# Alteration or repair permit BLD-NRE2024-00154 at 2100 Central Ave, Boulder

Boulder Planning and Development Services permit BLD-NRE2024-00154: issued Jul 23, 2025 for alteration or repair work at 2100 Central Ave. 180-day one-time extension request granted. Project must be completed by 3/13/2027. 10/15/25 Revision - Work to include removal of existing 2nd floor office space, exterior cosmetic upgrades, addition of an automatic sprinkler system, demolition and construction of partitions, ceilings, finishes, food service equipment mechanical, electrical, plumbing and fire protection as indicated on drawings. Bulletin 1 issued with changes to Architectural, MEP, Structural, and Lighting plans. Refer to clouded and noted changes as well as narrative of changes. 8/11/25 Revision- Work to include removal of existing 2nd floor office space, exterior cosmetic upgrades, addition of an automatic sprinkler system, demolition and construction of partitions, ceilings, finishes, food service equipment mechanical, electrical, plumbing and fire protection as indicated on drawings. Bulletin 1 issued with changes to Architectural, MEP, Structural, and Lighting plans. Refer to clouded and noted changes as well as narrative of changes. *5/15/25 Revision to Scope of work: Work to include removal of existing 2nd floor office space, exterior cosmetic upgrades, addition of an automatic sprinkler system, demolition and construction of partitions, ceilings, finishes, food service equipment mechanical, electrical, plumbing and fire protection as indicated on drawings. Work to include addition of second story exterior patio, exterior cosmetic upgrades, window replacement, addition of new elevator and interconnecting stair, addition of an automatic sprinkler system, demolition and construction of partitions, ceiling, finishes, mechanical, electrical, plumbing, and fire protection as indicated on drawings. 1/6/26 The only change is to sheet E.502 which is the electrical one-line. The change is to document the actual size of the transformer that will be installed by Xcel which was smaller than the planned transformer size. The engineer of record has reviewed and approved the change based on Xcel opting to install a smaller transformer than initially planned. The electrical inspector has required this update in order to pass our one-line inspection an allow for start-up of the electrical system and proceed with building system startup and commissioning activities to meet our planned opening date. 2/3/2026 Revisions to permit including minor changes described in the submitted change narratives as well as the revised Architectural, Civil, and Electrical drawings.

- Permit number: BLD-NRE2024-00154
- Issued: Jul 23, 2025
- Type of work: Alteration or repair (city: Building Permit - Non-Residential, Alteration)
- Status: Issued (city: Issued)
- Reported cost: $9,361,474
- ZIP code: 80301
- All permits at this address: https://nearbypermits.com/boulder/address/2100-central-ave/

---
Source: Boulder Planning and Development Services permit data (https://www.arcgis.com/home/item.html?id=e3ff6248e4a547bcba31025d2c5c9fee). Checked 2026-10-10 17:33 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Every permit at 2100 Central Ave: https://nearbypermits.com/boulder/address/2100-central-ave/