# Building permits at 66 Tuttle St, Boston, MA

The biggest project within a quarter mile since May 1: a $750,000 alteration or repair at 19 Midland St, permitted Jun 16.

Five permits on record here. The newest, Sep 2: Wiring a full kitchen w/ dishwasher. Within a quarter mile, the city has issued 83 more permits (81 projects) since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 2, 2026 | Electrical | Wiring a full kitchen w/ dishwasher, disposal, fridge, microwave, gas stove and 4 recessed lights | $7,000 | [E1895986](https://nearbypermits.com/boston/permit/E1895986/) |
| Aug 25, 2026 | Electrical | Service upgrade 200amp | $5,000 | [E1880544](https://nearbypermits.com/boston/permit/E1880544/) |
| Aug 19, 2026 | Plumbing | Re-piped kitchen, sink, drainage and water and second floor bathroom drainage | $3,000 | [PL1889901](https://nearbypermits.com/boston/permit/PL1889901/) |
| Jul 31, 2026 | Alteration or repair | Pending;ALT1872522 -Occupancy Committee review.We will remove all the existing kitchen cabinets and reinstall new ones.New countertops, appliances and refinish the existing flooring. | $103,679 | [SF1861893](https://nearbypermits.com/boston/permit/SF1861893/) |
| Jul 28, 2026 | Alteration or repair | Confirming occupancy of existing single family.; | Not listed | [ALT1872522](https://nearbypermits.com/boston/permit/ALT1872522/) |

## Within ¼ mi since May 1, 2026

83 permits in the circle. From our copy of the city's data (last 24 months).

### Next door (under 250 ft), 3 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jun 1, 2026 | [70 Tuttle St](https://nearbypermits.com/boston/address/70-tuttle-st/) | 50 ft N | Electrical | Full Electrical Service Upgrade from 100A to 200A | $3,800 | [E1852171](https://nearbypermits.com/boston/permit/E1852171/) |
| May 29, 2026 | [70 Tuttle St](https://nearbypermits.com/boston/address/70-tuttle-st/) | 50 ft N | Solar | Rooftop solar 9 panels 3.69 kwdc no ESS no structural | $4,102 | [SF1851017](https://nearbypermits.com/boston/permit/SF1851017/) |
| May 29, 2026 | [70 Tuttle St](https://nearbypermits.com/boston/address/70-tuttle-st/) | 50 ft N | Solar | Rooftop solar 9 panels 3.69 kwdc no ESS | $13,733 | [E1851018](https://nearbypermits.com/boston/permit/E1851018/) |

### This block (250 to 1,000 ft), 36 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 29, 2026 | [40 Saxton St](https://nearbypermits.com/boston/address/40-saxton-st/) | 290 ft SW | Electrical | Upgrade the service From 100 Amp to 200 Amp, add the public meter for common area. | $5,000 | [E1904710](https://nearbypermits.com/boston/permit/E1904710/) |
| Sep 21, 2026 | [65 Sagamore St](https://nearbypermits.com/boston/address/65-sagamore-st/) | 670 ft N | Plumbing | Replace kitchen sink, garbage disposal, and dishwasher; | $1,000 | [PL1902710](https://nearbypermits.com/boston/permit/PL1902710/) |
| Sep 15, 2026 | [1048 Dorchester Av](https://nearbypermits.com/boston/address/1048-dorchester-av/) | 750 ft NW | Roofing | tire off the shingles and replace for new asphalt shingles | $115,000 | [SF1884284](https://nearbypermits.com/boston/permit/SF1884284/) |
| Sep 9, 2026 | [24 Saxton St](https://nearbypermits.com/boston/address/24-saxton-st/) | 490 ft SW | Plumbing | Install 3 full bathrooms, 1 Kitchen sink, 1 garbage disposal, 1 Diswasher, 1 Washing machine connection, 1 Electric water heater, 2 silcocks | $19,200 | [PL1897558](https://nearbypermits.com/boston/permit/PL1897558/) |
| Sep 9, 2026 | [24 Saxton St](https://nearbypermits.com/boston/address/24-saxton-st/) | 490 ft SW | Plumbing | Repairing the gas line and testing the existing furnace and 1 stove | $2,000 | [G1897559](https://nearbypermits.com/boston/permit/G1897559/) |
| Sep 9, 2026 | [49-51 Sudan St](https://nearbypermits.com/boston/address/49--51-sudan-st/) | 740 ft N | Electrical | Inspect the electrical service to make sure everything is in good condition and ready for Eversource to install an additional meter for the common area. | $300 | [E1895947](https://nearbypermits.com/boston/permit/E1895947/) |
| Sep 8, 2026 | [81 Romsey St](https://nearbypermits.com/boston/address/81-romsey-st/) | 520 ft NE | Plumbing | replace existing tub/shower valve and drain with new shower valve and drain | $1,895 | [PL1899227](https://nearbypermits.com/boston/permit/PL1899227/) |
| Sep 8, 2026 | [3 Maryland St](https://nearbypermits.com/boston/address/3-maryland-st/) | 910 ft SW | Electrical | Wiring for 3 family and add public meter | $38,000 | [E1899248](https://nearbypermits.com/boston/permit/E1899248/) |
| Sep 7, 2026 | [1078-1082 Dorchester Av](https://nearbypermits.com/boston/address/1078--1082-dorchester-av/) | 910 ft W | Fire systems | Install smoke and carbon monoxide detectors where required by law. | $1,200 | [EFA1644981](https://nearbypermits.com/boston/permit/EFA1644981/) |
| Sep 1, 2026 | [9 Elton St](https://nearbypermits.com/boston/address/9-elton-st/) | 830 ft W | Plumbing | Add 3rd floor bathroom | $3,500 | [PL1894985](https://nearbypermits.com/boston/permit/PL1894985/) |
| Aug 31, 2026 | [44-46 Sagamore St](https://nearbypermits.com/boston/address/44--46-sagamore-st/) | 410 ft NW | Electrical | Adding basement ADU Moving electrical panels to new mechanical room and wiring new unit | $10,000 | [E1894500](https://nearbypermits.com/boston/permit/E1894500/) |
| Aug 31, 2026 | [35 Sudan St](https://nearbypermits.com/boston/address/35-sudan-st/) | 910 ft NW | Alteration or repair | To change occupancy from three-family to four-family by converting basement level into a residential unit | $219,000 | [ALT1628851](https://nearbypermits.com/boston/permit/ALT1628851/) |
| Aug 28, 2026 | [58 Sydney St](https://nearbypermits.com/boston/address/58-sydney-st/) | 270 ft SE | Alteration or repair | Adding bathroom to the attic; | $5,000 | [SF1895679](https://nearbypermits.com/boston/permit/SF1895679/) |
| Aug 28, 2026 | [77 Savin Hill Av](https://nearbypermits.com/boston/address/77-savin-hill-av/) | 850 ft SW | Fence, wall or deck | Demo front deck/porch. Violation V925664 | $5,000 | [SF1895527](https://nearbypermits.com/boston/permit/SF1895527/) |
| Aug 11, 2026 | [24 Saxton St](https://nearbypermits.com/boston/address/24-saxton-st/) | 490 ft SW | Alteration or repair | new drywall + trim, int &; ext doors, sand floor, replace kit. cabinets, counters, and bath fixtures. Elec. and plumbing fixtures will be updated in existing locations. Add recessed lighting in 2nd FL BRs. No changes to framing, structure, or exterior envelope. Replace deck, entry and rear stair rai | $65,000 | [SF1882596](https://nearbypermits.com/boston/permit/SF1882596/) |
| Aug 10, 2026 | [24 Saxton St](https://nearbypermits.com/boston/address/24-saxton-st/) | 490 ft SW | Electrical | The house need to be inspected for power reconnection | $200 | [E1883680](https://nearbypermits.com/boston/permit/E1883680/) |
| Aug 7, 2026 | [36 Tuttle St](https://nearbypermits.com/boston/address/36-tuttle-st/) | 390 ft S | Alteration or repair | Furnish and install twenty-three (23) harvey building products white interior / black exterior laminate exterior classic vinyl replacement windows w/ low-e/argon, half screens. | $17,800 | [SF1880179](https://nearbypermits.com/boston/permit/SF1880179/) |
| Aug 7, 2026 | [11 Hallam St](https://nearbypermits.com/boston/address/11-hallam-st/) | 700 ft W | Solar | Installing rooftop solar PV of 3.69 KW and 9 modules. No ESS installation | $10,198 | [SF1835567](https://nearbypermits.com/boston/permit/SF1835567/) |
| Aug 7, 2026 | [11 Hallam St](https://nearbypermits.com/boston/address/11-hallam-st/) | 700 ft W | Electrical | Installing rooftop railed solar PV 3.69KW and 9 modules. | $23,796 | [E1834581](https://nearbypermits.com/boston/permit/E1834581/) |
| Aug 4, 2026 | [78-80 Sudan St](https://nearbypermits.com/boston/address/78--80-sudan-st/) | 840 ft N | Plumbing | gas pipe test because new meter install by gas company. | $1,800 | [G1881628](https://nearbypermits.com/boston/permit/G1881628/) |
| Jul 29, 2026 | [58 Sydney St](https://nearbypermits.com/boston/address/58-sydney-st/) | 270 ft SE | Plumbing | Bathroom remodel consisting of one lavatory, one water closet, one standing shower in each bathroom (first and second floor), Addition of washer and electric dryer (first and second floor), Kitchen remodel (first floor) | $8,000 | [PL1879467](https://nearbypermits.com/boston/permit/PL1879467/) |
| Jul 27, 2026 | [77 Harbor View St](https://nearbypermits.com/boston/address/77-harbor-view-st/) | 960 ft N | Electrical | Rewire house and new service | $30,000 | [E1878149](https://nearbypermits.com/boston/permit/E1878149/) |
| Jul 21, 2026 | [77 Harbor View St](https://nearbypermits.com/boston/address/77-harbor-view-st/) | 960 ft N | Alteration or repair | Complete bathrooms remodeling on all 3 floors including electrical and plumbing work. Preparation and paint entire apartments. Install new floating flooring and trim on all 3 floors. Construct/improvement of basement storage area only and half bathroom. | $150,000 | [ALT1874151](https://nearbypermits.com/boston/permit/ALT1874151/) |
| Jul 15, 2026 | [61 Savin Hill Av](https://nearbypermits.com/boston/address/61-savin-hill-av/) | 830 ft SW | Solar | Installation of a safe and code-compliant grid-tied solar system on an existing residential roof. 17 Panels, 7.31 kW DC. | $6,000 | [SF1857959](https://nearbypermits.com/boston/permit/SF1857959/) |
| Jun 5, 2026 | [61 Savin Hill Av](https://nearbypermits.com/boston/address/61-savin-hill-av/) | 830 ft SW | Solar | Installation of a safe and code-compliant grid-tied solar system on an existing residential roof. 17 Panels, 7.31 kW DC. | $20,000 | [E1857967](https://nearbypermits.com/boston/permit/E1857967/) |
| Jul 14, 2026 | [371 Savin Hill Av](https://nearbypermits.com/boston/address/371-savin-hill-av/) | 810 ft SE | Alteration or repair | Full replacement of deck flooring, railing, and reinforce framing where required for a 3 level deck | $35,000 | [SF1863112](https://nearbypermits.com/boston/permit/SF1863112/) |
| Jul 2, 2026 | [367 Savin Hill Av](https://nearbypermits.com/boston/address/367-savin-hill-av/) | 880 ft SE | Plumbing | Bathroom renovation | $1,000 | [PL1867043](https://nearbypermits.com/boston/permit/PL1867043/) |
| Jun 28, 2026 | [1043-1045 Dorchester Av](https://nearbypermits.com/boston/address/1043--1045-dorchester-av/) | 980 ft W | Alteration or repair | Paint entire back porch, install new PVC lattice front and back porch, remove existing PT railings and install new PCV one, install 3 exterior doors and 3 storm doors, renovate 2 floor bathroom | $42,950 | [SF1861068](https://nearbypermits.com/boston/permit/SF1861068/) |
| Jun 26, 2026 | [2 Saxton St](https://nearbypermits.com/boston/address/2-saxton-st/) | 740 ft SW | Alteration or repair | Removing a current HVAC System and replacing it with a new MIDEA 48000 BTU condenser and air handler in the attic. (Work Being done at 82 Savin Hill Ave, Dorchester, MA 02125 / secondary address). | $4,500 | [E1864297](https://nearbypermits.com/boston/permit/E1864297/) |
| Jun 24, 2026 | [14 Hallam St](https://nearbypermits.com/boston/address/14-hallam-st/) | 650 ft W | Electrical | 100 amp replacing the disconnect and meter bank. | $8,000 | [E1864031](https://nearbypermits.com/boston/permit/E1864031/) |
| Jun 16, 2026 | [6-8 Belfort St](https://nearbypermits.com/boston/address/6--8-belfort-st/) | 820 ft NW | Electrical | Replace 3rd floor electrical panel and troubleshooting outlets not working in the bedroom | $2,600 | [E1861904](https://nearbypermits.com/boston/permit/E1861904/) |
| Jun 6, 2026 | [58 Sydney St](https://nearbypermits.com/boston/address/58-sydney-st/) | 270 ft SE | Alteration or repair | Renovate the kitchen on the first floor and the bathrooms on the first and second floor. | $25,000 | [SF1850513](https://nearbypermits.com/boston/permit/SF1850513/) |
| May 18, 2026 | [367 Savin Hill Av](https://nearbypermits.com/boston/address/367-savin-hill-av/) | 880 ft SE | Alteration or repair | Bathroom renovation. New shower, vanity, tile, finishes | $35,975 | [SF1843686](https://nearbypermits.com/boston/permit/SF1843686/) |
| May 15, 2026 | [77 Savin Hill Av](https://nearbypermits.com/boston/address/77-savin-hill-av/) | 850 ft SW | Plumbing | Supply and install navien combi unit for the 3rd floor apartmennt | $7,000 | [G1849065](https://nearbypermits.com/boston/permit/G1849065/) |
| May 11, 2026 | [73 Romsey St](https://nearbypermits.com/boston/address/73-romsey-st/) | 500 ft N | Electrical | Electrical wiring for a 3-family house: 4 cat6 wire and r6 wire for each apartment. | $1,000 | [ELV1847462](https://nearbypermits.com/boston/permit/ELV1847462/) |
| May 5, 2026 | [73 Romsey St](https://nearbypermits.com/boston/address/73-romsey-st/) | 500 ft N | Fire systems | Formal amendment designating Jason Kahan as the Engineer of Record for the Tier I drawings so that both Tier I and Tier II are aligned under the same professional. See alt1747461 | Not listed | [A1844993](https://nearbypermits.com/boston/permit/A1844993/) |

### Farther (1,000 ft to ¼ mi), 44 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 1, 2026 | [25 Harbor View St](https://nearbypermits.com/boston/address/25-harbor-view-st/) | 0.23 mi NW | Alteration or repair | Remove and replace rear porches to be same size and shape | $20,000 | [SF1905886](https://nearbypermits.com/boston/permit/SF1905886/) |
| Oct 1, 2026 | [19 Midland St](https://nearbypermits.com/boston/address/19-midland-st/) | 0.21 mi S | Alteration or repair | Amendment to ALT1690151 - Remove the remaining section of the existing deteriorated foundation. Rebuild the removed section of foundation in accordance with the new drawings (see engineer rpt and attached drawings) | $15,000 | [A1905353](https://nearbypermits.com/boston/permit/A1905353/) |
| Sep 30, 2026 | [7 Thornley St](https://nearbypermits.com/boston/address/7-thornley-st/) | 0.21 mi W | Alteration or repair | Amendment to ALT1782865 to show additional bathroom on each floor of the renovated property. Construction cost reflected on original ALT permit. Add roof deck.; | $18,000 | [A1896630](https://nearbypermits.com/boston/permit/A1896630/) |
| Sep 29, 2026 | [26-28 Grampian Wy](https://nearbypermits.com/boston/address/26--28-grampian-wy/) | 0.22 mi SE | Plumbing | New bath Kitchenette | $3,100 | [PL1905449](https://nearbypermits.com/boston/permit/PL1905449/) |
| Sep 25, 2026 | [4 Victoria St](https://nearbypermits.com/boston/address/4-victoria-st/) | 0.21 mi NW | Alteration or repair | Installation of new siding and windows | $60,000 | [SF1903892](https://nearbypermits.com/boston/permit/SF1903892/) |
| Sep 25, 2026 | [26-28 Grampian Wy](https://nearbypermits.com/boston/address/26--28-grampian-wy/) | 0.22 mi SE | Electrical | Provide electrical wiring, lighting, switches, GFCIs, and dedicated circuits for basement renovation and powder room per Massachusetts electrical code. | $5,000 | [E1903965](https://nearbypermits.com/boston/permit/E1903965/) |
| Sep 15, 2026 | [25 Harbor View St](https://nearbypermits.com/boston/address/25-harbor-view-st/) | 0.23 mi NW | Electrical | Rewire whole house | $25,000 | [E1900736](https://nearbypermits.com/boston/permit/E1900736/) |
| Sep 15, 2026 | [78 Harbor View St](https://nearbypermits.com/boston/address/78-harbor-view-st/) | 0.20 mi N | Electrical | Service Upgrade to 200A | $3,000 | [E1879444](https://nearbypermits.com/boston/permit/E1879444/) |
| Sep 11, 2026 | [42 Grampian Wy](https://nearbypermits.com/boston/address/42-grampian-wy/) | 0.23 mi SE | Fence, wall or deck | Front and back deck boards and railings | $22,000 | [SF1900481](https://nearbypermits.com/boston/permit/SF1900481/) |
| Sep 9, 2026 | [25 Harbor View St](https://nearbypermits.com/boston/address/25-harbor-view-st/) | 0.23 mi NW | Plumbing | new waste pipe to all new fixture toilet, sink, kitchen sink, shower. | $24,000 | [PL1897969](https://nearbypermits.com/boston/permit/PL1897969/) |
| Sep 9, 2026 | [25 Harbor View St](https://nearbypermits.com/boston/address/25-harbor-view-st/) | 0.23 mi NW | Plumbing | new gas line to stove, hot air furnace and tankless water heater. | $10,000 | [G1897965](https://nearbypermits.com/boston/permit/G1897965/) |
| Sep 8, 2026 | [21 Maryland St](https://nearbypermits.com/boston/address/21-maryland-st/) | 0.22 mi SW | Electrical | Building service upgrade from 200 to 400 amps. No change in # of meters. Unit #1 - connections to 1 con, 1 air handler, 1 DHW, 1 ERV. Unit #2 - connections to 1 con, 1 air handler, 1 DHW, 1 ERV. Unit #3 -connections to 1 con, 1 air handler, 1 DHW, 1 ERV. | $52,000 | [E1897470](https://nearbypermits.com/boston/permit/E1897470/) |
| Sep 3, 2026 | [21 Maryland St](https://nearbypermits.com/boston/address/21-maryland-st/) | 0.22 mi SW | Plumbing | Drain and remove existing heating boilers (3) Drain remove and replace DHW tanks (3) Install temp. basement sink (1) Install water sub-meters (3) Drain, remove and replace all existing plumbing infrastructure including capping + removing gas lines. | $68,000 | [PL1897308](https://nearbypermits.com/boston/permit/PL1897308/) |
| Sep 2, 2026 | [75 Auckland St](https://nearbypermits.com/boston/address/75-auckland-st/) | 0.20 mi SW | Electrical | Remodeling of Bedroom with walk in closet and Bathroom | $7,000 | [E1895981](https://nearbypermits.com/boston/permit/E1895981/) |
| Aug 31, 2026 | [25 Harbor View St](https://nearbypermits.com/boston/address/25-harbor-view-st/) | 0.23 mi NW | Alteration or repair | Renovate kitchen and bathroom on all 3 floors, install insulation as needed. Flooring, painting, electrical and plumbing work. | $97,500 | [SF1896053](https://nearbypermits.com/boston/permit/SF1896053/) |
| Aug 31, 2026 | [358 Savin Hill Av](https://nearbypermits.com/boston/address/358-savin-hill-av/) | 0.20 mi SE | Alteration or repair | Mass Save Insulation | $16,000 | [SF1889545](https://nearbypermits.com/boston/permit/SF1889545/) |
| Aug 31, 2026 | [1-3 Davitt St](https://nearbypermits.com/boston/address/1--3-davitt-st/) | 0.23 mi E | Plumbing | install gas lines for gas fireplace | $2,000 | [G1883797](https://nearbypermits.com/boston/permit/G1883797/) |
| Aug 27, 2026 | [75 Auckland St](https://nearbypermits.com/boston/address/75-auckland-st/) | 0.20 mi SW | Plumbing | I will install rough and finish plumbing for full bathroom on second floor | $6,000 | [PL1895024](https://nearbypermits.com/boston/permit/PL1895024/) |
| Aug 24, 2026 | [1097-1099 Dorchester Av](https://nearbypermits.com/boston/address/1097--1099-dorchester-av/) | 0.21 mi W | Alteration or repair | Remove and replace all rotted exterior trim work | $50,000 | [SF1889235](https://nearbypermits.com/boston/permit/SF1889235/) |
| Aug 21, 2026 | [33 Spring Garden St](https://nearbypermits.com/boston/address/33-spring-garden-st/) | 0.22 mi N | Alteration or repair | repair to columns | $1,500 | [SF1890926](https://nearbypermits.com/boston/permit/SF1890926/) |
| Aug 21, 2026 | [33 Spring Garden St](https://nearbypermits.com/boston/address/33-spring-garden-st/) | 0.22 mi N | Alteration or repair | N/R confirm occupancy of 1 FamilyNO RECORD OF OCCUPANCY;DANIEL RAE: | Not listed | [ALT1891040](https://nearbypermits.com/boston/permit/ALT1891040/) |
| Aug 17, 2026 | [85 Auckland St](https://nearbypermits.com/boston/address/85-auckland-st/) | 0.22 mi SW | Alteration or repair | replace existing siding in rear and on left side | $20,000 | [SF1885972](https://nearbypermits.com/boston/permit/SF1885972/) |
| Aug 12, 2026 | [75 Auckland St](https://nearbypermits.com/boston/address/75-auckland-st/) | 0.20 mi SW | Alteration or repair | Non-structural interior reno of existing 2nd-floor area in single-family dwelling. Remove one non-loadbearing partition; reframe to create walk-in closet, bedroom, and bathroom. Framing, insulation, plaster, flooring, tile, paint. Plumbing/electrical under separate permits. No change to footprint. N | $105,500 | [SF1883110](https://nearbypermits.com/boston/permit/SF1883110/) |
| Aug 4, 2026 | [22-24 Grampian Wy](https://nearbypermits.com/boston/address/22--24-grampian-wy/) | 0.22 mi SE | Electrical | Rewire of kitchen, Electrical Stove, Kitchen Lights | $6,500 | [E1882001](https://nearbypermits.com/boston/permit/E1882001/) |
| Jul 31, 2026 | [22-24 Grampian Wy](https://nearbypermits.com/boston/address/22--24-grampian-wy/) | 0.22 mi SE | Plumbing | Gas Range | $1,500 | [G1878210](https://nearbypermits.com/boston/permit/G1878210/) |
| Jul 30, 2026 | [1105 Dorchester Av](https://nearbypermits.com/boston/address/1105-dorchester-av/) | 0.22 mi SW | Alteration or repair | Painting of interior and Exterior. Replace exist floor tiles and countertop. Pressure washing exterior and patch holes. All work Non-Structural. Yeanie's Burgers- (39 Savin Hill Ave.) | $25,000 | [SF1880248](https://nearbypermits.com/boston/permit/SF1880248/) |
| Jul 29, 2026 | [22-24 Grampian Wy](https://nearbypermits.com/boston/address/22--24-grampian-wy/) | 0.22 mi SE | Plumbing | Kitchen Remodel | $5,000 | [PL1878209](https://nearbypermits.com/boston/permit/PL1878209/) |
| Jul 28, 2026 | [22-24 Grampian Wy](https://nearbypermits.com/boston/address/22--24-grampian-wy/) | 0.22 mi SE | Alteration or repair | Kitchen renovation - Work will include removal of existing cabinets and counter top, and replacing with new. | $33,871 | [SF1879151](https://nearbypermits.com/boston/permit/SF1879151/) |
| Jul 27, 2026 | [19 Midland St](https://nearbypermits.com/boston/address/19-midland-st/) | 0.21 mi S | Electrical | Install 100amp overhead temporary service. | $2,000 | [E1873273](https://nearbypermits.com/boston/permit/E1873273/) |
| Jul 21, 2026 | [26-28 Grampian Wy](https://nearbypermits.com/boston/address/26--28-grampian-wy/) | 0.22 mi SE | Alteration or repair | Remove insulation, install waterproof barrier and new insulation in basement. Frame half bathroom in basement. Install cabinets and finish walls in basement. No structural work to be performed. Electrical and plumbing to be completed under separate permits. | $60,000 | [SF1873160](https://nearbypermits.com/boston/permit/SF1873160/) |
| Jul 21, 2026 | [358 Savin Hill Av](https://nearbypermits.com/boston/address/358-savin-hill-av/) | 0.20 mi SE | Alteration or repair | Installing replacement windows and vinyl siding. Using same rough opening for windows, installation of vinyl siding and some minor trim replacement | $18,500 | [SF1870095](https://nearbypermits.com/boston/permit/SF1870095/) |
| Jun 29, 2026 | [5 Romsey St](https://nearbypermits.com/boston/address/5-romsey-st/) | 0.20 mi NW | Alteration or repair | Supply and install Hardie wrap vapor barrier on the entire house and tape at the seams Supply and install Zip flashing tape around all openings Supply and install new standard PVC mounting blocks (light, meter, plug plate, hose bib, etc.) Supply and install Hardie soffit on whole house All trim work | $86,965 | [SF1845289](https://nearbypermits.com/boston/permit/SF1845289/) |
| Jun 25, 2026 | [8 Napier Pk](https://nearbypermits.com/boston/address/8-napier-pk/) | 0.21 mi SE | Plumbing | Replacement of gas water heater | $2,204 | [PL1862852](https://nearbypermits.com/boston/permit/PL1862852/) |
| Jun 25, 2026 | [8 Napier Pk](https://nearbypermits.com/boston/address/8-napier-pk/) | 0.21 mi SE | Plumbing | Replacement of gas water heater | $2,204 | [G1862849](https://nearbypermits.com/boston/permit/G1862849/) |
| Jun 16, 2026 | [19 Midland St](https://nearbypermits.com/boston/address/19-midland-st/) | 0.21 mi S | Alteration or repair | ;Confirm Occupancy of existing 1 Family home.; The owner seeks to erect a new third story and side addition as per the attached plans, and change occupancy from 1 to 3 residential units with 3 off street parking spaces. | $750,000 | [ALT1690151](https://nearbypermits.com/boston/permit/ALT1690151/) |
| May 20, 2026 | [7 Thornley St](https://nearbypermits.com/boston/address/7-thornley-st/) | 0.21 mi W | Fire systems | Install manual fire alarm system per 527 cmr 12.00 & NFPA 72. | $12,500 | [EFA1850251](https://nearbypermits.com/boston/permit/EFA1850251/) |
| May 19, 2026 | [36 Spring Garden St](https://nearbypermits.com/boston/address/36-spring-garden-st/) | 0.22 mi N | Fire systems | wiring and installation hardwire smoke and CO detectors | $1,500 | [EFA1850959](https://nearbypermits.com/boston/permit/EFA1850959/) |
| May 11, 2026 | [7 Thornley St](https://nearbypermits.com/boston/address/7-thornley-st/) | 0.21 mi W | Fire systems | Install hardwired smoke detector for 3 family house. | $4,500 | [EFA1847680](https://nearbypermits.com/boston/permit/EFA1847680/) |
| May 8, 2026 | [7 Thornley St](https://nearbypermits.com/boston/address/7-thornley-st/) | 0.21 mi W | Electrical | Upgrade the service to 200 Amp, add the public meter and wire three dwelling unit. | $50,000 | [E1846792](https://nearbypermits.com/boston/permit/E1846792/) |
| May 8, 2026 | [1121 Dorchester Av](https://nearbypermits.com/boston/address/1121-dorchester-av/) | 0.24 mi SW | Electrical | Kithen dishwasher: replacing the regular circuit breaker with a GFCI circuit breaker. | $300 | [E1844783](https://nearbypermits.com/boston/permit/E1844783/) |
| May 4, 2026 | [990-996 Dorchester Av](https://nearbypermits.com/boston/address/990--996-dorchester-av/) | 0.23 mi NW | Alteration or repair | Install a new counter top, plumbing to accommodate sink, electrical to accommodate light fixture and outlet and fire block if necessary. | $10,000 | [SF1841997](https://nearbypermits.com/boston/permit/SF1841997/) |
| May 4, 2026 | [7 Thornley St](https://nearbypermits.com/boston/address/7-thornley-st/) | 0.21 mi W | Plumbing | Bathroom Kitchens Laundry Water heaters | $15,000 | [PL1845045](https://nearbypermits.com/boston/permit/PL1845045/) |
| May 4, 2026 | [7 Thornley St](https://nearbypermits.com/boston/address/7-thornley-st/) | 0.21 mi W | Plumbing | Furnaces Water heaters Ranges | $6,000 | [G1845049](https://nearbypermits.com/boston/permit/G1845049/) |
| May 4, 2026 | [20 Grampian Wy](https://nearbypermits.com/boston/address/20-grampian-wy/) | 0.22 mi SE | Electrical | Remove old BX wiring in stair hall way. support all wiring in affected areas. add new wiring for stair lighting. add new wiirng and circuit for bath floor heat. install new dual function breakers affecting lighting circuits. | $5,000 | [E1840907](https://nearbypermits.com/boston/permit/E1840907/) |

## More on this street

Other addresses on Tuttle St with permits, nearest house number first:

- [70 Tuttle St](https://nearbypermits.com/boston/address/70-tuttle-st/): newest permit Jun 1, 2026
- [85 Tuttle St](https://nearbypermits.com/boston/address/85-tuttle-st/): newest permit Feb 16, 2026
- [86 Tuttle St](https://nearbypermits.com/boston/address/86-tuttle-st/): newest permit Sep 19, 2025
- [36 Tuttle St](https://nearbypermits.com/boston/address/36-tuttle-st/): newest permit Aug 7, 2026
- [35 Tuttle St](https://nearbypermits.com/boston/address/35-tuttle-st/): newest permit Feb 10, 2025
- [34 Tuttle St](https://nearbypermits.com/boston/address/34-tuttle-st/): newest permit Aug 27, 2025

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-08 12:59 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, all 5 permits at this address and 83 nearby: https://nearbypermits.com/boston/address/66-tuttle-st/
