# Building permits at 2055 E Broadway Rd Office, Mesa, AZ

One permit on record here. The newest, Oct 30, 2025: Remove existing sign and install one double sided non-illuminated monument sign. Within a quarter mile, applicants have filed 5 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Oct 30, 2025 | Sign | Remove existing sign and install one double sided non-illuminated monument sign, 3.85' to copy, THE VANCE APARTMENTS 31 sq. ft. Sign is located at 32' from back of curb of Broadway Road and located out of right of way and easements. | Not listed | [PMT25-19853](https://nearbypermits.com/mesa/permit/PMT25-19853/) |

## Within ¼ mi since May 1, 2026

5 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jun 23, 2026 | [2102 E Broadway Rd](https://nearbypermits.com/mesa/address/2102-e-broadway-rd/) | 350 ft NE | Electrical | Like for like replacement of the 400amp (4) meter pak panel supplying power to units #33, #34, #35, & #36. There will be no change in electrical loads/amps. Electrical panel replacement will comply with 2023 NEC. | Not listed | [PMT26-11601](https://nearbypermits.com/mesa/permit/PMT26-11601/) |
| May 5, 2026 | [2030 E Broadway Rd](https://nearbypermits.com/mesa/address/2030-e-broadway-rd/) | 310 ft NW | Electrical | Like for like replacement of the 400amp (4) meter pak panel supplying power to units #13, #14, #15, & #16. There will be no change in electrical loads/amps. Electrical panel replacement will comply with 2023 NEC. | Not listed | [PMT26-08457](https://nearbypermits.com/mesa/permit/PMT26-08457/) |

### Farther (1,000 ft to ¼ mi), 3 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Aug 28, 2026 | [2240 E Calypso Ave](https://nearbypermits.com/mesa/address/2240-e-calypso-ave/) | 0.24 mi E | Electrical | Permit is only for the installation of one tesla powerwall3 battery. B.e.s.s. Shall be installed in accordance with NFPA 70 per r327.4. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic sys | Not listed | [PMT26-15803](https://nearbypermits.com/mesa/permit/PMT26-15803/) |
| Jun 22, 2026 | [1919 E Jarvis Ave](https://nearbypermits.com/mesa/address/1919-e-jarvis-ave/) | 0.23 mi NW | Electrical | Permit is only for installation of one tesla powerwall 3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule  | Not listed | [PMT26-11482](https://nearbypermits.com/mesa/permit/PMT26-11482/) |
| May 4, 2026 | [1928 E Jarvis Ave](https://nearbypermits.com/mesa/address/1928-e-jarvis-ave/) | 0.24 mi NW | Electrical | Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific  | Not listed | [PMT26-08381](https://nearbypermits.com/mesa/permit/PMT26-08381/) |

## Zoning requests nearby

We don't list zoning cases for Mesa yet. Look them up on the city's Board of Adjustment page: https://www.mesaaz.gov/Government/Advisory-Boards-Committees/Board-of-Adjustment

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-08 18:26 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, the one permit at this address and 5 nearby: https://nearbypermits.com/mesa/address/2055-e-broadway-rd-office/
