# Building permits at 653 Dewey Ave, Boulder, CO

Three permits on record here. The newest, Jun 10: All Structures must be permitted separately Total tear-off & reroof of SFD. Boulder publishes permits without map coordinates, so this address has no map and no quarter-mile list.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Jun 10, 2026 | Roofing | All Structures must be permitted separately Total tear-off & reroof of SFD, 13 squares of dimensional shingles on a pitch represented as 4/12. All roof materials shall be installed per manufacturer?s specs. Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other t | $28,851 | [RFG2026-00568](https://nearbypermits.com/boulder/permit/RFG2026-00568/) |
| May 28, 2026 | Mechanical (HVAC) | Replacement Furnace for single family detached dwelling - no electrical Any electrical work required beyond a like-for-like replacement of equipment will require an electrical permit for inspection of the electrical scope. PLEASE NOTE: APPLICABLE ONLY TO SYSTEMS WITH FUEL BURNING APPLIANCES: All new | $7,594 | [MEC2026-00859](https://nearbypermits.com/boulder/permit/MEC2026-00859/) |
| Feb 3, 2025 | Roofing | *Voided for inactivity - no inspections for 180 days* Total tear-off & reroof of SFD, 10 squares of dimensional shingles on a pitch represented as 5/12. All roof materials shall be installed per manufacturer?s specs. Mid-roof inspection required if pitch is less than 4/12. All roof covering material | $15,000 | [RFG2025-00040](https://nearbypermits.com/boulder/permit/RFG2025-00040/) |

---
Source: Boulder Planning and Development Services permit data (https://www.arcgis.com/home/item.html?id=e3ff6248e4a547bcba31025d2c5c9fee). Checked 2026-10-06 10:43 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

All 3 permits at this address: https://nearbypermits.com/boulder/address/653-dewey-ave/
