# Building permits at 917 N Barkley, Mesa, AZ

One permit on record here. The newest, Sep 9: Installation of 120-ft of 2-in pe gas line buried 18-in with 14-gauge tracer wire from gas meter to 400k btu. Within a quarter mile, the city has issued 4 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 9, 2026 | Plumbing | Installation of 120-ft of 2-in pe gas line buried 18-in with 14-gauge tracer wire from gas meter to 400k btu pool heater. All gas lines are to be installed per 2024 ifgc and com gas requirements. Contact com gas engineering at to determine if the meter needs to be upgraded. No record on file for exi | Not listed | [PMT26-16385](https://nearbypermits.com/mesa/permit/PMT26-16385/) |

## Within ¼ mi since May 1, 2026

4 permits in the circle. From our copy of the city's data (last 24 months).

### This block (250 to 1,000 ft), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Jun 11, 2026 | [1457 E 8th St](https://nearbypermits.com/mesa/address/1457-e-8th-st/) | 920 ft S | Alteration or repair | Stem Wall Repair per Engineered Plans. Special Inspections required for Helical Pier Installation & Stem Wall Repair. | Not listed | [PMT26-10983](https://nearbypermits.com/mesa/permit/PMT26-10983/) |
| May 28, 2026 | [823 N Harris Dr](https://nearbypermits.com/mesa/address/823-n-harris-dr/) | 900 ft SE | Electrical | Permit is only for the installation of one tesla powerwall3 battery. All work to be performed per 2024 irc, manufacture's installation instructions and service utility provider specifications. Permit does not include photovoltaic system installation. Do not disconnect utility wires or meters. Schedu | Not listed | [PMT26-09925](https://nearbypermits.com/mesa/permit/PMT26-09925/) |

### Farther (1,000 ft to ¼ mi), 2 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 2, 2026 | [1343 E Ellis Cir](https://nearbypermits.com/mesa/address/1343-e-ellis-cir/) | 0.20 mi SW | Electrical | Installation of 13.50 kWh Battery and Main Panel Upgrade to 225A. | Not listed | [PMT26-17741](https://nearbypermits.com/mesa/permit/PMT26-17741/) |
| Jul 20, 2026 | [830 N Hill Cir](https://nearbypermits.com/mesa/address/830-n-hill-cir/) | 0.24 mi SE | Addition | COB26-00058 New build of back patio | Not listed | [PMT26-13306](https://nearbypermits.com/mesa/permit/PMT26-13306/) |

## More on this street

Other addresses on N Barkley with permits, nearest house number first:

- [853 N Barkley](https://nearbypermits.com/mesa/address/853-n-barkley/): newest permit Mar 20, 2025
- [1013 N Barkley](https://nearbypermits.com/mesa/address/1013-n-barkley/): newest permit Aug 4, 2025
- [1023 N Barkley](https://nearbypermits.com/mesa/address/1023-n-barkley/): newest permit Feb 18, 2026
- [1118 N Barkley](https://nearbypermits.com/mesa/address/1118-n-barkley/): newest permit Sep 25, 2026
- [1336 N Barkley](https://nearbypermits.com/mesa/address/1336-n-barkley/): newest permit Dec 3, 2025
- [1342 N Barkley](https://nearbypermits.com/mesa/address/1342-n-barkley/): newest permit Oct 25, 2024
- [51 N Barkley](https://nearbypermits.com/mesa/address/51-n-barkley/): newest permit Jul 2, 2026

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb), City of Mesa. Checked 2026-10-08 01:30 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Map, the one permit at this address and 4 nearby: https://nearbypermits.com/mesa/address/917-n-barkley/
