# Building permits at 1041 S 78th St, Mesa, AZ

One permit on record here. The newest, May 23, 2025: Hall Bath- Demo tub and wall surrounds. Within a quarter mile, applicants have filed 5 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| May 23, 2025 | Plumbing | Hall Bath- Demo tub and wall surrounds, install right hand shower pan and wall surrounds. Update valve and trim. | Not listed | [PMT25-09499](https://nearbypermits.com/mesa/permit/PMT25-09499/) |

## Within ¼ mi since May 1, 2026

5 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 3 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Aug 19, 2026 | [7661 E Euclid Ave](https://nearbypermits.com/mesa/address/7661-e-euclid-ave/) | 990 ft NW | Addition | Addition of New 21 Sq Ft Shower, interior renovations, upgrade electrical, plumbing and mechanical and replace old patio beam to existing SFR. No change in footprint or added square footage. Minimum required building inspections: Frame, mechanical rough in, electric rough in, plumbing rough in, show | Not listed | [PMT26-15345](https://nearbypermits.com/mesa/permit/PMT26-15345/) |
| Aug 17, 2026 | [1128 S 79th Pl](https://nearbypermits.com/mesa/address/1128-s-79th-pl/) | 790 ft SE | Addition | Addition of 200 sq ft attached patio to existing SFR Minimum required inspections: Footing, stem, frame, shear, and final. | Not listed | [PMT26-15070](https://nearbypermits.com/mesa/permit/PMT26-15070/) |
| May 25, 2026 | [931 S 78th St](https://nearbypermits.com/mesa/address/931-s-78th-st/) | 570 ft N | Plumbing | Primary bathroom like-for-like shower replacement with 60x34 preformed shower base, no drain relocation, no structural changes. | Not listed | [PMT26-09807](https://nearbypermits.com/mesa/permit/PMT26-09807/) |

### Farther (1,000 ft to ¼ mi), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 6, 2026 | [1113 S 79th Way](https://nearbypermits.com/mesa/address/1113-s-79th-way/) | 0.20 mi SE | Electrical | Addition of standard 50amp circuit for Level 2 EV Charging Equipment from SES / All-In-One on north side of house to garage directly south of panel. | Not listed | [PMT26-12299](https://nearbypermits.com/mesa/permit/PMT26-12299/) |
| May 20, 2026 | [7952 E Gale Ave](https://nearbypermits.com/mesa/address/7952-e-gale-ave/) | 0.24 mi SE | Electrical | Permit is only for installation of one tesla powerwall3 battery and expansion pack. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or | Not listed | [PMT26-09704](https://nearbypermits.com/mesa/permit/PMT26-09704/) |

## Zoning requests nearby

We don't list zoning cases for Mesa yet. Look them up on the city's Board of Adjustment page: https://www.mesaaz.gov/Government/Advisory-Boards-Committees/Board-of-Adjustment

## More on this street

Other addresses on S 78th St with permits, nearest house number first:

- [1016 S 78th St](https://nearbypermits.com/mesa/address/1016-s-78th-st/): newest permit Feb 13, 2026
- [931 S 78th St](https://nearbypermits.com/mesa/address/931-s-78th-st/): newest permit May 25, 2026
- [1332 S 78th St](https://nearbypermits.com/mesa/address/1332-s-78th-st/): newest permit Oct 5, 2026
- [1809 S 78th St](https://nearbypermits.com/mesa/address/1809-s-78th-st/): newest permit Mar 24, 2025

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-10 00:12 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, the one permit at this address and 5 nearby: https://nearbypermits.com/mesa/address/1041-s-78th-st/
