# Elevator permit ALT1623536 at 2-4 Fidelis Wy, Boston

Boston Inspectional Services Department permit ALT1623536: issued May 1, 2025 for elevator work at 2-4 Fidelis Wy. The Project consists of construction of two new elevators and modernization of the existing two elevators at two buildings at the Commonwealth Development located in the Brighton area of Boston, Massachusetts, including all improvements as indicated on the drawings and specifications.*Clarification: Updated Plan submissions with 3/11/25 filing: The "Project" consists to change the USE AND OCCUPANCY of 2-4 Fidelis way and 6-8 Fidelis way each having 58 untis into one Elderly housing complex to now be known as the Commonwealth Elderly complex with 116 units (no increase in the actual number of units) as one structure connected on the first floor to include the modernization of the two existing elevators;per plans provided. New address to be known as 2-8 Fidelis way.; As of 3/11/25 this application has been filed in conjunction with ALT----------------(6-8 Fidelis way) R-2 use change to an R-4 TBD*9/12/24 filing assigned to FD by DEPT HEAD PW on 10.2.24.

- Permit number: ALT1623536
- Issued: May 1, 2025
- Type of work: Elevator (city: City of Boston, Long Form/Alteration Permit)
- Status: Issued (city: Open)
- Reported cost: $6,680,953
- ZIP code: 02135
- All permits at this address: https://nearbypermits.com/boston/address/2--4-fidelis-wy/

---
Source: Boston Inspectional Services Department permit data (https://data.boston.gov/dataset/approved-building-permits). Checked 2026-10-06 11:26 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Every permit at 2-4 Fidelis Wy: https://nearbypermits.com/boston/address/2--4-fidelis-wy/
