# Building permits at 41 Glenhill Rd, Boston, MA

The biggest project within a quarter mile since May 1: a $750,000 new building at 96 Standard St, permitted Sep 17.

Six permits on record here. The newest, Apr 29: Installation of roof mounted photovoltaic solar systems. Within a quarter mile, the city has issued 40 more permits (36 projects) since May 1. One is for a new building, 0.23 mi away.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Apr 29, 2026 | Solar | Installation of roof mounted photovoltaic solar systems, 5.74 KW 14 panels NO BATTERY STORAGE | $27,900 | [SF1842231](https://nearbypermits.com/boston/permit/SF1842231/) |
| Apr 29, 2026 | Solar | Installation of roof mounted photovoltaic solar systems, 5.74 KW 14 panels NO BATTERY STORAGE | $27,900 | [E1842234](https://nearbypermits.com/boston/permit/E1842234/) |
| Mar 12, 2025 | Electrical | Bathroom fan install | $1,109 | [E1697388](https://nearbypermits.com/boston/permit/E1697388/) |
| Feb 28, 2025 | Electrical | Replace variable speed fan, with controls. | $2,000 | [E1692184](https://nearbypermits.com/boston/permit/E1692184/) |
| Oct 2, 2024 | Electrical | Wire two mini splits and upgrade service to 200a | $5,200 | [E1652508](https://nearbypermits.com/boston/permit/E1652508/) |
| Mar 2, 2023 | Electrical | New 100A riser and meter main with refeed, New 125/100A main panel | $4,600 | [E1445080](https://nearbypermits.com/boston/permit/E1445080/) |

## Within ¼ mi since May 1, 2026

40 permits in the circle. From our copy of the city's data (last 24 months).

### Next door (under 250 ft), 4 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 15, 2026 | [37 Glenhill Rd](https://nearbypermits.com/boston/address/37-glenhill-rd/) | 95 ft NE | Electrical | Rewire two family Upgrade service to 200 amps Add public meter | $28,000 | [E1900756](https://nearbypermits.com/boston/permit/E1900756/) |
| Jul 20, 2026 | [30 Glenhill Rd](https://nearbypermits.com/boston/address/30-glenhill-rd/) | 150 ft E | Electrical | Low voltage alarm install | $1,200 | [ELV1873119](https://nearbypermits.com/boston/permit/ELV1873119/) |
| May 14, 2026 | [37 Glenhill Rd](https://nearbypermits.com/boston/address/37-glenhill-rd/) | 95 ft NE | Plumbing | Install two gas furnace and stove on 2nd floor | $10,000 | [G1848965](https://nearbypermits.com/boston/permit/G1848965/) |
| May 12, 2026 | [37 Glenhill Rd](https://nearbypermits.com/boston/address/37-glenhill-rd/) | 95 ft NE | Plumbing | Plumbing renovation | $25,000 | [PL1848333](https://nearbypermits.com/boston/permit/PL1848333/) |

### This block (250 to 1,000 ft), 27 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 2, 2026 | [23 Owen St](https://nearbypermits.com/boston/address/23-owen-st/) | 700 ft NE | Alteration or repair | install 22 replacement windows - no structural changes | $25,711 | [SF1905229](https://nearbypermits.com/boston/permit/SF1905229/) |
| Sep 29, 2026 | [5 Stow Rd](https://nearbypermits.com/boston/address/5-stow-rd/) | 550 ft N | Alteration or repair | Demolition of 2 Existing Bathrooms & 1 Kitchen. Installation of new kitchen & 2 bathrooms, Plumbing rough/finishes, Upgrade Electric service & wiring/smokes throughout the house. Insulation Install, drywall & Painting. | $154,000 | [SF1904945](https://nearbypermits.com/boston/permit/SF1904945/) |
| Sep 16, 2026 | [9-11 Lorna Rd](https://nearbypermits.com/boston/address/9--11-lorna-rd/) | 940 ft N | Roofing | Shingle Roof strip and cover | $14,000 | [SF1901735](https://nearbypermits.com/boston/permit/SF1901735/) |
| Sep 3, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Solar | 6.09 Kw dc & 5.32 kw ac grid tied photovoltaic system, no ESS | $13,763 | [SF1896745](https://nearbypermits.com/boston/permit/SF1896745/) |
| Sep 2, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Solar | 6.09 Kw dc & 5.32 kw ac grid tied photovoltaic system, no ESS | $13,763 | [E1896747](https://nearbypermits.com/boston/permit/E1896747/) |
| Aug 19, 2026 | [86 Lorna Rd](https://nearbypermits.com/boston/address/86-lorna-rd/) | 320 ft NW | Solar | Installation of roof mounted photovoltaic solar systems, 4.92 kw 12 panels with installation of 1 tesla powerwall3 battery installed on exterior of home | $58,500 | [E1867924](https://nearbypermits.com/boston/permit/E1867924/) |
| Jul 13, 2026 | [86 Lorna Rd](https://nearbypermits.com/boston/address/86-lorna-rd/) | 320 ft NW | Solar | Installation of roof mounted photovoltaic solar systems, 4.92 kw 12 panels with installation of 1 tesla powerwall3 battery installed on exterior of home | $58,500 | [SF1867918](https://nearbypermits.com/boston/permit/SF1867918/) |
| Jul 30, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Fire systems | Install new local smoke detectors for front and back common area entries | $2,000 | [EFA1879696](https://nearbypermits.com/boston/permit/EFA1879696/) |
| Jul 30, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Electrical | Install new 100AMP sub panel in unit 2. Bathroom renovation. New laundry. Living room and dinning room renovation. Install new baseboard heaters throughout the unit. Install new lighting for front and back common area stairs. | $11,000 | [E1879687](https://nearbypermits.com/boston/permit/E1879687/) |
| Jul 29, 2026 | [38 Tiverton Rd](https://nearbypermits.com/boston/address/38-tiverton-rd/) | 670 ft NE | Roofing | Remove existing asphalt shingles and install new GAF architectural shingles, synthetic underlayment, 6' ice & water shield, drip edge, ridge vent, chimney flashing, pipe flashings, and 2 SQ of EPDM roofing on low-slope section. Replace damaged sheathing as needed. | $8,600 | [SF1874800](https://nearbypermits.com/boston/permit/SF1874800/) |
| Jul 17, 2026 | [93 W Selden St](https://nearbypermits.com/boston/address/93-w-selden-st/) | 770 ft W | Plumbing | Removal of up to 5 linear feet of cast iron at foundation wall inside. Installation of service clean out. Snaking and flushing main sewer line. | $4,200 | [PL1873842](https://nearbypermits.com/boston/permit/PL1873842/) |
| Jul 13, 2026 | [957 Morton St](https://nearbypermits.com/boston/address/957-morton-st/) | 930 ft N | Roofing | replace the rubber root | $20,000 | [SF1871611](https://nearbypermits.com/boston/permit/SF1871611/) |
| Jul 7, 2026 | [135 Lorna Rd](https://nearbypermits.com/boston/address/135-lorna-rd/) | 920 ft SW | Alteration or repair | The existing deck will be completely removed and disposed of. A new deck will then be constructed in the same location and with the same dimensions as the existing structure, measuring approximately 5' x 15', as shown in the attached photos and project plans. All work will be performed in accordance | $9,200 | [SF1863085](https://nearbypermits.com/boston/permit/SF1863085/) |
| Jul 2, 2026 | [86 Lorna Rd](https://nearbypermits.com/boston/address/86-lorna-rd/) | 320 ft NW | Electrical | Install SPAN Panel | $6,000 | [E1867620](https://nearbypermits.com/boston/permit/E1867620/) |
| Jul 1, 2026 | [7 Glenhill Rd](https://nearbypermits.com/boston/address/7-glenhill-rd/) | 500 ft NE | Solar | Installing rooftop railed solar PV of 3.28 KW and 8 modules. No ESS installation. | $3,828 | [SF1863625](https://nearbypermits.com/boston/permit/SF1863625/) |
| Jun 25, 2026 | [7 Glenhill Rd](https://nearbypermits.com/boston/address/7-glenhill-rd/) | 500 ft NE | Solar | Installing rooftop railed solar PV of 3.28 KW and 8 modules. No ESS installation. | $8,931 | [E1863630](https://nearbypermits.com/boston/permit/E1863630/) |
| Jun 16, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Plumbing | remodel 3rd floor bathroom | $10,000 | [PL1861103](https://nearbypermits.com/boston/permit/PL1861103/) |
| Jun 15, 2026 | [107 Lorna Rd](https://nearbypermits.com/boston/address/107-lorna-rd/) | 560 ft W | Electrical | Installation of a new bathroom exhaust fan in the 2nd floor bathroom | $400 | [E1861007](https://nearbypermits.com/boston/permit/E1861007/) |
| Jun 12, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Alteration or repair | bathroom and kitchen renovation complete with all new fixtures/appliances etc to include electrical & plumbing, window and trim install, install lvl between kitchen and dining room & living room and hall, prep & paint throughout and installation of flooring. | $65,000 | [SF1860304](https://nearbypermits.com/boston/permit/SF1860304/) |
| Jun 4, 2026 | [119 W Selden St](https://nearbypermits.com/boston/address/119-w-selden-st/) | 900 ft W | Electrical | Upgrade service for 100 amps to 200 amps | $7,000 | [E1857541](https://nearbypermits.com/boston/permit/E1857541/) |
| May 30, 2026 | [21 Doone Av](https://nearbypermits.com/boston/address/21-doone-av/) | 280 ft NE | Alteration or repair | Blown cellulose in attic and walls. Additional weatherization including air sealing, weather strips, and knee wall insulation. | $9,507 | [SF1852713](https://nearbypermits.com/boston/permit/SF1852713/) |
| May 28, 2026 | [107 Lorna Rd](https://nearbypermits.com/boston/address/107-lorna-rd/) | 560 ft W | Plumbing | Renovate bathroom (shower, lav and toilet) | $1,500 | [PL1855518](https://nearbypermits.com/boston/permit/PL1855518/) |
| May 20, 2026 | [65 Lorna Rd](https://nearbypermits.com/boston/address/65-lorna-rd/) | 480 ft NW | Solar | Installation of roof mounted photovoltaic solar systems, 11.89 kw 29 panels with installation of 1 franklin battery installed on exterior of home | $68,700 | [SF1850105](https://nearbypermits.com/boston/permit/SF1850105/) |
| May 20, 2026 | [65 Lorna Rd](https://nearbypermits.com/boston/address/65-lorna-rd/) | 480 ft NW | Solar | Installation of roof mounted photovoltaic solar systems, 11.89 kw 29 panels with installation of 1 franklin battery installed on exterior of home | $68,700 | [E1850115](https://nearbypermits.com/boston/permit/E1850115/) |
| May 20, 2026 | [107 Lorna Rd](https://nearbypermits.com/boston/address/107-lorna-rd/) | 560 ft W | Alteration or repair | Bathtub replacement with LVT flooring, new vanity & R&R toilet. All new fixtures like for like within same footprint as existing. No structural changes. Plumber will pull their own permit. All debris leaves job site with crew. | $19,000 | [SF1849426](https://nearbypermits.com/boston/permit/SF1849426/) |
| May 6, 2026 | [15 Stow Rd](https://nearbypermits.com/boston/address/15-stow-rd/) | 430 ft N | Electrical | Low voltage alarm install | $1,200 | [ELV1845673](https://nearbypermits.com/boston/permit/ELV1845673/) |
| May 4, 2026 | [42 Tiverton Rd](https://nearbypermits.com/boston/address/42-tiverton-rd/) | 680 ft NE | Alteration or repair | Repair rear porchby removing dilapadated roof, steps, railings and flooring. | $20,000 | [SF1845518](https://nearbypermits.com/boston/permit/SF1845518/) |

### Farther (1,000 ft to ¼ mi), 9 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 17, 2026 | [96 Standard St](https://nearbypermits.com/boston/address/96-standard-st/) | 0.23 mi SE | New building | Proposed 3-story, 3-dwelling-unit residential structure with an unfinished basement (non-habitable space) and a single means of egress. Equipped with a fire alarm system and an NFPA 13R fire sprinkler system. Includes 3 parking spaces, 1 EV-ready charging space and solar-ready infrastructure.; Subje | $750,000 | [ERT1652131](https://nearbypermits.com/boston/permit/ERT1652131/) |
| Sep 17, 2026 | [11 Donwood Te](https://nearbypermits.com/boston/address/11-donwood-te/) | 0.24 mi SW | Electrical | Building service upgrade. Connections to (2) condensers + (2) air handlers in the basement. New insulated ductwork to be installed. | $25,000 | [E1900677](https://nearbypermits.com/boston/permit/E1900677/) |
| Sep 15, 2026 | [21 W Selden St](https://nearbypermits.com/boston/address/21-w-selden-st/) | 0.19 mi N | Electrical | Install #10 AWG circuit with 35A 2-pole GFCI breaker to 60A AC disconnect with surge arrester Install #12 AWG circuit with 20A 2-pole GFCI breaker to 60A AC disconnect with surge arrester Install a 20A circuit with 20A AFCI/GFCI breaker for a service receptacle For a 5.5 heat pump system for apt 1 | $3,000 | [E1900014](https://nearbypermits.com/boston/permit/E1900014/) |
| Sep 9, 2026 | [11 Donwood Te](https://nearbypermits.com/boston/address/11-donwood-te/) | 0.24 mi SW | Electrical | run circuit for ev charger change outlet for microwave | $750 | [E1899749](https://nearbypermits.com/boston/permit/E1899749/) |
| Aug 24, 2026 | [11 Donwood Te](https://nearbypermits.com/boston/address/11-donwood-te/) | 0.24 mi SW | Plumbing | Replace 2 electric water heaters | $2,000 | [PL1891681](https://nearbypermits.com/boston/permit/PL1891681/) |
| Aug 20, 2026 | [11 Donwood Te](https://nearbypermits.com/boston/address/11-donwood-te/) | 0.24 mi SW | Alteration or repair | Replace water heater, stove, microwave, bathroom fans in unit 1 and 2. Install one basement window. Repair kitchen ext. window trim and sidings. | $73,300 | [SF1888557](https://nearbypermits.com/boston/permit/SF1888557/) |
| Aug 19, 2026 | [11 Donwood Te](https://nearbypermits.com/boston/address/11-donwood-te/) | 0.24 mi SW | Electrical | wire 2 stoves wire 2 hot water heater | $1,500 | [E1889230](https://nearbypermits.com/boston/permit/E1889230/) |
| Jun 16, 2026 | [11 Donwood Te](https://nearbypermits.com/boston/address/11-donwood-te/) | 0.24 mi SW | Alteration or repair | Demo chimney. Replace basement vinyl window. Insulate basement walls and crawl space wall. Repair concrete and siding. Replace water heaters. Install new heat pump dryer. Replace duct. Install new induction ranges, hood w/fan and light. Asbestos abatement. | $84,250 | [SF1859432](https://nearbypermits.com/boston/permit/SF1859432/) |
| May 28, 2026 | [318 Fuller St](https://nearbypermits.com/boston/address/318-fuller-st/) | 0.23 mi NE | Electrical | Upgrade whole apartment wiring which needs replaced in unit 3 | $6,500 | [E1853730](https://nearbypermits.com/boston/permit/E1853730/) |

## Zoning requests nearby

There are no zoning requests on file within ¼ mi. Boston's feed was last read Oct 13.

## More on this street

Other addresses on Glenhill Rd with permits, nearest house number first:

- [37 Glenhill Rd](https://nearbypermits.com/boston/address/37-glenhill-rd/): newest permit Sep 15, 2026
- [33-35 Glenhill Rd](https://nearbypermits.com/boston/address/33--35-glenhill-rd/): newest permit Jun 5, 2025
- [31 Glenhill Rd](https://nearbypermits.com/boston/address/31-glenhill-rd/): newest permit Apr 9, 2026
- [30 Glenhill Rd](https://nearbypermits.com/boston/address/30-glenhill-rd/): newest permit Jul 20, 2026
- [27 Glenhill Rd](https://nearbypermits.com/boston/address/27-glenhill-rd/): newest permit Nov 18, 2024
- [7 Glenhill Rd](https://nearbypermits.com/boston/address/7-glenhill-rd/): newest permit Jul 1, 2026

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-13 08:14 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Zoning requests come from the Boston Zoning Board of Appeal tracker (https://data.boston.gov/dataset/zoning-board-of-appeal-tracker). We read it Oct 13, 01:47 UTC.

Map, all 6 permits at this address and 40 nearby: https://nearbypermits.com/boston/address/41-glenhill-rd/
