# Building permits at 11202 E Germann Rd, Mesa, AZ

11202 E Germann Rd, Mesa has 154 building permits on record. The most recent, opened Mar 16, 2026, is for other: Zf afp annual facilities permit for zf passive safety systems US inc for year 2026

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Mar 16, 2026 | Other | Zf afp annual facilities permit for zf passive safety systems US inc for year 2026 | – | [AFP26-05372](https://nearbypermits.com/mesa/permit/AFP26-05372/) |
| Jan 24, 2023 | Plumbing | The proposed improvements include approximately 3,531 linear feet of new 12-inch sanitary sewer and 40 linear feet of 8-inch sanitary sewer pipe. These improvements will connect into the existing 12-inch sewer main downstream and into the 12-inch sewer main upstream. After construction and City appr | – | [PMT23-01181](https://nearbypermits.com/mesa/permit/PMT23-01181/) |
| Feb 9, 2018 | Other | Annual facilities permit (mother permit) for trw for year 2018 | – | [AFP18-01870](https://nearbypermits.com/mesa/permit/AFP18-01870/) |
| Jul 14, 2017 | Electrical | AFP - B15 / Areas K & Q Equipment Relocation project, TRW Site II The scope of work is as follows: Area 'Q'. Remove existing x-ray machine and steel guardrail system. Relocate existing Flexcell Assembly Lines. Exist. mechanical and electrical systems will be modified as required. Existing hazardous  | – | [BLD2017-04584](https://nearbypermits.com/mesa/permit/BLD2017-04584/) |
| Jun 8, 2017 | Electrical | AFP- Bldg. 2 Warehouse tenant improvements project for TRW / Site II. The scope of work is as follows: Remove and replace an exist. chiller unit w/ modifications to the exist. conc. pad. Installation of office cubicles in the exist. 2nd. story office space previously relocated from Bldg. 2 to Bldg.  | – | [BLD2017-04293](https://nearbypermits.com/mesa/permit/BLD2017-04293/) |
| Jun 8, 2017 | Electrical | AFP: Bldg. 16 / ESF Relocation project for TRW / Site II. The project scope involves relocating existing environmental services operations from Bldg. 15-8 (previously permitted under com #bld2015-00109) to the Bldg. 16 / Apache Tank Farm. Existing mechanical and electrical services will be modified  | – | [BLD2017-04291](https://nearbypermits.com/mesa/permit/BLD2017-04291/) |
| May 23, 2017 | Alteration or repair | Pbi - permit to install new "ignition unit pre assembly line" with h-2/iib blast chimeny and 20 paf lexan shielding. No modification to the fire protection systems. | – | [BLD2017-03799](https://nearbypermits.com/mesa/permit/BLD2017-03799/) |
| Apr 13, 2017 | Fire systems | Addenda to bld2017-00977 - adding some addtional fire alarm devices to the original scope of work for m-bay. 3 Heat detectors, 1 pull station, 1 horn strobe and 1 relay module. | – | [BLD2017-02739](https://nearbypermits.com/mesa/permit/BLD2017-02739/) |
| Feb 9, 2017 | Fire systems | Refbld2016-08163 furnish & install 2 uv/ir flame detectors onto existing early warning control panel connected to existing fire alarm system. | – | [BLD2017-00977](https://nearbypermits.com/mesa/permit/BLD2017-00977/) |
| Feb 1, 2017 | Fire systems | Addenda (ref bld2016-06884) to replace existing fire alarm panel with a new notifier nfs2-640 fire alarm panel. Also replacing the existing monitoring modules with new monitor modules. Demoing devices in building 25. Added water flow and tamper switches in buildngs 24 and 26. All other devices are e | – | [BLD2017-00705](https://nearbypermits.com/mesa/permit/BLD2017-00705/) |
| Jan 23, 2017 | Alteration or repair | Permit to repair and replace existing laser welder with newer model. Connect to existing exhaust, modify as needed | – | [BLD2017-00442](https://nearbypermits.com/mesa/permit/BLD2017-00442/) |
| Dec 21, 2016 | Mechanical (HVAC) | No new square footage or utilities. Installation of di-10 inflator line-exist mechanical, electric services and hazardous material. Quantities to be modified as required. Deferred fire sprinklers and fire alarms. | – | [BLD2016-08163](https://nearbypermits.com/mesa/permit/BLD2016-08163/) |
| Nov 22, 2016 | Fire systems | Deferred fire sprinklers. In-rack sprinklers. Ref bld2016-02216. Fees paid on main. | – | [BLD2016-07591](https://nearbypermits.com/mesa/permit/BLD2016-07591/) |
| Oct 25, 2016 | Fire systems | Replace existing fire alarm panel with a new notifier nfs2-640 fire alarm panel. Also replacing the existing monitoring modules with new monitor modules. Demoing devices in building 25. Added water flow and tamper switches in buildngs 24 and 26. All other devices are existing and to remain unchanged | – | [BLD2016-06884](https://nearbypermits.com/mesa/permit/BLD2016-06884/) |
| Sep 23, 2016 | Electrical | AFP...B15/A Dust Collector Installation project for TRW Site II. The scope of work is as follows: Removal of the existing exterior vacuum pump with concrete pad. and shade cover. Installation of a new interior dust collector and modification of the existing ductwork. 1.16, 4.02 & 6.02 to vent weldin | – | [BLD2016-06230](https://nearbypermits.com/mesa/permit/BLD2016-06230/) |
| Jul 19, 2016 | Fire systems | AFP -Remove an existing hollow metal door and install a new double hollow metal door Bldg. 15 / Area "P2" - Existing structural cross-bracing will be modified to accommodate the new door installation. No changes will be made to the existing mechanical and electrical systems. No changes will be made  | – | [BLD2016-04618](https://nearbypermits.com/mesa/permit/BLD2016-04618/) |
| Jun 23, 2016 | Alteration or repair | Removal of the existing shi-2 inflator assembly line, existing steel equipment platform and assoc. Support equipment. Installation of new "sp12-evo" inflator assembly line #301 & misc. Support equipment including 3 interior vent chambers in b15/a to match the existing "sp12-evo" inflator assembly li | – | [BLD2016-04071](https://nearbypermits.com/mesa/permit/BLD2016-04071/) |
| Apr 13, 2016 | Fire systems | AFP: Building 15 "B" Igniter #307. Installation ignition unit pre-assembly install #307. Modify existing mechanical and electrical systems. Fire supression and fire alarm to remain unchanged | – | [BLD2016-02356](https://nearbypermits.com/mesa/permit/BLD2016-02356/) |
| Apr 12, 2016 | Alteration or repair | Scope of work includes demo of existing office space; reconfiguration of existing assembly equipment; installation of roi assembly equipment previously installed in b15/q (com# afp# bld2007-01878-g0046/removed under bld 2016-00935); installation of an existing di-10 igniter sub-assembly line relocat | – | [BLD2016-02304](https://nearbypermits.com/mesa/permit/BLD2016-02304/) |
| Apr 6, 2016 | Alteration or repair | Combine an existing training room and conference room to make one large office area, redesignation of areas within b2 warehouse to facilitate the relocation of shipping/receiving, inspection ops. Previously relocated from b2 to b15k (bld2010-03041). Convert existing office in warehouse area into an  | – | [BLD2016-02216](https://nearbypermits.com/mesa/permit/BLD2016-02216/) |
| Feb 17, 2016 | Electrical | AFP: Removal of Existing "Finish Lines 'A' & 'C'" and existing "ROI Lines 3 & 4" with assoc. support equipment. Relocate Existing Helium Leak Check Lines 197/198 with assoc. support equipment. Install New SHI-2 Inflator Gas Fill Assembly Line 139 with assoc. support equipment. Install New Helium Lea | – | [BLD2016-00935](https://nearbypermits.com/mesa/permit/BLD2016-00935/) |
| Jan 5, 2016 | Roofing | AFP/ Building 15/ area "M" Load room improvements. Add to existing Lexan barrier. Install new 3 hour door Install new 3/4 hour exit door. Add 3 hour fire shutters. Install roof mounted pressure relieve louvers. No change to fire alarm or fire sprinkler systems. | – | [BLD2016-00036](https://nearbypermits.com/mesa/permit/BLD2016-00036/) |
| Jan 5, 2016 | Electrical | AFP/ Building 15 area 'B" installation ignition unit pre-assembly install with blast chimney. Install 20 PSF rated Lexan shielding. Relocation of existing igniter sub-assembly line. Modify existing mechanical and electrical systems. | – | [BLD2016-00035](https://nearbypermits.com/mesa/permit/BLD2016-00035/) |
| Dec 29, 2015 | Addition | Expansion of the exist. Compressor shed and install additional compressor - modify exist. Mech., elect., and piping systems. The expansion of the existing building 15/area "p" hp hoffer compressor shed. Includes relocating or adding less than 10 fire sprinkler heads. | – | [BLD2015-07468](https://nearbypermits.com/mesa/permit/BLD2015-07468/) |
| Jul 23, 2015 | Electrical | AFP-Relocate existing CT scanner from B15/G to B15/I. Minor modification of existing electrical systems required | – | [BLD2015-04303](https://nearbypermits.com/mesa/permit/BLD2015-04303/) |
| Jul 23, 2015 | Electrical | AFP-Demoltion of existing conference room. Installation of 3 new modular ststems cubicles. Minor modifications of electrical system required | – | [BLD2015-04301](https://nearbypermits.com/mesa/permit/BLD2015-04301/) |
| Jul 23, 2015 | Electrical | AFP- Installation of 3 rows of 10' high storage racks to match existing. No modifications to electrical, mechanical, or plumbing systems. | – | [BLD2015-04302](https://nearbypermits.com/mesa/permit/BLD2015-04302/) |
| Jun 4, 2015 | Demolition | Demolish small building and cell tower located in the southeast portion of parcel; east of parking lot. | – | [BLD2015-03256](https://nearbypermits.com/mesa/permit/BLD2015-03256/) |
| Feb 19, 2015 | Fire systems | Replacement of fire panel in building 15-8 | – | [BLD2015-00968](https://nearbypermits.com/mesa/permit/BLD2015-00968/) |
| Jan 12, 2015 | Alteration or repair | Relocate existing environmental services operations to buildings 15-8. 16/N.s.e., dunnage bay & storage of 1.4q materials in bldg 16. F-2/h-3 occupancy / IIB construction | – | [BLD2015-00109](https://nearbypermits.com/mesa/permit/BLD2015-00109/) |
| Oct 29, 2014 | Other | AFP: Permit to close out 49 expited permits issued to the TRW plant. Bld2003-01840, bld2003-02309, bld2003-03886, bld2004-03065, bld2005-07972, bld2005-11397, bld2005-12171, bld2005-12178, bld2006-11538, bld2006-11805, bld2007-01878, bld2007-02952,bld2007-05393, bld2007-05714, bld2007-06801, bld2007 | – | [BLD2014-05683](https://nearbypermits.com/mesa/permit/BLD2014-05683/) |
| Oct 21, 2014 | Other | AFP: Create permit for closing out multiple exprired permits | – | [BLD2014-05505](https://nearbypermits.com/mesa/permit/BLD2014-05505/) |
| Apr 15, 2014 | Fire systems | Modify existing fire alarm system. Adding (2) pull stations, (1) monitor modules, (3) exp-proof heat detectors, (2) relay modules and (3) horn strobes | – | [BLD2014-01891](https://nearbypermits.com/mesa/permit/BLD2014-01891/) |
| Mar 27, 2014 | Electrical | TRW / AFP bld2007-01878-g0103 Project scope consists of the relocation of an existing "E-test" Station and the installation of a new Arc Stud Welder within the existing B15/G Manufacturing space.Existing mechanical and electrical systems will be modified to accommodate the installation.Existing haza | – | [BLD2014-01512](https://nearbypermits.com/mesa/permit/BLD2014-01512/) |
| Mar 24, 2014 | Alteration or repair | Installation of "ingiter sub-assy"line & inflator final assy" line b15/a and installatin of ingnition unit pre-assy" in b15/b2. No changes to fire sprinkler system. | – | [BLD2014-01429](https://nearbypermits.com/mesa/permit/BLD2014-01429/) |
| Jan 9, 2014 | Addition | AFP/TRW Addition of interior walls and ceiling assembly to create an equipment rooms for a CT Scanner in Building 15 Area G at TRW. Electrical and Mechanical systems to be modified/installed as designed within this permit. | – | [BLD2014-00111](https://nearbypermits.com/mesa/permit/BLD2014-00111/) |
| Oct 8, 2013 | Alteration or repair | Install new sp1-2 inflator welding stn. W/ exhaust, compressed air & elect. Power mods. And a manual load stn. Both in area b1 of bldg B ( h3/iib ) at trw site II. To include : modification of haz material quanities of both passenger and drivers assemblies. Modify operations in 15l bay#1( h1/iib ) a | – | [BLD2013-04765](https://nearbypermits.com/mesa/permit/BLD2013-04765/) |
| Sep 30, 2013 | Electrical | AFP / TRW bld2007-01878-g0101 Bldg. 15 / Area `I? ? Environmental Testing Chambers Installation. 10 new environmental testing chambers to conduct thermal testing of inflators in the existing lab area of Bldg. 15 / Area ?I?. Existing electrical systems will be modified to accommodate the installation | – | [BLD2013-04633](https://nearbypermits.com/mesa/permit/BLD2013-04633/) |
| Jul 29, 2013 | Demolition | Repair of existing cmu wall by demolition and reconstruction. All new cmu to match existing. | – | [BLD2013-03585](https://nearbypermits.com/mesa/permit/BLD2013-03585/) |
| May 16, 2013 | Fire systems | Deferred fire alarm modifications in p-bay of bldg15 at trw site II. Ref bld2012-06100. To include: new chimney heat detectors and connection to existing fire alarm system. | – | [BLD2013-02359](https://nearbypermits.com/mesa/permit/BLD2013-02359/) |
| May 16, 2013 | Alteration or repair | Relocate existing igniter sub assembly line (195) from b15/p2 to b15/q. To include:modification of elect.power and lighting. W/ reduced hazardous mat'l quantities. To include: relocate shi-2 equipment and modify elect power & relocate pnl w/disconnect. | – | [BLD2013-02343](https://nearbypermits.com/mesa/permit/BLD2013-02343/) |
| Apr 22, 2013 | Alteration or repair | Remodel bldg 15 - area c at trw site II ( h-2/b /iib ) relocating existing flexcell from bldg b14. Modify assembly line 3. To include: demo existing chiller units, pumps, piping in mech yard. ( See attached approved code modification ) | – | [BLD2013-01817](https://nearbypermits.com/mesa/permit/BLD2013-01817/) |
| Mar 26, 2013 | Mechanical (HVAC) | AFP / TRW BLD2007-01878-0100 B15/I - Water Jet Installation" project for TRW / Site II; Installation of a new "Water Jet" machine w/ support equipment in existing room "I35" for analysis of inert inflator bodies, and the installation of a new exterior equipment on a new concrete mechanical pad to su | – | [BLD2013-01315](https://nearbypermits.com/mesa/permit/BLD2013-01315/) |
| Dec 17, 2012 | Alteration or repair | Remodel 8,828 SQ FT of pre-final assembly area p1 for the installation of shi-2 final inflator assembly line#56 ( h3 IIB ) of bldg#15 at trw site II. To include: roof mtd exhaust, 5 - explosion capture/vent device w/ propellant loading chambers/hoppers, rated exterior man and access doors. Modify me | – | [BLD2012-06100](https://nearbypermits.com/mesa/permit/BLD2012-06100/) |
| Dec 5, 2012 | Fire systems | Afp - trw / afp bld2007-01878-0099 bldg. 15 / Areas 'g', 'h' & 'm' interior improvements. AREA G - Interior improvements to accommodate a records room within the existing manufacturing space, removal of 2 doors within a 3 hr. rated wall assembly and replace or infill as indicated.AREA H - Relocate t | – | [BLD2012-05946](https://nearbypermits.com/mesa/permit/BLD2012-05946/) |
| Oct 22, 2012 | Alteration or repair | Remodel a portion of the 19,391 SQ FT of existing r.o.i. Inflator assembly/gas pad for 2 new lines , the igniiter assembly line#196 and the helium leak check line#197 in area q ( f-1 / IIB ) at trw bldg 15. To include: saw cut floor, conc.lift pit, modify elect. Power and compressed air | – | [BLD2012-05247](https://nearbypermits.com/mesa/permit/BLD2012-05247/) |
| Jul 17, 2012 | Roofing | AFP - TRW # bld2007-01878-00 "Bldg. 15 / Area "D" - Inflator Assy. Room Ventilation Modifications" project for TRW / Site II. Permit includes the installation of a new roof-mounted exhaust fan above the existing 20 psf rated "Inflator Assembly Room" control area enclosure (control area #2) in the ex | – | [BLD2012-03635](https://nearbypermits.com/mesa/permit/BLD2012-03635/) |
| Jul 5, 2012 | Alteration or repair | 2,460 SQ FT Remodel of area d2 ( h2 / IIB ) of bldg 15 at trw for igniter assembly use. Increasing 1.3q propellant quanities by 11.1 lbs. To include: install 1 new wet ruwac dust removal unit to 4 hoods and overhead exh.ducts and vacuum interlock, uv process chiller. Reclassify elect. & Modify power | – | [BLD2012-03405](https://nearbypermits.com/mesa/permit/BLD2012-03405/) |
| Jun 21, 2012 | Mechanical (HVAC) | Remove existing smoke detectors from bldg. 15 Spine and replace with addressable beam smoke detectors detectors ( fsb-200s a ) single ended , reflector type at trw. | – | [BLD2012-03178](https://nearbypermits.com/mesa/permit/BLD2012-03178/) |
| Jun 21, 2012 | Mechanical (HVAC) | Modify fire alarm adding ( frm-1a & fcm-1 rel a ) ) control/relay and release modules and connect to fire shutters for new processes in m bay bldg 15 at trw. To include: wiring | – | [BLD2012-03177](https://nearbypermits.com/mesa/permit/BLD2012-03177/) |
| Mar 18, 2012 | Demolition | AFP - "Bldg. 15 Areas G & O 2007-01878-g0097 project for TRW / Site II Remodel existing men's and women's restrooms, including the installation of new plumbing fixtures, permit includes the renovation of existing office spaces and interior renovations; to include the removal of partition walls and d | – | [BLD2012-01310](https://nearbypermits.com/mesa/permit/BLD2012-01310/) |
| Feb 22, 2012 | Alteration or repair | Code modification to use blast pressure resistant construction in place of separate bldg where quantites of hazardous materials exceed the maximum allowable quantities. | – | [BLD2012-00839](https://nearbypermits.com/mesa/permit/BLD2012-00839/) |
| Feb 22, 2012 | Alteration or repair | Code modification to allow div 1.3 materials stored of used in bldg in quantities exceeding the maximum allowable quantity per control area as indicated in table 307.7(1) 2006 ibc | – | [BLD2012-00836](https://nearbypermits.com/mesa/permit/BLD2012-00836/) |
| Feb 22, 2012 | Alteration or repair | 13,451 SQ FT Remodel and change of occupancy of 15m for install di-10 propellant transfer/load and inflator assembly operations and associated supt equipment in bldg 15 ( h2 IIB ) at trw site II. To include: change of occ. H3 to h2, 4hr firewall w/ 3hr doors, 3hr exterior wall, blast chimney's, roof | – | [BLD2012-00835](https://nearbypermits.com/mesa/permit/BLD2012-00835/) |
| Jan 9, 2012 | Mechanical (HVAC) | Code modification for bld2012-00054 to add indoor and mobile day boxes area p2 bldg-15 at trw site II | – | [BLD2012-00095](https://nearbypermits.com/mesa/permit/BLD2012-00095/) |
| Jan 5, 2012 | Mechanical (HVAC) | Add new compartmentalized fixed daybox & new mobile daybox in area p2 at trw bldg. 15 At site II. To include: new wall mtd. Barometric relief louver. See approved code modification bld2012-00095 | – | [BLD2012-00054](https://nearbypermits.com/mesa/permit/BLD2012-00054/) |
| Dec 6, 2011 | Electrical | AFP - TRW / AFP bld2007-01878-g0096 Bldg.15 / Area 'Q' - SHI-2 Gas Fill Line Installation . Relocation of existing inflator body Assembly lines / equipment to south end of assembly bay. Installation of a new x-ray machine in north end of assembly bay. Installation of a new shi-2 inflator gas fill as | – | [BLD2011-05038](https://nearbypermits.com/mesa/permit/BLD2011-05038/) |
| Nov 14, 2011 | Alteration or repair | Relocate exist. Magazine 15p-1 to a new conc. Pedestal/foundation north of bldg. 15/M1 & 15/p adjacent to mag 15m-1 at trw site II. Ref permit bld2010-02323 and addenda 2 code study and code modifications for shi-2 line | – | [BLD2011-04666](https://nearbypermits.com/mesa/permit/BLD2011-04666/) |
| Nov 9, 2011 | Addition | AFP - TRW / AFP bld2007-01878-0093 (2of 2).1) The addition of a new 10'-0"w x 40'-0" conc. pad for storing inert items. 2) Remove & replace existing high piled storage racks in the north area (Exist. MRO Storage) of Bldg. 3. 3) Remove & replace existing hi-bay light fixtures in the north area (Exist | – | [BLD2011-04616](https://nearbypermits.com/mesa/permit/BLD2011-04616/) |
| Nov 9, 2011 | Demolition | Afp - trw / afp bld2007-01878-0092 bldg. 15 / Area 'Q. Demolition of existing assembly equipment, associated support equipment, associated mechanical and electrical services located in Bldg. 15 / Area 'Q'. Exist. Fire alarm / sprinkler systems will remain unchanged, intact and active during the enti | – | [BLD2011-04615](https://nearbypermits.com/mesa/permit/BLD2011-04615/) |
| Oct 27, 2011 | Alteration or repair | Transfer storing/staging operations at trw site II bldg 15, from mag 15/d 10 & 11 to mag 15/d 20 increasing div 1.3 quantities by 50 lbs for a new combined total of 76.4 lbs at the 15/d mag complex. See case notes for fee calculations. | – | [BLD2011-04464](https://nearbypermits.com/mesa/permit/BLD2011-04464/) |
| Oct 10, 2011 | Electrical | AFP - Bldg. 15 / Area 'I' - Module and Chemistry Lab Expansion" Project" for TRW / Site II.The scope of this submittal is meant to document field changes / modifications made during the construction phase of the "Bldg. 15 / Area 'I' - Module and Chemistry Lab Expansion" Project (C.O.M. #bld2010-0334 | – | [BLD2011-04168](https://nearbypermits.com/mesa/permit/BLD2011-04168/) |
| Aug 15, 2011 | Alteration or repair | Remodel area 15/d ( h2/h3 / IIB ) at trw/vssi site II. To include: demo of existing sub. Assembly line, and istallation of relocated flekcell lines from 15/a and install supervisor's office. Modify elect. Power / svcs.& lighting, compessed air and piping. Note: 1.4q are increased by 14.6lbs | – | [BLD2011-03333](https://nearbypermits.com/mesa/permit/BLD2011-03333/) |
| Feb 7, 2011 | Electrical | Afp - trw / afp bld2007-01878-0091. Project scope consists of the installation of a new x-ray machine and assoc. support equipment to support existing production operations in the bay; floor mounted steel guardrails will also be installed to protect the new equipment from floor traffic. Existing mec | – | [BLD2011-00519](https://nearbypermits.com/mesa/permit/BLD2011-00519/) |
| Feb 7, 2011 | Demolition | Afp - trw / afp bld2007-01878-0092. Project consists of the demolition of all exist. process and assembly equipment, associated support equipment, associated mechanical and electrical services located in Bldg. 15 / Area 'M', and the removal of the exist. hydrogen tanks on the Bldg. 15 / Area 'P' Gas | – | [BLD2011-00505](https://nearbypermits.com/mesa/permit/BLD2011-00505/) |
| Feb 2, 2011 | Fire systems | AFP bld2007-01878-0090 - Project scope consists of removing the existing high-speed deluge nozzle and infrared fire detection (IFD) sensor located inside the existing SHI blast chimney in Bldg. 15/A. This will serve to avoid accidental deluge discharges that may hinder production. Existing fire spri | – | [BLD2011-00450](https://nearbypermits.com/mesa/permit/BLD2011-00450/) |
| Dec 2, 2010 | Addition | Install 10 FT high workstation protection lexan enclosures around 2 existing ( guni 75 ) propellant dosing/loading stations 592 SQ FT & install 2 new separation valves on the existing overhead propellant conveying piping at bld 15-c ( h2 / IIB ) at trw site II. See case notes for additional fees. | – | [BLD2010-05124](https://nearbypermits.com/mesa/permit/BLD2010-05124/) |
| Oct 18, 2010 | Alteration or repair | Code mod. To install a protective enclosure ( indoor vent chamber )to isolate div. 1.3 Propellant in open use and increase quanties of propellant in bay "a" of bldg 15 in lieu of detatched storage. Ref bld2010-04441 for remodel to area "a" in bldg 15 | – | [BLD2010-04468](https://nearbypermits.com/mesa/permit/BLD2010-04468/) |
| Oct 14, 2010 | Alteration or repair | Expedited: 11,266 SQ FT remodel of bldg. 15 "A" site II ( h3/h4 IIB ) to modify the existing assembly line for vpa ignition canister/ cell 2 bowl feeder for the ppi-3 inflator. To include vpa loading chamber. No m/p/e modifications. Ref bld2010-04468 for code mod. | – | [BLD2010-04441](https://nearbypermits.com/mesa/permit/BLD2010-04441/) |
| Aug 9, 2010 | Addition | Addenda to bld2010-o2323. Change construction of new compressor shed from site built to pre-engineered metal building. No change in building area or MP&E. | – | [BLD2010-03474](https://nearbypermits.com/mesa/permit/BLD2010-03474/) |
| Jul 29, 2010 | Alteration or repair | Remodel and expand existing production test lab facility. Work includes removing existing waste tank from open underground concrete pit under existing building roof line, filling pit and capping with slab matching existing floor level. Removing existing exterior wall panels and open storage area scr | – | [BLD2010-03346](https://nearbypermits.com/mesa/permit/BLD2010-03346/) |
| Jul 13, 2010 | Fire systems | AFP - "Bldg.15 / Area 'K' - Shipping / Receiving Relocation" project for TRW / Site II. 1. Relocation of the existing Flange Weld lines and assoc. support equipment from Bldg. 15/K to Bldg. 15/D. 2. Relocate the existing Raw / Finished Goods Staging from Bldg. 15/K to Bldg. 15/D. 3. Install rack sto | – | [BLD2010-03041](https://nearbypermits.com/mesa/permit/BLD2010-03041/) |
| May 27, 2010 | Addition | Code mod #3, ref. BLD2010-02323 - TRW AM&M A15P.O3 - APPROVED - Code Modification is to use a specially designed mobile daybox to bring explosive material into the final assembly line in Area P-2. The daybox is composed of 5 separate compartments designed to contain 11 lbs (5 Kg) of 1.3 explosive ma | – | [BLD2010-02399](https://nearbypermits.com/mesa/permit/BLD2010-02399/) |
| May 27, 2010 | Addition | Code mod #2, ref. BLD2010-02323 - TRW AM&M A15P.O2 - APPROVED - Code Modification is to use "INTERCEPTOR-QR" indoor explosion venting system to comply with the explosion control provisions of IBC Section and Table 414.5.1. The CV Technology "INTERCEPTOR-QR" indoor explosion venting system is FM appr | – | [BLD2010-02398](https://nearbypermits.com/mesa/permit/BLD2010-02398/) |
| May 27, 2010 | Addition | Code mod #1, ref. BLD2010-02323 - TRW AM&M A15P.O1 - APPROVED - Code Modification is to use blast/pressure resistant construction in place of a separate building as required per IBC Table 415.3.2. Structural design and venting based on SMS report SMS-2352-L1 using the test results for the "INTERCEPT | – | [BLD2010-02396](https://nearbypermits.com/mesa/permit/BLD2010-02396/) |
| May 24, 2010 | Addition | Code study; including 3 code modifications (see below), remodel and addition to existing building for installation of shi-2 inflator assembly line. Remodel existing 13,391 sq. ft. building and construct 1,008 sq. ft. addition. Existing building will be divided into H-2 and H-3 occupancies at existin | – | [BLD2010-02323](https://nearbypermits.com/mesa/permit/BLD2010-02323/) |
| Mar 7, 2010 | New building | New acoustical enclosure around existing technician's cubicles inside existing Bldg. 16 / 'C1'.Existing Mechanical and Electrical services already in place will be modified to accommodate the new room. | – | [BLD2010-00958](https://nearbypermits.com/mesa/permit/BLD2010-00958/) |
| Mar 1, 2010 | Electrical | Project scope consists of the construction of a new acoustical enclosure around existing technician's cubicles inside existing Bldg. 16 / 'C1'.Existing Mechanical and Electrical services already in place will be modified to accommodate the new room. | – | [BLD2010-00853](https://nearbypermits.com/mesa/permit/BLD2010-00853/) |
| Feb 23, 2010 | Other | AFP - Relocate cubes from the production floor to the mezzanine to free up some space in the bay. | – | [BLD2010-00764](https://nearbypermits.com/mesa/permit/BLD2010-00764/) |
| Feb 15, 2010 | Alteration or repair | AFP / TRW bld2007-01878-0087- Relocation of the existing manual "Diffuser Load Station" and installation of an automated "Diffuser Load Station" on Lines #2 & #3 of the DI-9 Inflator lines to support existing inflator assembly operations. The existing manual "Diffuser Load Station" will be renumbere | – | [BLD2010-00610](https://nearbypermits.com/mesa/permit/BLD2010-00610/) |
| Feb 15, 2010 | Electrical | TRW / AFP bld2007-01878-0086 - Relocation and installation of existing assembly equipment used for inert inflator assembly operations from Bldg. 50 into "Bldg. 15 / Area 'B' General Assembly Area".Existing hazardous material quantities will not be increased from those previously permitted under COM  | – | [BLD2010-00608](https://nearbypermits.com/mesa/permit/BLD2010-00608/) |
| Dec 8, 2009 | Mechanical (HVAC) | Modification of exist fire alarm system and devices. Ref bld2009-04399 | – | [BLD2009-05461](https://nearbypermits.com/mesa/permit/BLD2009-05461/) |
| Nov 5, 2009 | Alteration or repair | Addenda (delta 3 )to orig. Permit 2009-04399 & code study to substitute a prefabricated 60 x 72 gravity relief ventilator unit w/ backdraft damper for the exhaust penthouse structure at 15c, also included is the removal of exist fire dampers in cmu wall. Modify high speed doors at conveyor and light | – | [BLD2009-04951](https://nearbypermits.com/mesa/permit/BLD2009-04951/) |
| Oct 6, 2009 | Alteration or repair | Code study & relocation of ppi-3 assembly line w/ assoc support equipment from bldg to 17 to bldg 15c for filter & inflator assembly / guni-65/75 propellant staging/load /transfer & tech office uses at site II, 11,018 SQ FT remodel & changing occupancy from h3 to h2. Modifications include structural | – | [BLD2009-04399](https://nearbypermits.com/mesa/permit/BLD2009-04399/) |
| Sep 8, 2009 | Alteration or repair | Code mode ref. BLD2009-03828. Modify indoor magazine use of mobile daybox and quanities per sms report #0653-r1 | – | [BLD2009-03989](https://nearbypermits.com/mesa/permit/BLD2009-03989/) |
| Sep 8, 2009 | Alteration or repair | Code mod ref. BLD2009-03828. To use exisitng 20lbs per SQ FT wall and roof construction per sms report #2028-r1 | – | [BLD2009-03988](https://nearbypermits.com/mesa/permit/BLD2009-03988/) |
| Aug 31, 2009 | Alteration or repair | Relocate service & prototype propellant loading operations to bay 1 & 3 and protype teardown operations to bay 2 in bldg 15-l a seperate bldg. At trw site II per consolidation. ( H-1 / IIB ) to include 3000 SQ FT interior demo - remodel & improvements for process/test equipment. Modify elect. Power  | – | [BLD2009-03828](https://nearbypermits.com/mesa/permit/BLD2009-03828/) |
| Aug 5, 2009 | Alteration or repair | Afp - trw/afp2007-0187-0085. Interior improvements to accomodate an office area within an existing mfg space. Existing process equipment will be relocated from around the site to the "g" bay and partitions to be constructed for the office area. | – | [BLD2009-03476](https://nearbypermits.com/mesa/permit/BLD2009-03476/) |
| Jul 8, 2009 | Alteration or repair | 12,324 SQ FT Remodel/relocation of exist. Di-9 igniter sub-assembly line #2 & associated supt equipment from bld 38 to bld 15d ( areas d2 & d3) at trw site II. ( H2/h3 IIB ), seperated use. To include , 3 blast chimney's/stacks, infill doors, lexan enclosure, remodel scrap rm to confrence rm. ( B/ii | – | [BLD2009-03072](https://nearbypermits.com/mesa/permit/BLD2009-03072/) |
| May 19, 2009 | Alteration or repair | AFP - Questions contact Terri Wood @ 480-644-4542. Trw/afp bld2007-01878-g0084. Remodel of plant managers area. | – | [BLD2009-02287](https://nearbypermits.com/mesa/permit/BLD2009-02287/) |
| May 4, 2009 | Alteration or repair | Install 125 gal vertical above ground propane tank & provide connection to relocated 30k btu burner in cherokee bay 6 at bldg. 15 ( I ) at trw site II. Burner to be installed per manuf. Instructions | – | [BLD2009-01987](https://nearbypermits.com/mesa/permit/BLD2009-01987/) |
| Mar 31, 2009 | Electrical | AFP -Questions contact Terri Wood @ 480-644-4542.TRW / AFP2007-01878-g0083 (2 of 2) Modifications to existing assembly lines #3 & #4 in Bldg. 17.Existing Mechanical and Electrical services will be modified to accommodate the equipment installation. | – | [BLD2009-01400](https://nearbypermits.com/mesa/permit/BLD2009-01400/) |
| Mar 31, 2009 | Electrical | AFP -Questions contact Terri Wood @ 480-644-4542.TRW / AFP2007-01878-g0083 (1 of 2) Modifications to existing assembly lines #3 & #4 in Bldg. 17.Existing Mechanical and Electrical services will be modified to accommodate the equipment installation. | – | [BLD2009-01399](https://nearbypermits.com/mesa/permit/BLD2009-01399/) |
| Mar 31, 2009 | Electrical | AFP - Questions contact Terri Wood @ 480-644-4542. Trw / afp bld2007-01878-g0082 2 of 2. Relocating existing lab and manufacturing equipment from Bld 50 to Bld 15 / Area I. Existing hazardous material quantities will not be increased from those previously permitted. Existing mechanical and electrica | – | [BLD2009-01398](https://nearbypermits.com/mesa/permit/BLD2009-01398/) |
| Mar 19, 2009 | Electrical | AFP - Questions contact Terri Wood @ 480-644-4542. Trw / afp bld2007-01878-g0082 1 of 2. Relocating existing lab and manufacturing equipment from Bld 50 to Bld 15 / Area I. Existing hazardous material quantities will not be increased from those previously permitted. Existing mechanical and electrica | – | [BLD2009-01212](https://nearbypermits.com/mesa/permit/BLD2009-01212/) |
| Mar 12, 2009 | Fire systems | AFP - Questions contact Terri Wood @ 480-644-4542. Trw / afp bld2007-01878-00080. Relocation of existing admin operations from bld 2 to the newly redesignated office area of Bld 15 AREA C. All assemby operations were terminated and equipment in BLD 15 / AREA C was removed under BLD2008-00981. BLD 15 | – | [BLD2009-01100](https://nearbypermits.com/mesa/permit/BLD2009-01100/) |
| Mar 12, 2009 | Alteration or repair | Annual Facilities Permit - Questions contact Terri Wood 6444542 TRW / AFP bld2007-01878-00080 Relocation of existing open & hard wall office space & conference room from Bldg. 2 to the south end of Bldg. | – | [BLD2009-01087](https://nearbypermits.com/mesa/permit/BLD2009-01087/) |
| Feb 4, 2009 | Other | Annual Facilities Permit TRW /AFP bld2007-01878-0079 Relocation of an exist. egress stair, an exist. fill port welder and an exist. compressed air filter rack; and the installation of a new helium leak check station, a new ?Igniter Stake? station, and 4 new cubicles workstations for area technicians | – | [BLD2009-00537](https://nearbypermits.com/mesa/permit/BLD2009-00537/) |
| Jan 8, 2009 | Alteration or repair | 1.Removing the existing assembly lines in Bldg. 15/K. 2.Relocation of the existing Flange Weld Lines and assoc. support equip. from Bldg. 15/D to Bldg. 15/K. 3.Relocating the existing ?Raw / Finished Goods? staging from Bldg. 15/G to Bldg. 15/K .4.Remove and replace the existing ?E-Test? machines in | – | [BLD2009-00069](https://nearbypermits.com/mesa/permit/BLD2009-00069/) |
| Dec 12, 2008 | Alteration or repair | Relocate the d1-9 inflator line & support equipment from bldg 38 to bldg 15/d, includes 4 code modifications, see attached in documents. | – | [BLD2008-10884](https://nearbypermits.com/mesa/permit/BLD2008-10884/) |
| Nov 19, 2008 | Electrical | Annual Facilities Permit Questions contact Carl White (6443588)TRW / AFP No. bldg2007-01878-g0077 Project scope consists of modifying the existing DI-9 / Line #3 assembly line in Bldg. 15/D by extending the existing conveyor line, removing and replacing an existing laser with a new laser unit, and r | – | [BLD2008-10392](https://nearbypermits.com/mesa/permit/BLD2008-10392/) |
| Oct 24, 2008 | Other | Assembly operations for flexcell lines utilizing energetic materials. Increasing hazardous material division 1.4 explosives. Equipment installed under permit 2008-09659 | – | [BLD2008-09729](https://nearbypermits.com/mesa/permit/BLD2008-09729/) |
| Oct 22, 2008 | Alteration or repair | Annual Facilities Permit -- Question contact Carl White 6443588.The project scope consists of relocating Flexcell lines 1 & 2 from Bldg .17, and Flexcell lines 3 & 4 from Bldg. 15 / Area ?D? to the Assembly Area of Bldg. 15 / Area ?A?. This permit is phase II of a existing permit (2004-07311). | – | [BLD2008-09659](https://nearbypermits.com/mesa/permit/BLD2008-09659/) |
| Oct 6, 2008 | Other | Annual Facilities Permit -- Questions contact Carl White 6443588. Bldg 15 / Area B2 Service Bay | – | [BLD2008-09131](https://nearbypermits.com/mesa/permit/BLD2008-09131/) |
| Aug 25, 2008 | Other | Install of stud welder in warehouse area of bld # 50/fees based on # of inspections | – | [BLD2008-07985](https://nearbypermits.com/mesa/permit/BLD2008-07985/) |
| Aug 12, 2008 | Mechanical (HVAC) | Afp- scope includes interior improvements to existing admin blding to include demo of extisting walls and ceilings to accomodate newc training rms, computer lab, and health services area. Existing HVAC and elect to be modified/ fees based on # of inspections | – | [BLD2008-07557](https://nearbypermits.com/mesa/permit/BLD2008-07557/) |
| Jul 31, 2008 | Alteration or repair | Afp- bld # 15/ area 1/ scope is remodel of existing process equipment rm to mro rm/ fees based on # of inspections/ contact carl white @ 3588 with questions | – | [BLD2008-07285](https://nearbypermits.com/mesa/permit/BLD2008-07285/) |
| Jul 23, 2008 | Other | Work order # 2086 /friction welder installation/fees based on # of inspections | – | [BLD2008-07064](https://nearbypermits.com/mesa/permit/BLD2008-07064/) |
| Jul 14, 2008 | Other | Service reconfiguration /scope of phase 1 is the reinstallation of laser weld equipment/fees based on # of inspections | – | [BLD2008-06837](https://nearbypermits.com/mesa/permit/BLD2008-06837/) |
| May 15, 2008 | Addition | REF: BLD2008-04723 -- Approved Code Modification to allow the amount of 1.3 explosives in Building 15 Area C load room exceed the maximum permitted per IBC TABLE 307.1(1) and to use "Blast Resistant" construction in place of a detached building as required per IBC TABLE 415.3.2. Approved based on SM | – | [BLD2008-05102](https://nearbypermits.com/mesa/permit/BLD2008-05102/) |
| May 6, 2008 | Addition | Remodel with new construction of an existing building for the installation of PPI3 production line. Includes Code Study and Code Modification (REF BLD2008-05102). See Case Notes for complete scope of work. REF BLD2008-00981 for demo work. -- Applicant has elected to defer the following fire protecti | – | [BLD2008-04723](https://nearbypermits.com/mesa/permit/BLD2008-04723/) |
| Apr 24, 2008 | Electrical | this project scope consists of installing a new concrete pad for a new elect ses, transformer and switch; terminating the existing elect service to blds 15-5 and 15-8 and reconnect to new ses/ done under afp program /to be billed per hour | – | [BLD2008-04373](https://nearbypermits.com/mesa/permit/BLD2008-04373/) |
| Apr 8, 2008 | Electrical | Bldg. 15 AREA D The project scope consists of: Reorienting the existing Flexcell Assembly Line. Installing a new Flexcell Assembly Line just south of the exist Flexcell inside the general assembly of bldg. 15 area D. The existing mechanical and electrical system will be modified to accommodate the e | – | [BLD2008-03715](https://nearbypermits.com/mesa/permit/BLD2008-03715/) |
| Apr 8, 2008 | Alteration or repair | The project consist of the installation of automated propellant loading equipment to replace the existing manual propellant loading operation in BLDG. 15/ Area A and the expansion of the existing lexan barrier. Existing elctrical systems will be modified to accomadate the equipment. | – | [BLD2008-03701](https://nearbypermits.com/mesa/permit/BLD2008-03701/) |
| Feb 28, 2008 | Electrical | The project scope consist of the installation of 2 new automated "shorting clip" bowl feeder stations to replace an existing manual-feed operation on the existing assembly line inside bay "M2" of bldg 15/area "M". Existing mechanical and electrical systems will be modified to accommodate the equipme | – | [BLD2008-02169](https://nearbypermits.com/mesa/permit/BLD2008-02169/) |
| Jan 30, 2008 | Alteration or repair | This is a combination of two projects G0062 area B and G0063 area C The project consists of the demo of all existing process and assembly equipment associated support equipment, mech. services, located in the inflator assembly room of bldg 15 area B. and the demo of the entire north portion of bldg  | – | [BLD2008-00981](https://nearbypermits.com/mesa/permit/BLD2008-00981/) |
| Jan 24, 2008 | Grading | The project scope entails providing independent on-site grading and drainage and retention resulting from previously approved lot split and conditional uses permit (Zoning case #203-22). | – | [BLD2008-00761](https://nearbypermits.com/mesa/permit/BLD2008-00761/) |
| Jan 10, 2008 | Other | Afp - any questions regarding this permit contact chris hester x4506 or patrick ott x5093. Generator installation for building #4 | – | [BLD2008-00306](https://nearbypermits.com/mesa/permit/BLD2008-00306/) |
| Nov 8, 2007 | Roofing | Bldg. 50 Glamtronics Welder Installation- The project scope entails the installation a glamtronics welder in the main assembly bay of Bldg. 50, and an exsiting roof-mounted exhaust fan will be removed and replaced with a new velocity exhuast fan to vent the weld Fumes. Existing mechanical and electr | – | [BLD2007-11342](https://nearbypermits.com/mesa/permit/BLD2007-11342/) |
| Nov 2, 2007 | Electrical | Bldg. 15/ Area J- Compressor Exchange. The project scope entails the removal and replacement of an existing air compressor with a new compressor in the "Existing Room" of bldg. 15/ Area J. The existing mechanical and electrical system will be modified to accommodate the equipment. | – | [BLD2007-11147](https://nearbypermits.com/mesa/permit/BLD2007-11147/) |
| Nov 2, 2007 | Electrical | Bldg. 2 Area Chiller Replacement. The project scope entails the installation of a new HVAC chiller unit in the north mechanical yard of Bldg. 2. Exsitng mechanical and electrical systems will be modified to accommodate the equipment. | – | [BLD2007-11140](https://nearbypermits.com/mesa/permit/BLD2007-11140/) |
| Oct 24, 2007 | Electrical | Bldg. 50 Stud Welder Installation. The project scope entails the installation of a new stud welder on the main assembly floor of Bldg 50. The existing electrical system will be modified to accommodate the equipment. | – | [BLD2007-10792](https://nearbypermits.com/mesa/permit/BLD2007-10792/) |
| Oct 3, 2007 | Electrical | Bldg. 15 Area "I" - "Liebert A/C Installation". The project scope entails the installation of a portable a/c unit in the office/ support area of Bldg. 15/Area "I". The existing mechanical and electrical system will be modified to accommodate the equipment | – | [BLD2007-10058](https://nearbypermits.com/mesa/permit/BLD2007-10058/) |
| Sep 18, 2007 | Demolition | Bldg. 17 - GMF "16 Lane Cutter Demolition". The scope of work consist of the demolition of the existing "16 Lane Cutter" in the exit cutter room", high-pressure pump in the hydraulic room, and any associated control equipment in the exit support/control of bldg 17. Existing deluge fire sprinkler pip | – | [BLD2007-09552](https://nearbypermits.com/mesa/permit/BLD2007-09552/) |
| Sep 5, 2007 | Alteration or repair | Bldg. 2 / Admin Executive Office Remodle. The work entials remodel of the existing office area of bldg. 2 that includes reconfiguration of partions, power and diffuser loacations. The work order for the project is 2086. The AFP project # is AFP- 00038 and the expiration date is 12/6/07 | – | [BLD2007-09164](https://nearbypermits.com/mesa/permit/BLD2007-09164/) |
| Aug 17, 2007 | Electrical | Bldg. 15 Area "M" - "Friction Welder". The project scope entails the installation of a friction welder previously permitted under permit bld2004-08424 but never installed in the general assembly area Bldg. 15M to support existing assembly operations. The friction welder will be connected to existing | – | [BLD2007-08563](https://nearbypermits.com/mesa/permit/BLD2007-08563/) |
| Aug 16, 2007 | Roofing | BLDG 15/ Area "Q" Burst Disk Welder Installation. The project scope entails the installation of a new Burst Disk Welder" with associated support equipment (control panel, chiller unit on the roof-mtd. exhaust fans) in bldg. 15/ area Q to support existing inflator assembly operations. Welding operati | – | [BLD2007-08505](https://nearbypermits.com/mesa/permit/BLD2007-08505/) |
| Jun 29, 2007 | Alteration or repair | Bldg. 15 AREA "C" LOAD ROOM RECONFIGURATION The project consists of removal of 2 existing weld lines and associated support equipment and the installation of a new igniter termination station in the existing load room of bldg. 15 Area "C" to support existing inflator assembly operations. The existin | – | [BLD2007-06802](https://nearbypermits.com/mesa/permit/BLD2007-06802/) |
| Jun 29, 2007 | Alteration or repair | BLDG.17 -GMF PPI-3 LINE MODIFICATION The project consist of the modification of existing #3 filter tube sub-assembly line in the existing assembly room of bldg. 17 to support the existing PPI-3 inflator assembly operations. Existing mech. and elec. utilities will be modified to accommodate the equip | – | [BLD2007-06801](https://nearbypermits.com/mesa/permit/BLD2007-06801/) |
| Jun 1, 2007 | Demolition | Bldg. 51 Storage Rack Demolition. The project entails the removal of the existing high-piled storage racks in the existing warehouse area of Bldg. 51. The exisiting high piled fire sprinkler piping shall be removed to it's highest point and be terminated with a valve. The work order fir this project | – | [BLD2007-05714](https://nearbypermits.com/mesa/permit/BLD2007-05714/) |
| May 23, 2007 | Electrical | Bldg. 15 / Area "Q" Helium Booster Pump. The project scope entails the installation of 2 helium booster pumps with a chainlink shade structure on the existing concrete mechanical pad east of Bldg. 15 / Area "Q". Existing mechanical, compressed air/gas systems, piping distribution and electrical syst | – | [BLD2007-05393](https://nearbypermits.com/mesa/permit/BLD2007-05393/) |
| May 1, 2007 | Other | Code study lot split code summary. Verification of new allowable quantity distance for explosive storage based on new east property line resulting from lot split. | – | [BLD2007-04498](https://nearbypermits.com/mesa/permit/BLD2007-04498/) |
| Mar 27, 2007 | Other | BLDG 15 / Area M Equipment Installation. The work order for the project is 2086. The AFP project # is AFP- 00038 and the expiration date is 12/6/07 | – | [BLD2007-02952](https://nearbypermits.com/mesa/permit/BLD2007-02952/) |
| Feb 2, 2007 | Roofing | Production line changes. Remove existing module assembly line and install ROI Inflator line #7. Disconnect existing utilities and reuse for new line. Install new fume exhaust system with hoods, ductwork and new 160 lb. exhaust fan on roof. No changes to exist f/a or f/s systems. | – | [BLD2007-01083](https://nearbypermits.com/mesa/permit/BLD2007-01083/) |
| Dec 7, 2006 | Other | Bldg. 15 - Area "Q" Pencil tank Installation. The work order # for this project is 2086. The AFP project # is AFP-00038 and the expiration 12/6/07. | – | [BLD2006-11538](https://nearbypermits.com/mesa/permit/BLD2006-11538/) |
| Nov 1, 2005 | Addition | Assembly line change out only, no change in use, occupancy or occupant load. Remove three obsolete inflator assembly lines and replace with one new inflator assembly line (ROI #6). New assembly line to utilize existing electrical and process piping from lines removed. Install new rooftop exhaust fan | – | [BLD2005-11397](https://nearbypermits.com/mesa/permit/BLD2005-11397/) |
| Oct 24, 2005 | Other | Annual facilities permit-above address is main site. Remote site located at 4051 N higley rd. Effective 11/4/05-11/4/06 | – | [BLD2005-11096](https://nearbypermits.com/mesa/permit/BLD2005-11096/) |
| Oct 26, 2004 | Other | Annual facilities permit-above address is main site. Remote site located at 4051 N higley rd. Effective 11/04/2004-11/04/2005. | – | [BLD2004-08450](https://nearbypermits.com/mesa/permit/BLD2004-08450/) |
| Sep 22, 2004 | Other | After hours inspection | – | [BLD2004-07575](https://nearbypermits.com/mesa/permit/BLD2004-07575/) |
| Sep 13, 2004 | Addition | Relocate welding equipment from bldg 15 area m to a. Increase 1.4 explosives in a area by 28.6 lbs for a total of 62.71 lbs. Relocate lova loading to existing operating bay #4 in building 38 no change in explosive amounts of lova load in building 38. | – | [BLD2004-07311](https://nearbypermits.com/mesa/permit/BLD2004-07311/) |
| Aug 24, 2004 | Alteration or repair | Code study for the use of guni azm 327 propellant in production within existing bays and equipment. | – | [BLD2004-06855](https://nearbypermits.com/mesa/permit/BLD2004-06855/) |
| Jun 18, 2004 | Addition | C tucker - remove existing module assembly lines to make room in north end of area "n" to install "roi" assembly line. Work includes modifying/relocating electrical. Plumbing and mechanical connections to existing lines and adding electrical, plumbing, high pressure process gas and mechanical hook u | – | [BLD2004-05115](https://nearbypermits.com/mesa/permit/BLD2004-05115/) |
| May 28, 2004 | Other | Trw vssi mesa - code study for using guni azm-327 in bldg 15 area d. Amount in use outside of chimneys is below the maximum allowable quantities. | – | [BLD2004-04512](https://nearbypermits.com/mesa/permit/BLD2004-04512/) |
| Apr 13, 2004 | Addition | Install additional laser chiller and revise allowable area calcs. Install 3rd chiller and tie into existing laser chilled water loop. Install new breakes in dsp and install conduit and wire to chiller. Revise overall building area calculations by deviding building 17-1 into 17-1 and 17-3 at concrete | – | [BLD2004-03065](https://nearbypermits.com/mesa/permit/BLD2004-03065/) |
| Mar 10, 2004 | Alteration or repair | Code study to increase existing amounts of hazardous materials in dayboxes for production. Dayboxes(magazines) are associated with building 38. | – | [BLD2004-01984](https://nearbypermits.com/mesa/permit/BLD2004-01984/) |
| Dec 10, 2003 | Alteration or repair | Referance prj2003-00071 - code study for bld2003-01840: installation of hybrid gas inflator assembly line in bays 4 and 5 of existing building 50. | – | [BLD2003-04457](https://nearbypermits.com/mesa/permit/BLD2003-04457/) |
| Dec 10, 2003 | Other | Code study for bld2003-03886, ref prj2003-00070 | – | [BLD2003-04452](https://nearbypermits.com/mesa/permit/BLD2003-04452/) |
| Nov 20, 2003 | Addition | Prj2003-00070 - relocation of drivers side canister igniter loading di-1/di-2 operation sqft. From site 1 to bldg.15 "b" generate load room, 2,348 sqft. For trw vehicle safety.to include code study and architectural ,plumb/process piping,elect., and fire sys. Modifications adding h2 occupancy to exi | – | [BLD2003-03886](https://nearbypermits.com/mesa/permit/BLD2003-03886/) |
| Nov 3, 2003 | Other | Annual facilities permit - main site | – | [BLD2003-03359](https://nearbypermits.com/mesa/permit/BLD2003-03359/) |
| Oct 8, 2003 | Alteration or repair | Install pole mtd, light fixture near mag. 17A. Connect to existing light circuit | – | [BLD2003-02755](https://nearbypermits.com/mesa/permit/BLD2003-02755/) |
| Sep 19, 2003 | Demolition | Selective equipment demolition/removal -- demo permit only -- note: existing fire alarm and fire protection systems to be protected and remain operational during work. -- Work consists of the removal of all wet scrubber systems and associated ductwork and utilities from building's #16 and #32. -- Wo | – | [BLD2003-02309](https://nearbypermits.com/mesa/permit/BLD2003-02309/) |
| Sep 2, 2003 | Addition | Referance prj2003-00071 & code study bld2003-04457 - project includes the installation of hybrid gas inflator assembly line in bays 4 and 5 of existing building 50. Work includes installation of hydrogen gas system with storage, distribution and leak detection system, new roof top exhaust fan, two a | – | [BLD2003-01840](https://nearbypermits.com/mesa/permit/BLD2003-01840/) |
| Jul 31, 2003 | Alteration or repair | Relocate ball mill, oven, glove box and scale for propellant test preperation from building 16-h (test lab) to room 147 building 55-1 | – | [BLD2003-00883](https://nearbypermits.com/mesa/permit/BLD2003-00883/) |
| Jul 3, 2003 | Alteration or repair | Relocate stud welder from area "g" to area "a" with all associated utilities. existing div.1.4 hazardous material quantities previously permitted #233287 will be increased by 0.013 lbs. for a new total of 34.123 lbs. | – | [BLD2003-00053](https://nearbypermits.com/mesa/permit/BLD2003-00053/) |

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb). Checked 2026-10-02 03:21 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/