# Building permits at 10519 E Palladium Dr, Mesa, AZ

Two permits on record here. The newest, Mar 14, 2025: Installation of a 60 amp circuit breaker for a ford charge station pro vehicle charger in the garage. Within a quarter mile, the city has issued 4 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Mar 14, 2025 | Electrical | Installation of a 60 amp circuit breaker for a ford charge station pro vehicle charger in the garage. Existing 225 amp service meter. Electrical shall be installed per manufactures specifications and comply with 2017 nec and srp standards. | Not listed | [PMT25-04724](https://nearbypermits.com/mesa/permit/PMT25-04724/) |
| Jun 21, 2017 | Roofing | Master plan 2 spruce one story residence with 3 car garage. 3 Different styles with extra porches and pop-outs at the corner lots. Wood framed, post tensioned slab and concrete roof tiles. | Not listed | [BLD2017-04395](https://nearbypermits.com/mesa/permit/BLD2017-04395/) |

## Within ¼ mi since May 1, 2026

4 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 23, 2026 | [10452 E Corbin Ave](https://nearbypermits.com/mesa/address/10452-e-corbin-ave/) | 940 ft N | Electrical | Permit is only for the installation of one tesla powerwall3 battery. B.e.s.s. Shall be installed in accordance with NFPA 70 per r327.4. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic sys | Not listed | [PMT26-13534](https://nearbypermits.com/mesa/permit/PMT26-13534/) |
| Jul 15, 2026 | [10546 E Sheffield Dr](https://nearbypermits.com/mesa/address/10546-e-sheffield-dr/) | 530 ft SE | Pool or spa | Construct a 540 sf swimming pool with 18.5-ft x 17-ft alumawood shade pergola and concrete media wall. No spa/ no gas. All electrical to comply with 2023 nec requirements. This permit does not include any accessory structures. Registered structural professional engineer: alan E. Money #30895, expire | Not listed | [PMT26-13015](https://nearbypermits.com/mesa/permit/PMT26-13015/) |

### Farther (1,000 ft to ¼ mi), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Aug 19, 2026 | [10704 E Stearn Ave](https://nearbypermits.com/mesa/address/10704-e-stearn-ave/) | 0.24 mi SE | Electrical | Permit is only for installation of two tesla powerwall 3 batteries and expansion pack. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires | Not listed | [PMT26-15290](https://nearbypermits.com/mesa/permit/PMT26-15290/) |
| Aug 6, 2026 | [10407 E Bergeron Ave](https://nearbypermits.com/mesa/address/10407-e-bergeron-ave/) | 0.22 mi SW | Pool or spa | Construct a 490 sf swimming pool & 56 sf spa with natural gas heat. Installation of 160-ft of 2-in pe gas line buried 18-in deep with 14 gauge tracer wire from gas meter to 400k btu pool heater. All gas lines to be installed per 2024 ifgc & SW gas requirements. SW Gas to determine if meter needs to  | Not listed | [PMT26-14438](https://nearbypermits.com/mesa/permit/PMT26-14438/) |

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb). Checked 2026-10-05 11:13 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, both permits at this address and 4 nearby: https://nearbypermits.com/mesa/address/10519-e-palladium-dr/
