# Building permits at 2108 N Red Cliff, Mesa, AZ

Four permits on record here. The newest, May 12, 2025: Converting shower to shower, replacing pan, drain and valves. Within a quarter mile, the city has issued 1 more permit since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| May 12, 2025 | Plumbing | Converting shower to shower, replacing pan, drain and valves. Drain is staying in current location. | Not listed | [PMT25-08708](https://nearbypermits.com/mesa/permit/PMT25-08708/) |
| Sep 26, 2024 | Electrical | Installation of a 60 amp breaker at main panel for new above ground spa disconnect. All electrical to be installed per 2017 nec requirements. An above ground spa or hot tub with climbable side walls, or sidewalls less than five (5) feet in height shall be equipped with a hard safety cover that can b | Not listed | [PMT24-17004](https://nearbypermits.com/mesa/permit/PMT24-17004/) |
| May 15, 2019 | Plumbing | Install 130 lf of new gas line. 95 Lf of 1" pe piping from meter to 80k btu fire pit. 30 Lf of 1" pe piping "t'd" off from fire pit to 50k btu bbq. #18, Yellow, insulated tracer wire a minimum of 18" ground cover. | Not listed | [PMT19-07905](https://nearbypermits.com/mesa/permit/PMT19-07905/) |
| Dec 20, 2018 | Roofing | Master plan #1700 (plan 1) for sanctuary at mountain bridge. Ses= 200a, mx.water dl=72 FT., mx. Gas dl=74 FT. Mx gas demand=240 kbtus, post tension slab (special inspection) r-30 attic b/i insulation, 2x4 frame with r-13 batt insulation + r-4 from 1" eps integral to one coat stucco system (esr 1607) | Not listed | [PMT18-17486](https://nearbypermits.com/mesa/permit/PMT18-17486/) |

## Within ¼ mi since May 1, 2026

1 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 1 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 22, 2026 | [9022 E Kenwood St](https://nearbypermits.com/mesa/address/9022-e-kenwood-st/) | 350 ft NE | Electrical | Permit is only for the installation of one tesla powerwall3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedu | Not listed | [PMT26-13387](https://nearbypermits.com/mesa/permit/PMT26-13387/) |

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb). Checked 2026-10-05 17:57 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, all 4 permits at this address and 1 nearby: https://nearbypermits.com/mesa/address/2108-n-red-cliff/
