11202 E Germann Rd 15, Mesa has 31 building permits on record. The most recent, opened Apr 20, 2026, is for other: Afp26-05372 the scope of work includes the installation of a relocated storage magazine. The storage magazine will be placed on a new concrete pad. Storage magazine not to exceed 1…

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Apr 20, 2026 | Other | Afp26-05372 the scope of work includes the installation of a relocated storage magazine. The storage magazine will be placed on a new concrete pad. Storage magazine not to exceed 100 lbs of 1.4. Per ifc tables 5604.5.2 (1)(1.1), 5604.5.2(2)(1.3), or 5604.5.2(3)(1.4). | – | [PMT26-07737](https://nearbypermits.com/mesa/permit/PMT26-07737/) |
| Mar 10, 2025 | Electrical | Demo existing exterior hvac chillers, partial concrete slab, and pair of doors. Install new concrete slabs, double doors, and baler. Electrical and structural work. Special inspections concrete, soils, and epoxy/expansion anchors. Results in CoC. | – | [PMT25-04375](https://nearbypermits.com/mesa/permit/PMT25-04375/) |
| Mar 10, 2025 | Fire systems | Install new exterior HVAC unit with new concrete equipment pad. HVAC unit will serve the existing building 'K' bay. Mechanical and electrical work. Special inspection concrete and steel. Deferred Fire Alarms. Results in CoC | – | [PMT25-04374](https://nearbypermits.com/mesa/permit/PMT25-04374/) |
| Jun 3, 2024 | Fire systems | EXPEDITE - Change of occupancy for building area "K" from S-1 to H-3. Install assembly line for constructing inflators. Fire sprinkler plans provided. Deferred fire alarms. Related to PMT24-06506 case study. | – | [PMT24-10229](https://nearbypermits.com/mesa/permit/PMT24-10229/) |
| May 2, 2024 | Elevator | The project scope involves the installation of electrical for new sewer lift station. The new equipment will have new electrical distribution but connecting into existing electrical on site. Special inspections are required for concrete and steel. | – | [PMT24-08294](https://nearbypermits.com/mesa/permit/PMT24-08294/) |
| Apr 7, 2024 | Other | The project scope involves: code study submittal for building 15 area "k" for the installtion of pre-assembly line #324 and inflator final assembly line #325. Case study completed with response report recommending revisions to analysis report for change of occupancy permit submittal. | – | [PMT24-06506](https://nearbypermits.com/mesa/permit/PMT24-06506/) |
| Apr 21, 2023 | Demolition | Modification to Area J minor interior demolition add compressor and support equipment. At area K: relocation of compactor access ramp and platform on south side, infill interior and exterior wall, add concrete pad for magazine on south side. Modify electrical and mechanical distribution for new work | – | [PMT23-06981](https://nearbypermits.com/mesa/permit/PMT23-06981/) |
| May 19, 2022 | Fire systems | Install new piping and sprinkler heads in the new TRW building 15 I-bay. | – | [PMT22-09439](https://nearbypermits.com/mesa/permit/PMT22-09439/) |
| Sep 10, 2021 | Alteration or repair | The project scope includes: for building 15 area 'g', work includes the demolition of the existing office walls and existing office furniture. The demolition of the existing ct scan room. Install flexcells 194, 195, 196, 305, 307, 309. Hd 1.4 will not exceed 50 lbs. In use and 50 lbs. In storage agg | – | [PMT21-14936](https://nearbypermits.com/mesa/permit/PMT21-14936/) |
| Mar 23, 2021 | Electrical | The project scope involved the installation of 2 gas tank vessels and associated equipment: existing area 'p' gas pad install vertical argon tank and vaporizers on existing equipment pad. Existing area 'q' gas pad install vertical nitrogen tank on new concrete equipment slab. Special inspections req | – | [PMT21-04881](https://nearbypermits.com/mesa/permit/PMT21-04881/) |
| Jan 20, 2021 | Alteration or repair | The project scope includes the removal of existing equipment and the installation of a new tube wash system. Existing mechanical, plumbing, & electrical services will be modified to accommodate the equipment installation. | – | [PMT21-01050](https://nearbypermits.com/mesa/permit/PMT21-01050/) |
| Jan 20, 2021 | Alteration or repair | The project scope includes the installation of the new igniter sub-assembly line l312 and l314 in b15/n. Existing mechanical, plumbing, & electrical services will be modified to accommodate the equipment installation. | – | [PMT21-01049](https://nearbypermits.com/mesa/permit/PMT21-01049/) |
| Jan 20, 2021 | Electrical | The project scope includes: the installation of 4 total dust collectors. 2 Dust collectors in b/15 area 'm' and 2 dust collectors in b/15 area 'n' with electrical power distribution and mechanical distribution. Also, the removal and relocation of existing door to new location. Existing mechanical &  | – | [PMT21-01048](https://nearbypermits.com/mesa/permit/PMT21-01048/) |
| Jan 11, 2021 | Mechanical (HVAC) | The project scope includes the modification of an existing concrete equipment pad and the installation of a new HVAC unit with ductwork in existing building. | – | [PMT21-01047](https://nearbypermits.com/mesa/permit/PMT21-01047/) |
| Jun 17, 2020 | Mechanical (HVAC) | Install dehumidifiers to Building 15 Areas C & M into existing rooms adjacent to each propellant load rooms. Provide in process staging of HD 1.4 articles in Dehumidifier Mechanical Room in B15/Area C2. | – | [PMT20-10391](https://nearbypermits.com/mesa/permit/PMT20-10391/) |
| Nov 6, 2019 | Electrical | The project scope includes the installation of the new igniter sub-assembly line #194 in b15/p2. 2 New staged pallets, removal of 1 fixed daybox and the relocation of 2 mobile dayboxes. Existing mechanical, plumbing, & electrical services will be modified to accommodate the equipment installation. E | – | [PMT19-16165](https://nearbypermits.com/mesa/permit/PMT19-16165/) |
| Aug 28, 2019 | New building | Code study only / no new construction - the project scope includes the justification for use of hazardous materials in the production of airbag inflator assemblies on the "di-10" inflator assembly line in b15/d (previously permitted under com #pmt19-04443 / #pmt19-04443a): inflator operations will b | – | [PMT19-13284](https://nearbypermits.com/mesa/permit/PMT19-13284/) |
| Jul 11, 2019 | Electrical | Afp19-08428 - the project scope includes the installation of the new shi-2 inflator inert gas fill assembly line 140 with associated support equipment. Existing mechanical, plumbing, & electrical services will be modified to accommodate the equipment installation. Exist. HAZ. Mat'l. Quantities for b | – | [PMT19-10818](https://nearbypermits.com/mesa/permit/PMT19-10818/) |
| May 29, 2019 | Electrical | Afp19-08428 the project scope includes the following: · remove & replace existing (2) laser generator and (2) chiller units w/ newer model laser generator / chiller package units (3 total). · Relocate existing workbench and (2) toolboxes / install new workbenches, toolboxes and storage racks. Existi | – | [PMT19-08449](https://nearbypermits.com/mesa/permit/PMT19-08449/) |
| May 28, 2019 | Other | Annual facilities permit for trw site on germann rd for 2019 | – | [AFP19-08428](https://nearbypermits.com/mesa/permit/AFP19-08428/) |
| Apr 16, 2019 | Fire systems | Adding new fire alarm devices to existing system | – | [PMT19-05666](https://nearbypermits.com/mesa/permit/PMT19-05666/) |
| Mar 25, 2019 | Demolition | The project scope is for the installation and energizing of inflator assembly equipment for testing purposes only. Existing "di-9" line hazardous material quantities will be removed under this submittal from those previously permitted under com #bld2017-03799. Use of hazardous materials for future " | – | [PMT19-04443](https://nearbypermits.com/mesa/permit/PMT19-04443/) |
| Sep 5, 2018 | Alteration or repair | Install new 13k gallon argon tank with supporting equipment being placed on new 4-inch thick pressured to 4k-lbs concrete pad. No new covered areas. Remove existing horizontal tanks. Existing 1.4q hazardous material quantities will not be increased from previously permitted quantities approved under | – | [PMT18-12760](https://nearbypermits.com/mesa/permit/PMT18-12760/) |
| Sep 4, 2018 | Electrical | Demo existing assembly for line #7, remove and replace existing obsolete laser generator and chiller units, reconfigure existing assembly equipment, install roi inflator sub-assembly line #316, modify existing mechanical exhaust and electrical power supply to accommodate equipment reconfiguration. U | – | [PMT18-12763](https://nearbypermits.com/mesa/permit/PMT18-12763/) |
| May 22, 2018 | Fire systems | The project scope includes the installation of the new "SPI2-EVO" Inflator Assembly Line #311 & misc. support equipment including 3 interior vent chambers in B15/B1 to match the existing "SPI2-EVO" Inflator Assembly Lines #300 & #301 in B15/A (COM #BLD2014-01429 & #BLD2016-04071 respectively). Exist | – | [PMT18-07994](https://nearbypermits.com/mesa/permit/PMT18-07994/) |
| May 21, 2018 | Electrical | AFP #AFP18-01870 - The project scope includes the following: · Installation of a new exterior roll-up door in an existing framed opening. · Installation of a new "Hoffer" compressor on a new concrete isolation pad (to match exist). · Remove & replace an existing HVAC unit & modification of the exist | – | [PMT18-07835](https://nearbypermits.com/mesa/permit/PMT18-07835/) |
| Oct 16, 2017 | Fire systems | The project scope of work in b15/area 'q2' includes the following: 1. The construction of a building addition onto the south end of exist. B15/Q1. 2. The installation of shi-2 inflator assembly line #199 and assoc. Support equipment. 3. Installation of 5 new "interceptor-qr" indoor explosion capture | – | [PMT17-05043](https://nearbypermits.com/mesa/permit/PMT17-05043/) |
| Sep 5, 2017 | Addition | Expedited review per donna canale the project scope of work includes civil and site modifications in advance of the "b15/area 'q2' building addition" construction (under future submittal) - modifications to include: · removal of exist. Asphalt paving · removal of exist. Conc. Sidewalks and aprons ·  | – | [PMT17-03297](https://nearbypermits.com/mesa/permit/PMT17-03297/) |
| Oct 25, 2004 | Other | Code Study For HGI assembly line in area A of Building 15. | – | [BLD2004-08426](https://nearbypermits.com/mesa/permit/BLD2004-08426/) |
| Oct 25, 2004 | Addition | PRJ769 - Code Study For HGI assembly line in area M of Building 15. Reference remodel permit bld2004-08424. Study is to allow the use an inflator assembly line utilizing hydrogen gas. Additional hydrogen gas storage to be added to exisiting exterior gas pad. | – | [BLD2004-08425](https://nearbypermits.com/mesa/permit/BLD2004-08425/) |
| Oct 25, 2004 | Addition | Prj769 - revise assembly line for hgi, install hydrogen storage, supply and fill stations with gas monitoring system. Add 1,033 SQ. FT. To existing gas pad canopy to cover additional equipment. Modification to the Code not required as per previously approved method of plan review & permitting at thi | – | [BLD2004-08424](https://nearbypermits.com/mesa/permit/BLD2004-08424/) |

---