/permit/E1905196/) |
| Sep 24, 2026 | [21 Park St](https://nearbypermits.com/boston/address/21-park-st/) | 930 ft S | Roofing | stripp existing siding install new insulation board new aluminum wrap on windows and fascia, new double four vinyl siding new roof porch instalation | $22,000 | [SF1904037](https://nearbypermits.com/boston/permit/SF1904037/) |
| Sep 17, 2026 | [57 Thatcher St](https://nearbypermits.com/boston/address/57-thatcher-st/) | 570 ft E | New building | Clarification of Scope: Work originally permitted under ALT1190330 was intended to change occupancy from a single-family to a two-family dwelling with a two-story rear addition. Due to structural compromise from environmental exposure, the original dwelling was razed under emergency demolition permi | $350,000 | [ERT1794454](https://nearbypermits.com/boston/permit/ERT1794454/) |
| Aug 14, 2026 | [40-40a Greenwood Av](https://nearbypermits.com/boston/address/40--40a-greenwood-av/) | 380 ft SW | Alteration or repair | Confirming occupancy of existing 2 family home in existence for many years | Not listed | [ALT1858694](https://nearbypermits.com/boston/permit/ALT1858694/) |
| Aug 12, 2026 | [40-40a Greenwood Av](https://nearbypermits.com/boston/address/40--40a-greenwood-av/) | 380 ft SW | Electrical | 100 AMP main service panel upgrade needed at site | $2,000 | [E1886085](https://nearbypermits.com/boston/permit/E1886085/) |
| Aug 5, 2026 | [308 Huntington Av](https://nearbypermits.com/boston/address/308-huntington-av/) | 850 ft NE | Plumbing | Plumb bathroom and kitchenette in EDU | $7,000 | [PL1882025](https://nearbypermits.com/boston/permit/PL1882025/) |
| Aug 5, 2026 | [308 Huntington Av](https://nearbypermits.com/boston/address/308-huntington-av/) | 850 ft NE | Electrical | upgrade service 200 amps, adding one additional meter and panel, wiring the kitchen and bathroom, run wires for baseboard heaters, and installation of some light fixtures. | Not listed | [E1882818](https://nearbypermits.com/boston/permit/E1882818/) |
| Jul 15, 2026 | [961 Hyde Park Av](https://nearbypermits.com/boston/address/961-hyde-park-av/) | 560 ft NW | Electrical | 1) Removal of all knob and tuning wires. 2) Installation of new wiring for a complete electrical upgrades to unit #1. 3) Installation of new electrical sub-panel for unit #1. | $15,800 | [E1872948](https://nearbypermits.com/boston/permit/E1872948/) |
| Jul 8, 2026 | [40-40a Greenwood Av](https://nearbypermits.com/boston/address/40--40a-greenwood-av/) | 380 ft SW | Solar | Installation of roof mounted photovoltaic solar systems, 12.3 KW 30 panels NO BATTERY STORAGE | $66,411 | [SF1851600](https://nearbypermits.com/boston/permit/SF1851600/) |
| May 26, 2026 | [40-40a Greenwood Av](https://nearbypermits.com/boston/address/40--40a-greenwood-av/) | 380 ft SW | Solar | Installation of roof mounted photovoltaic solar systems, 12.3 KW 30 panels NO BATTERY STORAGE | $66,411 | [E1851601](https://nearbypermits.com/boston/permit/E1851601/) |
| Jul 7, 2026 | [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/) | 290 ft NE | Plumbing | Complete Plumbing for the remodel at the above address. | $12,000 | [PL1869104](https://nearbypermits.com/boston/permit/PL1869104/) |
| Jun 26, 2026 | [59 Greenwood Av](https://nearbypermits.com/boston/address/59-greenwood-av/) | 260 ft SW | Electrical | New SPAN panel to be installed at site | $6,000 | [E1864293](https://nearbypermits.com/boston/permit/E1864293/) |
| Jun 23, 2026 | [59 Greenwood Av](https://nearbypermits.com/boston/address/59-greenwood-av/) | 260 ft SW | Alteration or repair | Confirming occupancy of existing single family home. | Not listed | [ALT1858943](https://nearbypermits.com/boston/permit/ALT1858943/) |
| Jun 12, 2026 | [540 Metropolitan Av](https://nearbypermits.com/boston/address/540-metropolitan-av/) | 700 ft N | Alteration or repair | Interior: Install Intellijack support system to stabilize floor joist or beams as shown Install caulk in the crack. Exterior: Install Foundation Push Pier(s) | $86,000 | [ALT1824023](https://nearbypermits.com/boston/permit/ALT1824023/) |
| Jun 10, 2026 | [59 Greenwood Av](https://nearbypermits.com/boston/address/59-greenwood-av/) | 260 ft SW | Roofing | Pending;ALT1858943 - Occupancy Committee.Remove and replace old existing shingles, 7 sq, right side only. Install high performance synthetic underlayment Apply up to 6 feet ice and water shields. Install GAF Timberline architectural shingles. All materials, labor, and debris clean up are included. | $2,800 | [SF1848047](https://nearbypermits.com/boston/permit/SF1848047/) |
| Jun 2, 2026 | [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/) | 290 ft NE | Alteration or repair | • Remove and dispose of wall to create an open space between the kitchen and dining room • Install LVL base (according the diagram included) • Replace kitchen cabinets and countertop | $16,000 | [SF1856450](https://nearbypermits.com/boston/permit/SF1856450/) |
| May 18, 2026 | [9 Lockwood St](https://nearbypermits.com/boston/address/9-lockwood-st/) | 790 ft SE | Solar | Install 17.16kw solar panels on roof. 39 total panels. Add main breaker kit. No battery. | $55,461 | [E1850001](https://nearbypermits.com/boston/permit/E1850001/) |
| May 14, 2026 | [308 Huntington Av](https://nearbypermits.com/boston/address/308-huntington-av/) | 850 ft NE | Alteration or repair | Add Additional dwelling unit (ADU) in the basement. Add egress windows in the basement.;Home Owner Waiver | $25,000 | [ALT1773520](https://nearbypermits.com/boston/permit/ALT1773520/) |
| May 1, 2026 | [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/) | 290 ft NE | Alteration or repair | No record of occupancy for existing 1 family.; | Not listed | [ALT1841216](https://nearbypermits.com/boston/permit/ALT1841216/) |

### Farther (1,000 ft to ¼ mi), 29 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 28, 2026 | [15 Westminster St](https://nearbypermits.com/boston/address/15-westminster-st/) | 0.20 mi SW | Alteration or repair | Insulation work as part of the MASS Save program. | $21,000 | [SF1900140](https://nearbypermits.com/boston/permit/SF1900140/) |
| Sep 2, 2026 | [257 Huntington Av](https://nearbypermits.com/boston/address/257-huntington-av/) | 0.21 mi N | Alteration or repair | Weatherization, Insulation, Air Sealing for 257 Huntington Ave #1 | $3,878 | [SF1895229](https://nearbypermits.com/boston/permit/SF1895229/) |
| Sep 1, 2026 | [60 Bradlee St](https://nearbypermits.com/boston/address/60-bradlee-st/) | 0.24 mi NE | Electrical | Full 100 AMP service replacement needed at site - Main service panel to be relocated to a code compliant location | $3,000 | [E1895638](https://nearbypermits.com/boston/permit/E1895638/) |
| Aug 31, 2026 | [34 Bradlee St](https://nearbypermits.com/boston/address/34-bradlee-st/) | 0.20 mi NE | Electrical | Install #10 AWG circuit with 35A 2-pole GFCI breaker to 60-amp AC disconnect with surge arrestersizing per manufacturer name plate. Install a 20-amp circuit with 20A AFCI/GFCI breaker for a service receptacle with in-use weatherproof cover. for a 3 ton heat pump | $3,000 | [E1895720](https://nearbypermits.com/boston/permit/E1895720/) |
| Aug 28, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.22 mi NE | Solar | Installation of roof mounted photovoltaic solar systems, 8.61 kw 21 panels with installation of 1 franklin battery installed on exterior of home | $77,400 | [SF1885555](https://nearbypermits.com/boston/permit/SF1885555/) |
| Aug 26, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.22 mi NE | Solar | Installation of roof mounted photovoltaic solar systems, 8.61 kw 21 panels with installation of 1 franklin battery installed on exterior of home | $77,400 | [E1885559](https://nearbypermits.com/boston/permit/E1885559/) |
| Aug 24, 2026 | [380 Huntington Av](https://nearbypermits.com/boston/address/380-huntington-av/) | 0.20 mi E | Alteration or repair | Residential weatherization/air sealing. No structural changes. (Site ID-881741) | $5,000 | [SF1882614](https://nearbypermits.com/boston/permit/SF1882614/) |
| Aug 24, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.24 mi NE | Plumbing | replace valve and drain | $1,500 | [PL1872512](https://nearbypermits.com/boston/permit/PL1872512/) |
| Jul 14, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.24 mi NE | Plumbing | replace valve and drain | $1,500 | [PL1871876](https://nearbypermits.com/boston/permit/PL1871876/) |
| Aug 24, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.22 mi NE | Electrical | New SPAN panel to be installed at site | $6,000 | [E1886077](https://nearbypermits.com/boston/permit/E1886077/) |
| Aug 19, 2026 | [50 Bradlee St](https://nearbypermits.com/boston/address/50-bradlee-st/) | 0.21 mi NE | New building | Subdivide lot for New Construction of a Two Family house, basement &; attic to remain unfinished, located at 50 Bradlee w/ 4 parking spaces(2-full &; 2- compact) and easement to 52 Bradlee (existing single to remain) w/ 2 parking spaces (1-full &; 1 compact).;e[Plan] filed.; | $600,000 | [ERT1598330](https://nearbypermits.com/boston/permit/ERT1598330/) |
| Aug 18, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.22 mi NE | Electrical | Low voltage alarm install | $1,200 | [ELV1887048](https://nearbypermits.com/boston/permit/ELV1887048/) |
| Aug 14, 2026 | [10 Park St](https://nearbypermits.com/boston/address/10-park-st/) | 0.22 mi S | Electrical | Install #10 AWG circuit with 35A 2-pole GFCI breaker to 60-amp AC disconnect with surge arrester sizing per manufacturer name plate. • Install a 20-amp circuit with 20A AFCI/GFCI breaker for a service receptacle with in-use weatherproof cover | $3,000 | [E1887361](https://nearbypermits.com/boston/permit/E1887361/) |
| Jul 28, 2026 | [17 Laval St](https://nearbypermits.com/boston/address/17-laval-st/) | 0.22 mi S | Alteration or repair | Pending;alt1860397 occupancy committeeremove and replace 11 windows; like for like size; no structural changes | $33,726 | [SF1859065](https://nearbypermits.com/boston/permit/SF1859065/) |
| Jul 23, 2026 | [380 Huntington Av](https://nearbypermits.com/boston/address/380-huntington-av/) | 0.20 mi E | Electrical | Northeastern Churchill AHU Upgrade. MISC Low Voltage HVAC Control Wiring KG 264258 | $10,145 | [ELV1859015](https://nearbypermits.com/boston/permit/ELV1859015/) |
| Jul 22, 2026 | [132 Central Av](https://nearbypermits.com/boston/address/132-central-av/) | 0.23 mi S | Fire systems | wire fire alarm | $2,500 | [EFA1875778](https://nearbypermits.com/boston/permit/EFA1875778/) |
| Jul 21, 2026 | [17 Laval St](https://nearbypermits.com/boston/address/17-laval-st/) | 0.22 mi S | Alteration or repair | Confirm occupancy of existing 1-family dwelling Related to Permit App #SF1859065 | Not listed | [ALT1860397](https://nearbypermits.com/boston/permit/ALT1860397/) |
| Jul 16, 2026 | [132 Central Av](https://nearbypermits.com/boston/address/132-central-av/) | 0.23 mi S | Plumbing | New bath New kit New laundry Water heaters | $14,600 | [PL1873522](https://nearbypermits.com/boston/permit/PL1873522/) |
| Jul 16, 2026 | [132 Central Av](https://nearbypermits.com/boston/address/132-central-av/) | 0.23 mi S | Plumbing | Water heaters Stove | $6,800 | [G1873531](https://nearbypermits.com/boston/permit/G1873531/) |
| Jul 14, 2026 | [132 Central Av](https://nearbypermits.com/boston/address/132-central-av/) | 0.23 mi S | Electrical | wire 4 units | $50,000 | [E1872319](https://nearbypermits.com/boston/permit/E1872319/) |
| Jun 25, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.24 mi NE | Other | Pending Occupancy Committee -;ALT1847980.TUB TO SHOWER; | $19,431 | [SF1847141](https://nearbypermits.com/boston/permit/SF1847141/) |
| Jun 10, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.24 mi NE | Alteration or repair | Confirm occupancy as a 1 family dwellingNO RECORD OF OCCUPANCYHOMEOWNER:: | Not listed | [ALT1847980](https://nearbypermits.com/boston/permit/ALT1847980/) |
| Jun 5, 2026 | [60 Bradlee St](https://nearbypermits.com/boston/address/60-bradlee-st/) | 0.24 mi NE | Solar | Installation of roof mounted photovoltaic solar systems, 4.92 kw 12 panels with installation of 1 franklin battery installed on exterior of home | $46,800 | [SF1844863](https://nearbypermits.com/boston/permit/SF1844863/) |
| May 14, 2026 | [60 Bradlee St](https://nearbypermits.com/boston/address/60-bradlee-st/) | 0.24 mi NE | Solar | Installation of roof mounted photovoltaic solar systems, 4.92 kw 12 panels with installation of 1 franklin battery installed on exterior of home | $46,800 | [E1844866](https://nearbypermits.com/boston/permit/E1844866/) |
| Jun 2, 2026 | [5 Manion Rd](https://nearbypermits.com/boston/address/5-manion-rd/) | 0.23 mi E | Solar | Temporarily remove and reinstall existing solar panels for roof work. | $499 | [E1856382](https://nearbypermits.com/boston/permit/E1856382/) |
| May 26, 2026 | [899 Hyde Park Av](https://nearbypermits.com/boston/address/899-hyde-park-av/) | 0.22 mi NW | Plumbing | Repair water main/ meter cracked and froze | $2,000 | [PL1845016](https://nearbypermits.com/boston/permit/PL1845016/) |
| May 8, 2026 | [899 Hyde Park Av](https://nearbypermits.com/boston/address/899-hyde-park-av/) | 0.22 mi NW | Alteration or repair | Reinforce and covering loading dock-deck | $3,500 | [SF1844871](https://nearbypermits.com/boston/permit/SF1844871/) |
| May 4, 2026 | [34 Bradlee St](https://nearbypermits.com/boston/address/34-bradlee-st/) | 0.20 mi NE | Roofing | Replace roof shingles | $18,600 | [SF1845405](https://nearbypermits.com/boston/permit/SF1845405/) |
| May 4, 2026 | [97 Tacoma St](https://nearbypermits.com/boston/address/97-tacoma-st/) | 0.23 mi NE | Alteration or repair | Residential weatherization/air sealing. No structural changes. (Site ID-850979) yr2 | $3,000 | [SF1841499](https://nearbypermits.com/boston/permit/SF1841499/) |

## Zoning requests nearby

There are no zoning requests on file within ¼ mi. Boston's feed was last read Oct 9.

## More on this street

Other addresses on Thatcher St with permits, nearest house number first:

- [24 Thatcher St](https://nearbypermits.com/boston/address/24-thatcher-st/): newest permit Jan 21, 2026
- [8 Thatcher St](https://nearbypermits.com/boston/address/8-thatcher-st/): newest permit Sep 16, 2026
- [7 Thatcher St](https://nearbypermits.com/boston/address/7-thatcher-st/): newest permit Nov 6, 2024
- [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/): newest permit Jul 7, 2026
- [3-5 Thatcher St](https://nearbypermits.com/boston/address/3--5-thatcher-st/): newest permit May 14, 2026
- [50 Thatcher St](https://nearbypermits.com/boston/address/50-thatcher-st/): newest permit Jan 2, 2025
- [57 Thatcher St](https://nearbypermits.com/boston/address/57-thatcher-st/): newest permit Sep 17, 2026

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-09 20:07 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Zoning requests come from the Boston Zoning Board of Appeal tracker (https://data.boston.gov/dataset/zoning-board-of-appeal-tracker). We read it Oct 9, 19:47 UTC.

Map, all 6 permits at this address and 51 nearby: https://nearbypermits.com/boston/address/19-thatcher-st/
