# Building permits at 10749 E Main St 102, Mesa, AZ

One permit on record here. The newest, Jan 13, 2025: Remove (2) existing T-Mobile signs and Install (2) two new face lit pan channel letters on backer on north. Within a quarter mile, the city has issued 3 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Jan 13, 2025 | Sign | Remove (2) existing T-Mobile signs and Install (2) two new face lit pan channel letters on backer on north (38 sq. ft.) and west (32 sq. Ft.) elevations tmobile authorized retailer 70 sq. ft. total | Not listed | [PMT25-00770](https://nearbypermits.com/mesa/permit/PMT25-00770/) |

## Within ¼ mi since May 1, 2026

3 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 1 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 1, 2026 | [10839 E Main St 113](https://nearbypermits.com/mesa/address/10839-e-main-st-113/) | 800 ft E | Alteration or repair | Interior non-structural tenant improvement of existing commercial suite. | Not listed | [PMT26-17745](https://nearbypermits.com/mesa/permit/PMT26-17745/) |

### Farther (1,000 ft to ¼ mi), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 4, 2026 | [139 S 108th Pl](https://nearbypermits.com/mesa/address/139-s-108th-pl/) | 0.23 mi SE | Electrical | Permit is only for installation of one tesla powerwall 3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule  | Not listed | [PMT26-16278](https://nearbypermits.com/mesa/permit/PMT26-16278/) |
| Jul 23, 2026 | [10701 E Arbor Ave](https://nearbypermits.com/mesa/address/10701-e-arbor-ave/) | 0.19 mi SW | Electrical | Permit is only for the installation of one tesla powerwall3 battery. B.e.s.s. Shall be installed in accordance with NFPA 70 per r327.4. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic sys | Not listed | [PMT26-13514](https://nearbypermits.com/mesa/permit/PMT26-13514/) |

## More on this street

Other addresses on E Main St with permits, nearest house number first:

- [10715 E Main St](https://nearbypermits.com/mesa/address/10715-e-main-st/): newest permit May 29, 2025
- [10839 E Main St 113](https://nearbypermits.com/mesa/address/10839-e-main-st-113/): newest permit Oct 1, 2026
- [10603 E Main St](https://nearbypermits.com/mesa/address/10603-e-main-st/): newest permit Jun 2, 2026
- [10545 E Main St](https://nearbypermits.com/mesa/address/10545-e-main-st/): newest permit Apr 2, 2026
- [9705 E Main St](https://nearbypermits.com/mesa/address/9705-e-main-st/): newest permit Dec 26, 2024
- [9310 E Main St 123](https://nearbypermits.com/mesa/address/9310-e-main-st-123/): newest permit Apr 15, 2025
- [9202 E Main St](https://nearbypermits.com/mesa/address/9202-e-main-st/): newest permit May 15, 2025
- [7807 E Main St Cc104](https://nearbypermits.com/mesa/address/7807-e-main-st-cc104/): newest permit Nov 25, 2025
- [7527 E Main St](https://nearbypermits.com/mesa/address/7527-e-main-st/): newest permit Nov 24, 2025
- [7516 E Main St 6](https://nearbypermits.com/mesa/address/7516-e-main-st-6/): newest permit Dec 23, 2024

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-06 22:31 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, the one permit at this address and 3 nearby: https://nearbypermits.com/mesa/address/10749-e-main-st-102/
