# Building permits at 472 Metropolitan Av, Boston, MA

The biggest project within a quarter mile since May 1: a $900,000 project at 804 Hyde Park Av, permitted May 7.

Four permits on record here. The newest, Jun 8: Secure property post fire damage, windows and doors. Within a quarter mile, the city has issued 40 more permits (36 projects) since May 1. One is for a new building, 0.19 mi away.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Jun 8, 2026 | Alteration or repair | secure property post fire damage, windows and doors | $1,000 | [SF1851762](https://nearbypermits.com/boston/permit/SF1851762/) |
| May 7, 2026 | Electrical | Make safe due to water and fire damage, added 2 new outdoor disconnects for temp. panels to feed remediation equipment | $2,000 | [E1846907](https://nearbypermits.com/boston/permit/E1846907/) |
| Dec 10, 2019 | Alteration or repair | Insulation, weatherization, air sealing, and dense packed cellulose | $4,900 | [SF1027359](https://nearbypermits.com/boston/permit/SF1027359/) |
| Sep 18, 2015 | Plumbing | Retest | $1,500 | [G519897](https://nearbypermits.com/boston/permit/G519897/) |

## Within ¼ mi since May 1, 2026

40 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 19 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 13, 2026 | [132 Dale St](https://nearbypermits.com/boston/address/132-dale-st/) | 840 ft NW | Plumbing | Master bath: Convert bathtub to shower. Replace vanity, toilet, and valve. First floor bath: Convert bathtub to shower. Replace vanity, toilet, and valve. | $16,000 | [PL1909319](https://nearbypermits.com/boston/permit/PL1909319/) |
| Oct 13, 2026 | [128 Dale St](https://nearbypermits.com/boston/address/128-dale-st/) | 910 ft NW | Electrical | Mayor's office event requiring generator | $500 | [ETS1909306](https://nearbypermits.com/boston/permit/ETS1909306/) |
| Oct 6, 2026 | [240 Huntington Av](https://nearbypermits.com/boston/address/240-huntington-av/) | 520 ft E | Alteration or repair | Confirm occupancy of existing single family dwelling.; | Not listed | [ALT1897047](https://nearbypermits.com/boston/permit/ALT1897047/) |
| Oct 5, 2026 | [132 Dale St](https://nearbypermits.com/boston/address/132-dale-st/) | 840 ft NW | Solar | Installation of 26 roof mounted solar panels, No battery | $37,416 | [SF1901368](https://nearbypermits.com/boston/permit/SF1901368/) |
| Oct 5, 2026 | [132 Dale St](https://nearbypermits.com/boston/address/132-dale-st/) | 840 ft NW | Solar | Installation of 26 roof mounted solar panels, No battery | $37,416 | [E1901370](https://nearbypermits.com/boston/permit/E1901370/) |
| Sep 2, 2026 | [257 Huntington Av](https://nearbypermits.com/boston/address/257-huntington-av/) | 560 ft SE | Alteration or repair | Weatherization, Insulation, Air Sealing for 257 Huntington Ave #1 | $3,878 | [SF1895229](https://nearbypermits.com/boston/permit/SF1895229/) |
| Sep 1, 2026 | [60 Bradlee St](https://nearbypermits.com/boston/address/60-bradlee-st/) | 820 ft E | Electrical | Full 100 AMP service replacement needed at site - Main service panel to be relocated to a code compliant location | $3,000 | [E1895638](https://nearbypermits.com/boston/permit/E1895638/) |
| Aug 19, 2026 | [5 Crane St](https://nearbypermits.com/boston/address/5-crane-st/) | 800 ft E | Alteration or repair | Conversion of existing basement of my owner-occupied home into a small ADU for my 72-year-old retired mother. The proposed ADU will be fully contained within the existing footprint of the home. No expansion of the building is planned and there will be no visible changes to exterior of property. | $60,000 | [ALT1837192](https://nearbypermits.com/boston/permit/ALT1837192/) |
| Jul 20, 2026 | [8 Crane St](https://nearbypermits.com/boston/address/8-crane-st/) | 830 ft E | Alteration or repair | Demo drywall in second floor bathtub and replace with new shower. Inspection for fire stopping and/or insulation. | $18,500 | [SF1871883](https://nearbypermits.com/boston/permit/SF1871883/) |
| Jul 14, 2026 | [8 Crane St](https://nearbypermits.com/boston/address/8-crane-st/) | 830 ft E | Plumbing | Convert tub to shower and replace valve on 2nd floor bathroom. | $4,000 | [PL1871858](https://nearbypermits.com/boston/permit/PL1871858/) |
| Jul 8, 2026 | [128 Dale St](https://nearbypermits.com/boston/address/128-dale-st/) | 910 ft NW | Electrical | Parks department event requiring generator | $500 | [ETS1870195](https://nearbypermits.com/boston/permit/ETS1870195/) |
| Jun 23, 2026 | [5 Bradlee Ln](https://nearbypermits.com/boston/address/5-bradlee-ln/) | 1,000 ft E | Roofing | Pending Occupancy Committee -;ALT1847980.Strip and re-roof 14sq Shingle 1sq TPO | $7,093 | [SF1855580](https://nearbypermits.com/boston/permit/SF1855580/) |
| Jun 12, 2026 | [540 Metropolitan Av](https://nearbypermits.com/boston/address/540-metropolitan-av/) | 850 ft SE | Alteration or repair | Interior: Install Intellijack support system to stabilize floor joist or beams as shown Install caulk in the crack. Exterior: Install Foundation Push Pier(s) | $86,000 | [ALT1824023](https://nearbypermits.com/boston/permit/ALT1824023/) |
| Jun 5, 2026 | [60 Bradlee St](https://nearbypermits.com/boston/address/60-bradlee-st/) | 820 ft E | Solar | Installation of roof mounted photovoltaic solar systems, 4.92 kw 12 panels with installation of 1 franklin battery installed on exterior of home | $46,800 | [SF1844863](https://nearbypermits.com/boston/permit/SF1844863/) |
| May 14, 2026 | [60 Bradlee St](https://nearbypermits.com/boston/address/60-bradlee-st/) | 820 ft E | Solar | Installation of roof mounted photovoltaic solar systems, 4.92 kw 12 panels with installation of 1 franklin battery installed on exterior of home | $46,800 | [E1844866](https://nearbypermits.com/boston/permit/E1844866/) |
| May 26, 2026 | [899 Hyde Park Av](https://nearbypermits.com/boston/address/899-hyde-park-av/) | 480 ft SW | Plumbing | Repair water main/ meter cracked and froze | $2,000 | [PL1845016](https://nearbypermits.com/boston/permit/PL1845016/) |
| May 8, 2026 | [899 Hyde Park Av](https://nearbypermits.com/boston/address/899-hyde-park-av/) | 480 ft SW | Alteration or repair | Reinforce and covering loading dock-deck | $3,500 | [SF1844871](https://nearbypermits.com/boston/permit/SF1844871/) |
| May 7, 2026 | [804 Hyde Park Av](https://nearbypermits.com/boston/address/804-hyde-park-av/) | 850 ft N | Plumbing | Installation of plumbing for a new multi-residential building consisting of 34 living units and 1 level of parking. | $900,000 | [PL1843029](https://nearbypermits.com/boston/permit/PL1843029/) |
| May 5, 2026 | [96 Bradlee St](https://nearbypermits.com/boston/address/96-bradlee-st/) | 540 ft NE | Solar | Installation of roof mounted photovoltaic solar systems, 5.4 kw 12 panels NO BATTERY STORAGE | $30,900 | [SF1841814](https://nearbypermits.com/boston/permit/SF1841814/) |

### Farther (1,000 ft to ¼ mi), 21 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 8, 2026 | [790 Hyde Park Av](https://nearbypermits.com/boston/address/790-hyde-park-av/) | 0.20 mi N | Alteration or repair | Install 3 windows for replacement. Work to be done in apt 39. No structural changes. | $15,710 | [SF1907757](https://nearbypermits.com/boston/permit/SF1907757/) |
| Oct 7, 2026 | [12 Bradlee Pk](https://nearbypermits.com/boston/address/12-bradlee-pk/) | 0.22 mi E | Alteration or repair | Install 20 replacement windows - no structural work | $42,763 | [SF1904098](https://nearbypermits.com/boston/permit/SF1904098/) |
| Aug 31, 2026 | [34 Bradlee St](https://nearbypermits.com/boston/address/34-bradlee-st/) | 0.24 mi SE | Electrical | Install #10 AWG circuit with 35A 2-pole GFCI breaker to 60-amp AC disconnect with surge arrestersizing per manufacturer name plate. Install a 20-amp circuit with 20A AFCI/GFCI breaker for a service receptacle with in-use weatherproof cover. for a 3 ton heat pump | $3,000 | [E1895720](https://nearbypermits.com/boston/permit/E1895720/) |
| Aug 28, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.25 mi SE | Solar | Installation of roof mounted photovoltaic solar systems, 8.61 kw 21 panels with installation of 1 franklin battery installed on exterior of home | $77,400 | [SF1885555](https://nearbypermits.com/boston/permit/SF1885555/) |
| Aug 26, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.25 mi SE | Solar | Installation of roof mounted photovoltaic solar systems, 8.61 kw 21 panels with installation of 1 franklin battery installed on exterior of home | $77,400 | [E1885559](https://nearbypermits.com/boston/permit/E1885559/) |
| Aug 24, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.22 mi SE | Plumbing | replace valve and drain | $1,500 | [PL1872512](https://nearbypermits.com/boston/permit/PL1872512/) |
| Jul 14, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.22 mi SE | Plumbing | replace valve and drain | $1,500 | [PL1871876](https://nearbypermits.com/boston/permit/PL1871876/) |
| Aug 24, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.25 mi SE | Electrical | New SPAN panel to be installed at site | $6,000 | [E1886077](https://nearbypermits.com/boston/permit/E1886077/) |
| Aug 19, 2026 | [50 Bradlee St](https://nearbypermits.com/boston/address/50-bradlee-st/) | 0.19 mi SE | New building | Subdivide lot for New Construction of a Two Family house, basement &; attic to remain unfinished, located at 50 Bradlee w/ 4 parking spaces(2-full &; 2- compact) and easement to 52 Bradlee (existing single to remain) w/ 2 parking spaces (1-full &; 1 compact).;e[Plan] filed.; | $600,000 | [ERT1598330](https://nearbypermits.com/boston/permit/ERT1598330/) |
| Aug 18, 2026 | [39 Bradlee St](https://nearbypermits.com/boston/address/39-bradlee-st/) | 0.25 mi SE | Electrical | Low voltage alarm install | $1,200 | [ELV1887048](https://nearbypermits.com/boston/permit/ELV1887048/) |
| Aug 5, 2026 | [308 Huntington Av](https://nearbypermits.com/boston/address/308-huntington-av/) | 0.24 mi SE | Plumbing | Plumb bathroom and kitchenette in EDU | $7,000 | [PL1882025](https://nearbypermits.com/boston/permit/PL1882025/) |
| Aug 5, 2026 | [308 Huntington Av](https://nearbypermits.com/boston/address/308-huntington-av/) | 0.24 mi SE | Electrical | upgrade service 200 amps, adding one additional meter and panel, wiring the kitchen and bathroom, run wires for baseboard heaters, and installation of some light fixtures. | Not listed | [E1882818](https://nearbypermits.com/boston/permit/E1882818/) |
| Jul 15, 2026 | [961 Hyde Park Av](https://nearbypermits.com/boston/address/961-hyde-park-av/) | 0.23 mi S | Electrical | 1) Removal of all knob and tuning wires. 2) Installation of new wiring for a complete electrical upgrades to unit #1. 3) Installation of new electrical sub-panel for unit #1. | $15,800 | [E1872948](https://nearbypermits.com/boston/permit/E1872948/) |
| Jul 10, 2026 | [790 Hyde Park Av](https://nearbypermits.com/boston/address/790-hyde-park-av/) | 0.20 mi N | Plumbing | replacement of a range | $200 | [G1871107](https://nearbypermits.com/boston/permit/G1871107/) |
| Jul 7, 2026 | [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/) | 0.24 mi S | Plumbing | Complete Plumbing for the remodel at the above address. | $12,000 | [PL1869104](https://nearbypermits.com/boston/permit/PL1869104/) |
| Jun 25, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.22 mi SE | Other | Pending Occupancy Committee -;ALT1847980.TUB TO SHOWER; | $19,431 | [SF1847141](https://nearbypermits.com/boston/permit/SF1847141/) |
| Jun 10, 2026 | [5 Bradlee Pk](https://nearbypermits.com/boston/address/5-bradlee-pk/) | 0.22 mi SE | Alteration or repair | Confirm occupancy as a 1 family dwellingNO RECORD OF OCCUPANCYHOMEOWNER:: | Not listed | [ALT1847980](https://nearbypermits.com/boston/permit/ALT1847980/) |
| Jun 2, 2026 | [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/) | 0.24 mi S | Alteration or repair | • Remove and dispose of wall to create an open space between the kitchen and dining room • Install LVL base (according the diagram included) • Replace kitchen cabinets and countertop | $16,000 | [SF1856450](https://nearbypermits.com/boston/permit/SF1856450/) |
| May 14, 2026 | [308 Huntington Av](https://nearbypermits.com/boston/address/308-huntington-av/) | 0.24 mi SE | Alteration or repair | Add Additional dwelling unit (ADU) in the basement. Add egress windows in the basement.;Home Owner Waiver | $25,000 | [ALT1773520](https://nearbypermits.com/boston/permit/ALT1773520/) |
| May 4, 2026 | [34 Bradlee St](https://nearbypermits.com/boston/address/34-bradlee-st/) | 0.24 mi SE | Roofing | Replace roof shingles | $18,600 | [SF1845405](https://nearbypermits.com/boston/permit/SF1845405/) |
| May 1, 2026 | [34 Thatcher St](https://nearbypermits.com/boston/address/34-thatcher-st/) | 0.24 mi S | Alteration or repair | No record of occupancy for existing 1 family.; | Not listed | [ALT1841216](https://nearbypermits.com/boston/permit/ALT1841216/) |

## Zoning requests nearby

Hearings are public: you can comment or attend. Dates can move; check the city's page before you go.

| Status | Hearing | Address | Distance | Request | Case | City's words | Filed |
|---|---|---|---|---|---|---|---|
| Approved | Mar 10, 2026 | 203 Clare Av | 390 ft NE | To erect a 3 story 4 multi family residence on clare avenue, hyde park, boston the new architectural project… | [BOA1804462](https://www.boston.gov/appeal-tracker) | "Appeal Closed", decision "AppProv" | 2025-12-07 |

Boston's decision codes, from its data dictionary (https://data.boston.gov/dataset/37d2e087-ce02-4090-bfdf-22de1ada3b23/resource/e11dcfa5-6f6f-4999-abc3-741f53c6731f/download/zba-data-dictionary.pdf): AppProv, "approved with conditions".

## More on this street

Other addresses on Metropolitan Av with permits, nearest house number first:

- [491 Metropolitan Av](https://nearbypermits.com/boston/address/491-metropolitan-av/): newest permit Sep 12, 2025
- [445 Metropolitan Av](https://nearbypermits.com/boston/address/445-metropolitan-av/): newest permit Jul 3, 2025
- [499 Metropolitan Av](https://nearbypermits.com/boston/address/499-metropolitan-av/): newest permit Nov 25, 2024
- [514 Metropolitan Av](https://nearbypermits.com/boston/address/514-metropolitan-av/): newest permit Jul 8, 2025
- [528 Metropolitan Av](https://nearbypermits.com/boston/address/528-metropolitan-av/): newest permit Feb 12, 2026
- [540 Metropolitan Av](https://nearbypermits.com/boston/address/540-metropolitan-av/): newest permit Jun 12, 2026
- [390 Metropolitan Av](https://nearbypermits.com/boston/address/390-metropolitan-av/): newest permit Feb 9, 2026
- [583 Metropolitan Av](https://nearbypermits.com/boston/address/583-metropolitan-av/): newest permit Aug 26, 2025
- [589 Metropolitan Av](https://nearbypermits.com/boston/address/589-metropolitan-av/): newest permit Oct 23, 2025
- [352 Metropolitan Av](https://nearbypermits.com/boston/address/352-metropolitan-av/): newest permit Dec 5, 2024

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-16 10:59 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Zoning requests come from the Boston Zoning Board of Appeal tracker (https://data.boston.gov/dataset/zoning-board-of-appeal-tracker). We read it Oct 16, 07:47 UTC.

Map, all 4 permits at this address and 40 nearby: https://nearbypermits.com/boston/address/472-metropolitan-av/
