# Building permits at 751 E 104th St, Chicago, IL

Two permits on record here. The newest, Sep 24: Line voltage electrical work. Within a quarter mile, the city has issued 9 more permits (7 projects) since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 24, 2026 | Electrical | Line voltage electrical work. New permanent 200 amp service disconnecting means with 40 circuits. Receptacle outlets: 1. Lighting outlets: 1. Specific location: basement, exterior. | $3,800 | [B200513058](https://nearbypermits.com/chicago/permit/B200513058/) |
| Aug 5, 2026 | Solar | Install solar panels on roof of principal building. Roof type: sloped (2:12 to 5:12). Inverter output: 10 kw. Array output: 7.65 kw. Includes 13.5 kwh energy storage system. Location: roof planes of home. Icc distributed generation installer cert. #18-0817. | $19,535 | [B200480687](https://nearbypermits.com/chicago/permit/B200480687/) |

## Within ¼ mi since May 1, 2026

9 permits in the circle. From our copy of the city's data (last 24 months).

### Next door (under 250 ft), 1 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 7, 2026 | [10358 S Corliss Ave](https://nearbypermits.com/chicago/address/10358-s-corliss-ave/) | 230 ft E | Fence, wall or deck | Full rebuild (same as existing) for wood porch (open) (quantity: 1, location: north side of building). | $10,000 | [B200476915](https://nearbypermits.com/chicago/permit/B200476915/) |

### This block (250 to 1,000 ft), 4 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 16, 2026 | [721 E 104th St](https://nearbypermits.com/chicago/address/721-e-104th-st/) | 300 ft W | Electrical | Line voltage electrical work. Add 5 circuits to existing 200 amp service disconnecting means. Receptacle outlets: 5. Lighting outlets: 0. Specific location: basement/exterior. | $2,850 | [B200511934](https://nearbypermits.com/chicago/permit/B200511934/) |
| Sep 16, 2026 | [721 E 104th St](https://nearbypermits.com/chicago/address/721-e-104th-st/) | 300 ft W | Electrical | Line voltage electrical work. New permanent 200 amp service disconnecting means with 5 circuits. Receptacle outlets: 5. Lighting outlets: 0. Specific location: basement/exterior. | $9,500 | [B200511932](https://nearbypermits.com/chicago/permit/B200511932/) |
| Sep 15, 2026 | [738 E 105th St](https://nearbypermits.com/chicago/address/738-e-105th-st/) | 590 ft S | Alteration or repair | Spr 2019 CBC proposed architectural, mechanical, electrical and plumbing and new rear stair and landing for a two story single family masonry building with basement as per plans | $80,000 | [101082723](https://nearbypermits.com/chicago/permit/101082723/) |
| May 14, 2026 | [810 E 103rd St](https://nearbypermits.com/chicago/address/810-e-103rd-st/) | 850 ft NE | Other | Approval of new plan for stormwater management. Project type: park/recreation. Project area: 2.45 acres. This approval does not authorize any construction work. Construction work may require separate permit(s). | Not listed | [B200459736](https://nearbypermits.com/chicago/permit/B200459736/) |

### Farther (1,000 ft to ¼ mi), 4 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 6, 2026 | [10519 S Cottage Grove Ave](https://nearbypermits.com/chicago/address/10519-s-cottage-grove-ave/) | 0.21 mi SW | Electrical | Line voltage electrical work. New permanent 100 amp service disconnecting means with 24 circuits. Receptacle outlets: 1. Lighting outlets: 1. Specific location: basement, exterior. | $5,000 | [B200477371](https://nearbypermits.com/chicago/permit/B200477371/) |
| May 28, 2026 | [10519 S Cottage Grove Ave](https://nearbypermits.com/chicago/address/10519-s-cottage-grove-ave/) | 0.21 mi SW | Electrical | Line voltage electrical work. New permanent 100 amp service disconnecting means with 1 circuits. Receptacle outlets: 1. Lighting outlets: 0. Specific location: exterior. | $400 | [B200472221](https://nearbypermits.com/chicago/permit/B200472221/) |
| Jun 5, 2026 | [10519 S Cottage Grove Ave](https://nearbypermits.com/chicago/address/10519-s-cottage-grove-ave/) | 0.21 mi SW | Solar | Install solar panels on roof of accessory building. Roof type: steep (>5:12). Inverter output: 10 kw. Array output: 3.28 kw. Includes 15 kwh energy storage system. Location: roof planes of detached structure. Icc distributed generation installer cert. #18-0817. | $6,232 | [B200472217](https://nearbypermits.com/chicago/permit/B200472217/) |
| Jun 5, 2026 | [10519 S Cottage Grove Ave](https://nearbypermits.com/chicago/address/10519-s-cottage-grove-ave/) | 0.21 mi SW | Solar | Install solar panels on roof of principal building. Roof type: steep (>5:12). Inverter output: 10 kw. Array output: 4.92 kw. Includes 15 kwh energy storage system. Location: roof planes of main house. Icc distributed generation installer cert. #18-0817. | $14,348 | [B200472215](https://nearbypermits.com/chicago/permit/B200472215/) |

---
Source: Chicago Department of Buildings permit data (https://data.cityofchicago.org/d/ydr8-5enu). Checked 2026-10-03 22:33 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

This site provides applications using data that has been modified for use from its original source, www.cityofchicago.org, the official website of the City of Chicago. The City of Chicago makes no claims as to the content, accuracy, timeliness, or completeness of any of the data provided at this site. The data provided at this site is subject to change at any time. It is understood that the data provided at this site is being used at one's own risk.