# Building permits at 976 E 63rd St, Cleveland, OH

Two permits here in the last two years. The newest, Sep 8: INSTALL 125 SQAURE FEET: Running fiber from meet-me-point vault to T-Mobile equipment. Within a quarter mile, the city has issued 6 more permits since May 1. One is for a new building, 830 ft away.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 8, 2026 | Electrical | INSTALL 125 SQAURE FEET: Running fiber from meet-me-point vault to T-Mobile equipment. Adding two new breakers. Building permit no bcb26-034003 | $7,500 | [BCE26-038184](https://nearbypermits.com/cleveland/permit/BCE26-038184/) |
| Sep 8, 2026 | Alteration or repair | Exterior alterations to mounting and layout for existing fiber site. Separate electrical permit required. No change of occupancy with this permit. | $29,598 | [BCB26-034003](https://nearbypermits.com/cleveland/permit/BCB26-034003/) |

## Within ¼ mi since May 1, 2026

6 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 4 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 14, 2026 | [6313 St Clair Ave](https://nearbypermits.com/cleveland/address/6313-st-clair-ave/) | 660 ft SE | Alteration or repair | Ovv-to be boarded 1 garage door (single overhead) | Not listed | [B26039362](https://nearbypermits.com/cleveland/permit/B26039362/) |
| Jul 17, 2026 | [6400 St Clair Ave](https://nearbypermits.com/cleveland/address/6400-st-clair-ave/) | 830 ft SE | New building | Install one (1) 19.56 sq.ft. Internally illuminated wall mounted sign + (2) awning signs as per approved plan and cpc approval. (Separate electrical permit required). | $5,000 | [B25036685](https://nearbypermits.com/cleveland/permit/B25036685/) |
| May 18, 2026 | [1026 E 61st St](https://nearbypermits.com/cleveland/address/1026-e-61st-st/) | 640 ft SW | Alteration or repair | Make ext. ALT. To tear off and re-roof per manufacture specs., and present city code. No structural changes. Remove debris from site. | $9,000 | [BRB26-019193](https://nearbypermits.com/cleveland/permit/BRB26-019193/) |
| May 8, 2026 | [6311 St Clair Ave](https://nearbypermits.com/cleveland/address/6311-st-clair-ave/) | 640 ft SE | Electrical | Make alterations to correct v16023846. Repair in-kind per approved drawings and field inspection. Separate plumbing, HVAC and electrical permits are required. Certificate of occupancy is required. | $60,000 | [BCB26-015576](https://nearbypermits.com/cleveland/permit/BCB26-015576/) |

### Farther (1,000 ft to ¼ mi), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jun 29, 2026 | [1072 Addison Rd](https://nearbypermits.com/cleveland/address/1072-addison-rd/) | 0.25 mi SE | Alteration or repair | Ovv-to be boarded 2 standard sized windows (1 rear basement, 1 right side basement) 1 standard sized door (left) extra (1) standard window | Not listed | [B26026538](https://nearbypermits.com/cleveland/permit/B26026538/) |
| Jun 11, 2026 | [6524 St Clair Ave](https://nearbypermits.com/cleveland/address/6524-st-clair-ave/) | 0.23 mi E | Sign | Reface existing 18 sq.ft. internally illuminated blade sign cabinet made of aluminum as per plan and as per CPC approval. | $4,000 | [BCB26-023950](https://nearbypermits.com/cleveland/permit/BCB26-023950/) |

## More on this street

Other addresses on E 63rd St with permits, nearest house number first:

- [971 E 63rd St](https://nearbypermits.com/cleveland/address/971-e-63rd-st/): newest permit Oct 8, 2025
- [1156 E 63rd St](https://nearbypermits.com/cleveland/address/1156-e-63rd-st/): newest permit Nov 21, 2024
- [2309 E 63rd St](https://nearbypermits.com/cleveland/address/2309-e-63rd-st/): newest permit Sep 15, 2026
- [2325 E 63rd St](https://nearbypermits.com/cleveland/address/2325-e-63rd-st/): newest permit Sep 30, 2026
- [2328 E 63rd St](https://nearbypermits.com/cleveland/address/2328-e-63rd-st/): newest permit Mar 25, 2026
- [2350 E 63rd St](https://nearbypermits.com/cleveland/address/2350-e-63rd-st/): newest permit Oct 8, 2024
- [2355 E 63rd St](https://nearbypermits.com/cleveland/address/2355-e-63rd-st/): newest permit Oct 17, 2025
- [2366 E 63rd St](https://nearbypermits.com/cleveland/address/2366-e-63rd-st/): newest permit Jun 27, 2025
- [2367 E 63rd St 1](https://nearbypermits.com/cleveland/address/2367-e-63rd-st-1/): newest permit Jun 29, 2026
- [2412 E 63rd St](https://nearbypermits.com/cleveland/address/2412-e-63rd-st/): newest permit Apr 21, 2026

---
Source: Cleveland Department of Building and Housing permit data (https://www.arcgis.com/home/item.html?id=c08ddeaf2d1e41679a03103ff4e9fe17), City of Cleveland, ODbL 1.0 (https://opendatacommons.org/licenses/odbl/1-0/). Checked 2026-10-07 07:28 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Contains information from Issued Building Permits (City of Cleveland), which is made available here under the Open Database License (ODbL). Database: https://www.arcgis.com/home/item.html?id=c08ddeaf2d1e41679a03103ff4e9fe17 License: https://opendatacommons.org/licenses/odbl/1-0/

Map, both permits at this address and 6 nearby: https://nearbypermits.com/cleveland/address/976-e-63rd-st/
