# Addition permit PMT25-21177 at 4700 E Main St L61, Mesa

Mesa Development Services permit PMT25-21177: opened Nov 17, 2025 for addition work at 4700 E Main St L61. All inclusive permit for park model set, awning and arizona room. Park model shall not be occupied until all structures are complete and final inspection performed. Installation of 13.33-ft x 30.75-ft 2026 cavco palo verde park model with a 13.33-ft x 6-ft factory deck/porch. A/c in rear. Install new 15.58-ft x 18-ft awning. No gas or lp tanks. Construction of 369 SQ FT livable addition with electric and plumbing for bathroom, washer/dryer on raised deck. Accessory structure roof areas do not exceed the 100% pm floor area. Accessory structure shall be removed within 60 days of removal of the park model. Minimum one 9-ft x 18-ft unobstructed paved, 2-in asphalt or 4-in concrete, parking space required behind front setback. 35-Ft x 52-ft perimeter lot. Min setbacks: 3-ft front, 5-ft rear for perimeter lots, 3' sides. Approved as noted.

- Permit number: PMT25-21177
- Opened: Nov 17, 2025
- Type of work: Addition (city: Park Model Other Addition, Mobile Home)
- Status: Issued (city: Issued)
- Reported cost: Not listed
- ZIP code: 85205 (derived from location)
- All permits at this address: https://nearbypermits.com/mesa/address/4700-e-main-st-l61/

---
Source: Mesa Development Services permit data (https://citydata.mesaaz.gov/d/dzpk-hxfb). Checked 2026-10-05 18:12 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/

Every permit at 4700 E Main St L61: https://nearbypermits.com/mesa/address/4700-e-main-st-l61/
