# Roofing permit RFG2026-00415 at 1505 Poplar Ave, Boulder

Boulder Planning and Development Services permit RFG2026-00415: issued May 11, 2026 for roofing work at 1505 Poplar Ave. Detach and reset of existing PV as approved by permit ELE2018-00219. All Structures must be permitted separately Total tear-off & reroof of SFD, 5 squares of dimensional shingles on a pitch represented as 10/12, 19 squares of dimensional shingles on a pitch represented as 7/12, 7 squares of dimensional shingles on a pitch represented as 5/12, and 3 squares of dimensional shingles on a pitch represented as 3/12. All roof materials shall be installed per manufacturer?s specs. Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). Pre-roof inspection required for all overlays. All roof covering materials shall be listed as Class A as tested in accordance with UL Standard 790 or ASTM Standard E 108. At inspection, provide to building inspection staff original wrappers of materials used or applied. Provide additional information -- such as manufacturer's cut sheet for other products used - including, but not limited to, items such as flashing, valley material, sealants, fasteners, ventilation devices or features and roof jacks & penetration boots.

- Permit number: RFG2026-00415
- Issued: May 11, 2026
- Type of work: Roofing (city: Roofing Replacement Permit, Roofing ? Existing Solar Panels)
- Status: Issued (city: Issued)
- Reported cost: $13,000
- ZIP code: 80304
- All permits at this address: https://nearbypermits.com/boulder/address/1505-poplar-ave/

---
Source: Boulder Planning and Development Services permit data (https://www.arcgis.com/home/item.html?id=e3ff6248e4a547bcba31025d2c5c9fee). Checked 2026-10-09 18:58 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Every permit at 1505 Poplar Ave: https://nearbypermits.com/boulder/address/1505-poplar-ave/
