# Building permits at 4608 S Emery, Mesa, AZ

Two permits on record here. The newest, Dec 17, 2025: Permit is only for the installation of one solaredge home battery. Within a quarter mile, the city has issued 2 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Dec 17, 2025 | Electrical | Permit is only for the installation of one solaredge home battery. B.e.s.s. Shall be installed in accordance with NFPA 70 per r327.4. All work to be performed per 2018 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic syste | Not listed | [PMT25-23299](https://nearbypermits.com/mesa/permit/PMT25-23299/) |
| Jun 2, 2008 | Electrical | IRC 2006. Meritage homes master plan #510 (elevation=a) for "gila river ranches unit 1 and 3." 1-story SFR. Wood frame w/ engineered truss roof system, stucco finish w/ conc tile roof (elevations a&b) w/ stone veneer (elev d). 400 Amp elect service and 275k btu load w/ 131' total dev length servicin | Not listed | [BLD2008-05604](https://nearbypermits.com/mesa/permit/BLD2008-05604/) |

## Within ¼ mi since May 1, 2026

2 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Aug 26, 2026 | [11246 E Sylvan Ave](https://nearbypermits.com/mesa/address/11246-e-sylvan-ave/) | 420 ft E | Electrical | Permit is only for installation of one tesla powerwall 3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule  | Not listed | [PMT26-15708](https://nearbypermits.com/mesa/permit/PMT26-15708/) |
| Jun 18, 2026 | [11165 E Segura Ave](https://nearbypermits.com/mesa/address/11165-e-segura-ave/) | 390 ft W | Electrical | Permit is only for installation of one tesla powerwall 3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedule  | Not listed | [PMT26-11378](https://nearbypermits.com/mesa/permit/PMT26-11378/) |

## More on this street

Other addresses on S Emery with permits, nearest house number first:

- [4548 S Emery](https://nearbypermits.com/mesa/address/4548-s-emery/): newest permit Feb 26, 2025
- [5050 S Emery](https://nearbypermits.com/mesa/address/5050-s-emery/): newest permit May 21, 2026

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-07 15:54 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, both permits at this address and 2 nearby: https://nearbypermits.com/mesa/address/4608-s-emery/
