# Roofing permit RFG2025-00972 at 751 Grant Pl, Boulder

Boulder Planning and Development Services permit RFG2025-00972: issued Dec 11, 2025 for roofing work at 751 Grant Pl. Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). For roof/attic assemblies requiring 1/150 ventilation, include a calculation detailing the quantity of intake and exhaust vents demonstrating 1/150 venting ratio compliance". This will also be added to our roof inspection process as an inspection item. Pre-roof inspection required for all overlays. All Structures must be permitted separately Partial tear-off & reroof of SFD, 6 squares of modified bituminous on a pitch represented as less than 2/12. All roof materials shall be installed per manufacturer?s specs. *Existing solar to be removed and reattached as approved on ELE2024-00424 with no modifications* All roof covering materials shall be listed as Class A as tested in accordance with UL Standard 790 or ASTM Standard E 108. At inspection, provide to building inspection staff original wrappers of materials used or applied. Provide additional information -- such as manufacturer's cut sheet for other products used - including, but not limited to, items such as flashing, valley material, sealants, fasteners, ventilation devices or features and roof jacks & penetration boots. Send this if no letter is provided for FLAT ROOF ASSEMBLY ONLY! ?Attention: Wind speed requirements for Flat Membrane Roof Assemblies ? To ensure the safety and structural integrity of buildings within the City of Boulder, the following wind speed verifications are needed for all flat roof membrane assemblies: ? 1.? Engineered Design: A comprehensive engineered design for the flat membrane roof assembly must be submitted at the time of permit application. This design should detail all aspects of the assembly, including materials, installation methods, and load calculations, and number and layout of fasteners to achieve wind speed requirements. ? 2.? Alternative Option: Engineer?s Letter: As an alternative to submitting the full engineered design at the time of permit application, a stamped and signed letter from a qualified engineer will be accepted. This letter must be provided at the time of the mid-roof inspection. The letter should certify that the installed roof membrane assembly meets all applicable building codes and safety standards, based on an engineering review of the installation. Mid-roof inspection still needed to verify class A Fire Rated Assembly. If you have any questions or need further clarification, please contact the City of Boulder Planning and Development Services Dept through Inquire Boulder at https://user.govoutreach.com/boulder/faq.php?cmd=shell.?

- Permit number: RFG2025-00972
- Issued: Dec 11, 2025
- Type of work: Roofing (city: Roofing Replacement Permit, Roofing ? Existing Solar Panels)
- Status: Finished (city: Letter of Completion)
- Reported cost: $3,000
- ZIP code: 80302
- All permits at this address: https://nearbypermits.com/boulder/address/751-grant-pl/

---
Source: Boulder Planning and Development Services permit data (https://www.arcgis.com/home/item.html?id=e3ff6248e4a547bcba31025d2c5c9fee). Checked 2026-10-06 22:46 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Every permit at 751 Grant Pl: https://nearbypermits.com/boulder/address/751-grant-pl/
