# Building permits at 240 Heath St, Boston, MA

The biggest project within a quarter mile since May 1: a $1.5M project at 125 Parker Hill Av, permitted Jul 30.

13 permits on record here. The newest, Aug 1, 2025: Install 1 -2 wide d/h window a nd 1 entry door for replacement no structural changes. Within a quarter mile, the city has issued 38 more permits (36 projects) since May 1. A zoning hearing Nov 10 covers 130 Minden St, 780 ft southeast.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Aug 1, 2025 | Alteration or repair | Install 1 -2 wide d/h window a nd 1 entry door for replacement no structural changes | $17,090 | [SF1754092](https://nearbypermits.com/boston/permit/SF1754092/) |
| Jun 27, 2019 | Electrical | water leak need to be replace fixture | $800 | [E968850](https://nearbypermits.com/boston/permit/E968850/) |
| Apr 26, 2019 | Alteration or repair | Unit 10-Remove damaged sheetrock from ceiling due to;water leak. Insulate, sheetrock, paint and add new light fixture. | $16,070 | [SF933742](https://nearbypermits.com/boston/permit/SF933742/) |
| Aug 29, 2016 | Electrical | Remove old existing outlets and install new outlets | $1,000 | [E631282](https://nearbypermits.com/boston/permit/E631282/) |
| Sep 25, 2015 | Alteration or repair | Replace 10 windows in kind | $30,870 | [SF523320](https://nearbypermits.com/boston/permit/SF523320/) |
| May 6, 2013 | Plumbing | Replace toilet. | Not listed | [PL241298](https://nearbypermits.com/boston/permit/PL241298/) |
| Aug 18, 2011 | Plumbing | replace elec hwh | $1,000 | [PL88776](https://nearbypermits.com/boston/permit/PL88776/) |
| Aug 18, 2011 | Electrical | replace hwh | $500 | [E88780](https://nearbypermits.com/boston/permit/E88780/) |
| Jul 5, 2011 | Plumbing | Residential replacement of hot water heater | $1,618 | [PL83683](https://nearbypermits.com/boston/permit/PL83683/) |
| May 6, 2011 | Plumbing | replace water heater | $1,105 | [PL67680](https://nearbypermits.com/boston/permit/PL67680/) |
| Feb 9, 2011 | Plumbing | replace elec water heater | $1,080 | [PL57888](https://nearbypermits.com/boston/permit/PL57888/) |
| Oct 14, 2010 | Alteration or repair | Completion of the masonry re-pointing project. Installation of new metal flashing, sand blasting and painting of metal work | $409,000 | [SF47121](https://nearbypermits.com/boston/permit/SF47121/) |
| Apr 14, 2010 | Electrical | water heater | Not listed | [E19821](https://nearbypermits.com/boston/permit/E19821/) |

## Within ¼ mi since May 1, 2026

38 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 18 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 5, 2026 | [40 Day St](https://nearbypermits.com/boston/address/40-day-st/) | 610 ft S | Plumbing | disconnect existing gas line from old existing oven and reconnect gas to new oven provided by customer | $540 | [G1906165](https://nearbypermits.com/boston/permit/G1906165/) |
| Sep 30, 2026 | [29 Lawn St](https://nearbypermits.com/boston/address/29-lawn-st/) | 970 ft E | Plumbing | Adding 2 half bath and 3 laundry for each floor. | $7,000 | [PL1902945](https://nearbypermits.com/boston/permit/PL1902945/) |
| Sep 29, 2026 | [64-66 Lawn St](https://nearbypermits.com/boston/address/64--66-lawn-st/) | 520 ft E | Plumbing | Replacement of like-for-like electric water heater at 66 Lawn Street | $1,349 | [PL1904641](https://nearbypermits.com/boston/permit/PL1904641/) |
| Sep 28, 2026 | [110-120 Fisher Av](https://nearbypermits.com/boston/address/110--120-fisher-av/) | 890 ft E | Electrical | Make necessary modifications and final connections of existing wiring and equipment associated with the emergency generator system. | $21,000 | [E1904428](https://nearbypermits.com/boston/permit/E1904428/) |
| Sep 25, 2026 | [20 Edge Hill St](https://nearbypermits.com/boston/address/20-edge-hill-st/) | 980 ft S | Electrical | Forge will install and wire a dual fuel heat pump system. This system will consist of one outdoor condenser and one cased heat pump coil which will be mounted to the existing furnace and adapted into the existing ductwork. Forge will also be doing a service upgrade of 100 AMP to 200 AMP. | $3,275 | [E1904081](https://nearbypermits.com/boston/permit/E1904081/) |
| Aug 3, 2026 | [200 Heath St](https://nearbypermits.com/boston/address/200-heath-st/) | 450 ft SE | Electrical | Disconnect & make safe feeds for (2) condensers & fans for existing freezer & cooler. Extend existing feeds for (2) new condensers on exterior wall & reconnect feeds for new fans & lighting in new freezer & cooler. Add a convenience outlet near exterior condensers. | $15,000 | [E1881054](https://nearbypermits.com/boston/permit/E1881054/) |
| Jul 28, 2026 | [6 Schiller St](https://nearbypermits.com/boston/address/6-schiller-st/) | 930 ft SE | Plumbing | Remove and replace (3) combi boilers | $21,000 | [PL1874104](https://nearbypermits.com/boston/permit/PL1874104/) |
| Jul 28, 2026 | [6 Schiller St](https://nearbypermits.com/boston/address/6-schiller-st/) | 930 ft SE | Plumbing | Remove and replace (3) combi boilers. | $21,000 | [G1874098](https://nearbypermits.com/boston/permit/G1874098/) |
| Jun 16, 2026 | [219 Heath St](https://nearbypermits.com/boston/address/219-heath-st/) | 470 ft E | Electrical | Installation of new handhole in sidewalk at 215-221 Heath Street. Install 30 amp underground service from Eversource Manhole. Install #6 conductors and 30 Amp Fused H-tap in Handhole for future Crown Castle pole. Dor_exp-003 | $1,500 | [E1861520](https://nearbypermits.com/boston/permit/E1861520/) |
| Jun 8, 2026 | [3 Kenney St](https://nearbypermits.com/boston/address/3-kenney-st/) | 920 ft S | Alteration or repair | Residential weatherization and air sealing with the Mass Save Prohgram. No structural changes. | $1,695 | [SF1852157](https://nearbypermits.com/boston/permit/SF1852157/) |
| May 20, 2026 | [150-220 S Huntington Av](https://nearbypermits.com/boston/address/150--220-s-huntington-av/) | 520 ft W | Electrical | Installation of gas monitors. add 120v receptacles to power new monitors. | $87,165 | [E1850640](https://nearbypermits.com/boston/permit/E1850640/) |
| May 19, 2026 | [2-24 Ellingwood St](https://nearbypermits.com/boston/address/2--24-ellingwood-st/) | 490 ft N | Plumbing | Replacement of electric water heater at 6 ELLINGWOOD STREET | $3,936 | [PL1850301](https://nearbypermits.com/boston/permit/PL1850301/) |
| May 12, 2026 | [148 Minden St](https://nearbypermits.com/boston/address/148-minden-st/) | 620 ft SE | Fence, wall or deck | Remove and replace existing deck, stairs, railings, framing, sonotubes, posts, and colums. Install new 12"x4' sonotubes, framing, comoposite decking, PVC railings, posts/post sleeves, and stairs. Paint perimeter framing and post bases. | $41,900 | [SF1848648](https://nearbypermits.com/boston/permit/SF1848648/) |
| May 12, 2026 | [40 Day St](https://nearbypermits.com/boston/address/40-day-st/) | 610 ft S | Fence, wall or deck | Remove and replace existing deck, stairs, railings, framing, sonotubes, posts, and colums. Install new 12"x4" sonotubes, framing, composite decking, PVC railings, posts/post sleeves, and stairs. Paint perimeter framing and post bases. | $49,800 | [SF1848645](https://nearbypermits.com/boston/permit/SF1848645/) |
| May 12, 2026 | [115-115a Fisher Av](https://nearbypermits.com/boston/address/115--115a-fisher-av/) | 940 ft NE | Plumbing | Replace shower valve and vanity | $2,500 | [PL1847361](https://nearbypermits.com/boston/permit/PL1847361/) |
| May 5, 2026 | [115-115a Fisher Av](https://nearbypermits.com/boston/address/115--115a-fisher-av/) | 940 ft NE | Electrical | demo and make safe for others electric wires in the bathroom first floor | $600 | [E1845636](https://nearbypermits.com/boston/permit/E1845636/) |
| May 4, 2026 | [2-24 Ellingwood St](https://nearbypermits.com/boston/address/2--24-ellingwood-st/) | 490 ft N | Electrical | Install new feeder cables to 5 units from the meter socket to the load cenetrs. Install coaxial cable to 5 units as well | $18,400 | [E1844689](https://nearbypermits.com/boston/permit/E1844689/) |
| May 1, 2026 | [251 Heath St](https://nearbypermits.com/boston/address/251-heath-st/) | 320 ft N | Fire systems | Replace existing fire alarm system which is obsolete, with a new Edwards EST4 fire alarm panel, and associated devices for compatibility with the new system. Existing wiring and device locations will be utilized | $200,795 | [ALT1830311](https://nearbypermits.com/boston/permit/ALT1830311/) |

### Farther (1,000 ft to ¼ mi), 20 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 16, 2026 | [125 Parker Hill Av](https://nearbypermits.com/boston/address/125-parker-hill-av/) | 0.21 mi N | Plumbing | Replace roof drains | $20,000 | [PL1901073](https://nearbypermits.com/boston/permit/PL1901073/) |
| Aug 21, 2026 | [31 Gay Head St](https://nearbypermits.com/boston/address/31-gay-head-st/) | 0.23 mi SE | Alteration or repair | Change occupancy from three-family to four-family. Build a new kitchen on the ground floor, new sprinkler, and fire alarm systems. [ePlan] | $50,000 | [ALT1195079](https://nearbypermits.com/boston/permit/ALT1195079/) |
| Aug 17, 2026 | [154-162 Heath St](https://nearbypermits.com/boston/address/154--162-heath-st/) | 0.24 mi E | Electrical | Low Voltage HVAC Control Wiring | $50,000 | [ELV1886728](https://nearbypermits.com/boston/permit/ELV1886728/) |
| Aug 6, 2026 | [3 Edge Hill St](https://nearbypermits.com/boston/address/3-edge-hill-st/) | 0.22 mi SE | Electrical | Installation of a new high voltage electrical for (1) system. Includes: - New disconnect with surge protector built-in - New GFCI - New dedicated circuit - New wiring for the HVAC system | $1,050 | [E1882606](https://nearbypermits.com/boston/permit/E1882606/) |
| Jul 30, 2026 | [125 Parker Hill Av](https://nearbypermits.com/boston/address/125-parker-hill-av/) | 0.21 mi N | Roofing | Remove and replace roof | $1,462,500 | [SF1877552](https://nearbypermits.com/boston/permit/SF1877552/) |
| Jul 29, 2026 | [35 Creighton St](https://nearbypermits.com/boston/address/35-creighton-st/) | 0.23 mi S | Alteration or repair | Interior water damage repair of existing building includes repair and patching of interior walls and ceilings (gypsum board/plasters as needed) and repair of existing floor areas, including replacement of damaged sections. The work is limited to like-kind repairs with on structural alterations. | $28,000 | [SF1873583](https://nearbypermits.com/boston/permit/SF1873583/) |
| Jul 28, 2026 | [125 Parker Hill Av](https://nearbypermits.com/boston/address/125-parker-hill-av/) | 0.21 mi N | Plumbing | Replacement of the 2 water heaters in the basement mechanical room. | $76,000 | [PL1877747](https://nearbypermits.com/boston/permit/PL1877747/) |
| Jul 28, 2026 | [25 Gay Head St](https://nearbypermits.com/boston/address/25-gay-head-st/) | 0.24 mi SE | Plumbing | Remove and replace (2) combi boilers | $14,000 | [PL1874161](https://nearbypermits.com/boston/permit/PL1874161/) |
| Jul 28, 2026 | [25 Gay Head St](https://nearbypermits.com/boston/address/25-gay-head-st/) | 0.24 mi SE | Plumbing | Remove and replace (2) combi boilers | $14,000 | [G1874159](https://nearbypermits.com/boston/permit/G1874159/) |
| Jul 23, 2026 | [31 Round Hill St](https://nearbypermits.com/boston/address/31-round-hill-st/) | 0.21 mi SE | Roofing | Remove and replace asphalt shingles. Like to like materials. | $12,950 | [SF1873797](https://nearbypermits.com/boston/permit/SF1873797/) |
| Jul 21, 2026 | [21 Evergreen St](https://nearbypermits.com/boston/address/21-evergreen-st/) | 0.20 mi SW | Alteration or repair | Confirm legal occupancy as an existing one-family residential dwelling. No construction or alterations proposed.; | Not listed | [ALT1871826](https://nearbypermits.com/boston/permit/ALT1871826/) |
| Jul 17, 2026 | [21 Evergreen St](https://nearbypermits.com/boston/address/21-evergreen-st/) | 0.20 mi SW | Roofing | Pending;ALT1871826 Occupancy Committee.Remove and replace existing gutters and gutter guards. Replace deteriorated fascia and soffit boards as needed. Remove improperly installed asphalt shingles over existing slate roof and restore slate roofing with matching replacement slates. No structural alter | $13,192 | [SF1867988](https://nearbypermits.com/boston/permit/SF1867988/) |
| Jul 13, 2026 | [44 Evergreen St](https://nearbypermits.com/boston/address/44-evergreen-st/) | 0.24 mi SW | Electrical | Install EV charger for Unit #3. Located in Unit #3 garage bay. | $1,200 | [E1871742](https://nearbypermits.com/boston/permit/E1871742/) |
| Jul 10, 2026 | [31 Evergreen St](https://nearbypermits.com/boston/address/31-evergreen-st/) | 0.22 mi SW | Plumbing | gas fireplace | $350 | [G1871096](https://nearbypermits.com/boston/permit/G1871096/) |
| Jun 8, 2026 | [123-127 Heath St](https://nearbypermits.com/boston/address/123--127-heath-st/) | 0.25 mi E | Alteration or repair | Heath Street Partners, LLC, as owner of the property located at 127 Heath Street with Parcel ID: 1001281000 (the "Premises") desires to file Long Form Applications to subdivide the Premises into eight (8) separate parcels, as per the submitted plans (the "Subdivision"). The 7 premises in the residen | Not listed | [ALT1823395](https://nearbypermits.com/boston/permit/ALT1823395/) |
| Jun 3, 2026 | [35 Creighton St](https://nearbypermits.com/boston/address/35-creighton-st/) | 0.23 mi S | Electrical | Water damage repair. Replace misc. lights in unit 101, hallway, office and run circuit to room 203 to separate power. Replace breakers as needed. *Go out on emergency for water damage and re-store power. | $5,000 | [E1856990](https://nearbypermits.com/boston/permit/E1856990/) |
| May 14, 2026 | [18 Lawn St](https://nearbypermits.com/boston/address/18-lawn-st/) | 0.20 mi E | Alteration or repair | Roof Remodeling: Replace roofing, clear old roof, install insultaion, add metal fleche, and new rubber. Deck Renovation: New flooring, new railing, new pvc finish. | $31,000 | [SF1847206](https://nearbypermits.com/boston/permit/SF1847206/) |
| May 7, 2026 | [11 Bynner St](https://nearbypermits.com/boston/address/11-bynner-st/) | 0.24 mi S | Plumbing | Kitchen remodel | $3,000 | [PL1846680](https://nearbypermits.com/boston/permit/PL1846680/) |
| May 5, 2026 | [11 Bynner St](https://nearbypermits.com/boston/address/11-bynner-st/) | 0.24 mi S | Electrical | Rewire kitchen and changeout existing subpanel to newer model as well as the feeder | $6,500 | [E1845109](https://nearbypermits.com/boston/permit/E1845109/) |
| May 4, 2026 | [178 Heath St](https://nearbypermits.com/boston/address/178-heath-st/) | 0.19 mi E | Plumbing | Replacement of water heater | $4,000 | [PL1844529](https://nearbypermits.com/boston/permit/PL1844529/) |

## Zoning requests nearby

Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.

| Status | Hearing | Address | Distance | Request | Case | City's words | Filed |
|---|---|---|---|---|---|---|---|
| Requested | Nov 10, 2026 | 130 Minden St | 780 ft SE | Zoning appeal: "3rd floor Dormer 3rd Floor Bathroom Deck Repairs and code Adjustment HVAC installation…" | [BOA1870745](https://www.boston.gov/appeal-tracker) | "Hearing Scheduled" | 2026-07-09 |
| No decision posted | Oct 6, 2026 | 5 Lawn St | 0.22 mi E | To add addition and deck per attached drawing | [BOA1846937](https://www.boston.gov/appeal-tracker) | "Hearing Concluded" | 2026-05-07 |
| Requested |  | 76 Day St | 0.20 mi S | Zoning appeal: "No construction is required" | [BOA1829286](https://www.boston.gov/appeal-tracker) | "Community Process" | 2026-03-18 |

## More on this street

Other addresses on Heath St with permits, nearest house number first:

- [251 Heath St](https://nearbypermits.com/boston/address/251-heath-st/): newest permit May 1, 2026
- [225 Heath St](https://nearbypermits.com/boston/address/225-heath-st/): newest permit May 20, 2025
- [223 Heath St](https://nearbypermits.com/boston/address/223-heath-st/): newest permit May 20, 2025
- [219 Heath St](https://nearbypermits.com/boston/address/219-heath-st/): newest permit Jun 16, 2026
- [200 Heath St](https://nearbypermits.com/boston/address/200-heath-st/): newest permit Aug 3, 2026
- [197 Heath St](https://nearbypermits.com/boston/address/197-heath-st/): newest permit May 21, 2025
- [193 Heath St](https://nearbypermits.com/boston/address/193-heath-st/): newest permit Mar 28, 2025
- [191-225 Heath St](https://nearbypermits.com/boston/address/191--225-heath-st/): newest permit May 21, 2025
- [182 Heath St](https://nearbypermits.com/boston/address/182-heath-st/): newest permit Feb 27, 2026
- [179 Heath St](https://nearbypermits.com/boston/address/179-heath-st/): newest permit Dec 16, 2024

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-11 16:59 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Zoning requests come from the Boston Zoning Board of Appeal tracker (https://data.boston.gov/dataset/zoning-board-of-appeal-tracker). We read it Oct 11, 10:47 UTC.

Map, all 13 permits at this address and 38 nearby: https://nearbypermits.com/boston/address/240-heath-st/
