# Building permits at 1344 E Grove Cir, Mesa, AZ

One permit on record here. The newest, Apr 24, 2025: Residential Electrical Repair Like for Like-no plans required. Within a quarter mile, the city has issued 5 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Apr 24, 2025 | Electrical | Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific | Not listed | [PMT25-07439](https://nearbypermits.com/mesa/permit/PMT25-07439/) |

## Within ¼ mi since May 1, 2026

5 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 3 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 23, 2026 | [1451 E Garnet Ave](https://nearbypermits.com/mesa/address/1451-e-garnet-ave/) | 690 ft NE | Alteration or repair | Push Pier Installation | Not listed | [PMT26-17161](https://nearbypermits.com/mesa/permit/PMT26-17161/) |
| Jul 6, 2026 | [1446 E Harmony Ave](https://nearbypermits.com/mesa/address/1446-e-harmony-ave/) | 690 ft SE | Electrical | Permit is only for the installation of one tesla powerwall3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedu | Not listed | [PMT26-12297](https://nearbypermits.com/mesa/permit/PMT26-12297/) |
| Jun 11, 2026 | [1348 E Gable Cir](https://nearbypermits.com/mesa/address/1348-e-gable-cir/) | 850 ft N | Addition | Construction of additional living space. | Not listed | [PMT26-10991](https://nearbypermits.com/mesa/permit/PMT26-10991/) |

### Farther (1,000 ft to ¼ mi), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 6, 2026 | [1455 S Stapley Dr 3](https://nearbypermits.com/mesa/address/1455-s-stapley-dr-3/) | 0.24 mi SW | Alteration or repair | interior tenant improvement of an approximately 4,600 square foot existing commercial space to accommodate a new dog boarding and daycare facility, including reconfiguration of the layout to provide boarding areas, supervised daycare spaces, a grooming center, customer lobby and reception, and emplo | Not listed | [PMT26-12199](https://nearbypermits.com/mesa/permit/PMT26-12199/) |
| May 27, 2026 | [1530 E Glade Ave](https://nearbypermits.com/mesa/address/1530-e-glade-ave/) | 0.21 mi E | Electrical | Permit is only for the installation of one tesla powerwall3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedu | Not listed | [PMT26-09865](https://nearbypermits.com/mesa/permit/PMT26-09865/) |

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb). Checked 2026-10-04 22:38 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/
