# Building permits at 500 S Temple St, Mesa, AZ

One permit on record here. The newest, Nov 8, 2024: This permit is for the installation of a new enphase iq battery iqbattery-5p-1p-na energy storage system. Within a quarter mile, the city has issued 3 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Nov 8, 2024 | Electrical | This permit is for the installation of a new enphase iq battery iqbattery-5p-1p-na energy storage system. All work to be performed per irc 2018 and srp specifications. Energy back up system to be installed per manufacture installation specifications and per irc 2018 section r327. Permit does not inc | Not listed | [PMT24-19620](https://nearbypermits.com/mesa/permit/PMT24-19620/) |

## Within ¼ mi since May 1, 2026

3 permits in the circle. From our copy of the city's data (last 24 months).

### Farther (1,000 ft to ¼ mi), 3 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 6, 2026 | [1025 E Dolphin Ave](https://nearbypermits.com/mesa/address/1025-e-dolphin-ave/) | 0.22 mi SE | Addition | Interior remodel (creation of bedrooms and office) & Rear addition (New Primary bedroom) | Not listed | [PMT26-18021](https://nearbypermits.com/mesa/permit/PMT26-18021/) |
| Aug 24, 2026 | [365 S Solomon](https://nearbypermits.com/mesa/address/365-s-solomon/) | 0.20 mi NE | Grading | Construction, repair, remodeling, demolition, and excavation work activities may be conducted between 6:00 a.m. through 8:00 p.m. Monday through Friday. Construction work outside of the permitted timeframes will require an afterhours permit. Afterhours permits for construction are subject to the fol | Not listed | [PMT26-15567](https://nearbypermits.com/mesa/permit/PMT26-15567/) |
| Aug 12, 2026 | [365 S Solomon](https://nearbypermits.com/mesa/address/365-s-solomon/) | 0.20 mi NE | Electrical | Upgrade existing traffic signal at Broadway Road and Solomon. Improvements include new poles, signal head, signal equipment, etc. New 100 Amp, 120/240V, single phase meter pedestal. | Not listed | [PMT26-14808](https://nearbypermits.com/mesa/permit/PMT26-14808/) |

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-08 05:03 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, the one permit at this address and 3 nearby: https://nearbypermits.com/mesa/address/500-s-temple-st/
