# Building permits at 2232 N Estates Cir, Mesa, AZ

Three permits on record here. The newest, Mar 12: Installation of a 60 amp dedicated circuit breaker for a chargepoint home flex 48a wall connector vehicle. Within a quarter mile, applicants have filed 1 more permit since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Mar 12, 2026 | Electrical | Installation of a 60 amp dedicated circuit breaker for a chargepoint home flex 48a wall connector vehicle charger in the garage. Existing 200 amp service meter. Electrical shall be installed per manufactures specifications and comply with 2024 ibc, 2023 nec and srp standards. Effective january 8, 20 | Not listed | [PMT26-04940](https://nearbypermits.com/mesa/permit/PMT26-04940/) |
| Dec 12, 2019 | Pool or spa | Construct a 411 SQ FT in-ground swimming pool and 48 SQ FT spa. Reference master plan # mst19-00383. Install two (2) new electrical runs: [e1] 85 FT of (2) #10 and (2) # 8 thwn. 1/2" Wrapped imc conduit. A minimum of 6" ground cover or 1/2" emt conduit above ground. 30 Amp circuit breaker. [E2] 70 F | Not listed | [PMT19-17954](https://nearbypermits.com/mesa/permit/PMT19-17954/) |
| May 30, 2017 | Fire systems | IRC 2006. Master plan #3177 for mountain bridge. Not all options will fit on each lot. All options shall comply with the setback requirements. Elevations 'a' 'b' 'c' 'd'. 1-Story new single family residence, wood framed construction with engineered trusses and post tension slab, stucco, tile roof. A | Not listed | [BLD2017-03991](https://nearbypermits.com/mesa/permit/BLD2017-03991/) |

## Within ¼ mi since May 1, 2026

1 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 1 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jul 22, 2026 | [9022 E Kenwood St](https://nearbypermits.com/mesa/address/9022-e-kenwood-st/) | 720 ft S | Electrical | Permit is only for the installation of one tesla powerwall3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedu | Not listed | [PMT26-13387](https://nearbypermits.com/mesa/permit/PMT26-13387/) |

## Zoning requests nearby

We don't list zoning cases for Mesa yet. Look them up on the city's Board of Adjustment page: https://www.mesaaz.gov/Government/Advisory-Boards-Committees/Board-of-Adjustment

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-10 02:58 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, all 3 permits at this address and 1 nearby: https://nearbypermits.com/mesa/address/2232-n-estates-cir/
