# Building permits at 2805 Kenyon Cir, Boulder, CO

Six permits on record here. The newest, Aug 11, 2025: Adding solar to existing system new system size: 3.44kwdc. Boulder publishes permits without map coordinates, so this address has no map and no quarter-mile list.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Aug 11, 2025 | Electrical | Adding solar to existing system new system size: 3.44kwdc, 2.79kwac · 8 q cell q.tron blk m-g2+ modules · 8 enphase iq8ac-72-m-us inverters | $12,360 | [ELE2025-00677](https://nearbypermits.com/boulder/permit/ELE2025-00677/) |
| Dec 15, 2023 | Mechanical (HVAC) | Install a Dual-Fuel Heat Pump/Furnace HVAC system with a subpanel addition | $18,483 | [MEC2023-01886](https://nearbypermits.com/boulder/permit/MEC2023-01886/) |
| May 18, 2023 | Electrical | VOID- 180 Days no activity Run 240V - 30 amp 10/2 in mech room. No disco provided as Water heater is within sight of panel providing power. | $400 | [ELE2023-00510](https://nearbypermits.com/boulder/permit/ELE2023-00510/) |
| May 2, 2023 | Mechanical (HVAC) | Replace gas water heater with heat pump water heater | $4,950 | [MEC2023-00608](https://nearbypermits.com/boulder/permit/MEC2023-00608/) |
| Aug 15, 2022 | Roofing | Total tear-off & reroof of SFD, 24 squares of dimensional shingles on a pitch represented as 4/12. All roof materials shall be installed per manufacturer?s specs. Mid-roof inspection required if pitch is less than 4/12. | $8,347 | [RFG2022-00750](https://nearbypermits.com/boulder/permit/RFG2022-00750/) |
| Jun 14, 2022 | Electrical | Installation of a flush mount, grid-tied 5.6 kW PV solar system. Will Also be installing an EV charging circuit | $13,053 | [ELE2022-00896](https://nearbypermits.com/boulder/permit/ELE2022-00896/) |

## More on this street

Other addresses on Kenyon Cir with permits, nearest house number first:

- [2809 Kenyon Cir](https://nearbypermits.com/boulder/address/2809-kenyon-cir/): newest permit May 18, 2026
- [2820 Kenyon Cir](https://nearbypermits.com/boulder/address/2820-kenyon-cir/): newest permit Nov 4, 2025
- [2824 Kenyon Cir](https://nearbypermits.com/boulder/address/2824-kenyon-cir/): newest permit May 22, 2025
- [2831 Kenyon Cir](https://nearbypermits.com/boulder/address/2831-kenyon-cir/): newest permit Jul 23, 2026
- [2851 Kenyon Cir](https://nearbypermits.com/boulder/address/2851-kenyon-cir/): newest permit Jan 28, 2025
- [2855 Kenyon Cir](https://nearbypermits.com/boulder/address/2855-kenyon-cir/): newest permit Feb 17, 2026
- [2865 Kenyon Cir](https://nearbypermits.com/boulder/address/2865-kenyon-cir/): newest permit May 20, 2025
- [2895 Kenyon Cir](https://nearbypermits.com/boulder/address/2895-kenyon-cir/): newest permit Apr 28, 2025

---
Source: Boulder Planning and Development Services permit data (https://www.arcgis.com/home/item.html?id=e3ff6248e4a547bcba31025d2c5c9fee). Checked 2026-10-07 21:49 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

All 6 permits at this address: https://nearbypermits.com/boulder/address/2805-kenyon-cir/
