# Building permits at 1425 N Macdonald, Mesa, AZ

Two permits on record here. The newest, Jul 14: Plumbing permit to replace existing wet space with new shower and tub including new valve and prefabricated. Within a quarter mile, applicants have filed 2 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Jul 14, 2026 | Plumbing | Plumbing permit to replace existing wet space with new shower and tub including new valve and prefabricated acrylic walls in both master bathroom and hall bathroom. No structural changes. New installations will tie into existing piping. No change to overall square footage. Master bathroom shower rem | Not listed | [PMT26-12894](https://nearbypermits.com/mesa/permit/PMT26-12894/) |
| Aug 2, 2018 | Alteration or repair | Enclose/convert existing attached carport into garage- Permit 12' X 18' attached rear patio built by previous owner(s)-Wood frame shed roof over wood post and beams on concrete slab | Not listed | [PMT18-11166](https://nearbypermits.com/mesa/permit/PMT18-11166/) |

## Within ¼ mi since May 1, 2026

2 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 1 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Sep 2, 2026 | [46 W Hillview St](https://nearbypermits.com/mesa/address/46-w-hillview-st/) | 600 ft NE | Electrical | Permit is only for installation of one tesla powerwall 3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule  | Not listed | [PMT26-16139](https://nearbypermits.com/mesa/permit/PMT26-16139/) |

### Farther (1,000 ft to ¼ mi), 1 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Aug 19, 2026 | [216 W Mclellan Rd](https://nearbypermits.com/mesa/address/216-w-mclellan-rd/) | 0.23 mi NW | Electrical | Permit is only for the installation of two sigen 9.0 batteries. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule di | Not listed | [PMT26-15316](https://nearbypermits.com/mesa/permit/PMT26-15316/) |

## Zoning requests nearby

We don't list zoning cases for Mesa yet. Look them up on the city's Board of Adjustment page: https://www.mesaaz.gov/Government/Advisory-Boards-Committees/Board-of-Adjustment

## More on this street

Other addresses on N Macdonald with permits, nearest house number first:

- [248 N Macdonald](https://nearbypermits.com/mesa/address/248-n-macdonald/): newest permit Oct 20, 2025
- [141 N Macdonald](https://nearbypermits.com/mesa/address/141-n-macdonald/): newest permit Aug 19, 2026
- [109 N Macdonald](https://nearbypermits.com/mesa/address/109-n-macdonald/): newest permit Aug 5, 2026
- [105 N Macdonald](https://nearbypermits.com/mesa/address/105-n-macdonald/): newest permit Oct 13, 2025
- [26 N Macdonald](https://nearbypermits.com/mesa/address/26-n-macdonald/): newest permit Aug 3, 2026

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-09 07:14 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, both permits at this address and 2 nearby: https://nearbypermits.com/mesa/address/1425-n-macdonald/
