# Building permits at 1505 Eastern Ave, Sacramento County, CA

Two permits here in the last two years. The newest, Sep 9, 2025: Water heater changeout only. Within a quarter mile, the county has issued 42 more permits since May 1.

## At this address

| Date | Type | Work | Cost | Permit |
|---|---|---|---|---|
| Sep 9, 2025 | Plumbing | Water heater changeout only. No additional electrical, mechanical, plumbing, or structural work permitted.; Replace Bradford white 40 gallon gas water heater | $4,859 | [WHTR2025-01261](https://nearbypermits.com/sacramento-county/permit/WHTR2025-01261/) |
| Jun 12, 2025 | Roofing | Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Reroof with Title 24 Compliant Asphalt Shingle | $34,900 | [RRZR2025-01198](https://nearbypermits.com/sacramento-county/permit/RRZR2025-01198/) |

## Within ¼ mi since May 1, 2026

42 permits in the circle. From our copy of the county's data (last 24 months).

### This block (250 to 1,000 ft), 27 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 5, 2026 | [4305 Las Cruces Way](https://nearbypermits.com/sacramento-county/address/4305-las-cruces-way/) | 330 ft E | Electrical | HVAC Change out - variable speed 3 ton 16.2 seer 9.4 eer 8.4 hspf electric heat pump split system located outside/attic. Gas to electric fuel swap | $23,782 | [MISR2026-03372](https://nearbypermits.com/sacramento-county/permit/MISR2026-03372/) |
| Sep 30, 2026 | [1421 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1421-eastern-ave/) | 250 ft S | Solar | SolarApp ID: SA20260924-2133-558-8289-A; Installing 5.28KW Roof Mounted PV + ESS, MPU | $43,936 | [SOLR2026-00550](https://nearbypermits.com/sacramento-county/permit/SOLR2026-00550/) |
| Sep 3, 2026 | [4068 Las Pasas Way](https://nearbypermits.com/sacramento-county/address/4068-las-pasas-way/) | 270 ft NW | Solar | SolarApp ID: SA20260903-2133-494-18498-A; Installation of a 3.69kw dc system, 9 modules roof mounted with 1 tesla battery and 1 tesla expansion. | $21,626 | [SOLR2026-00438](https://nearbypermits.com/sacramento-county/permit/SOLR2026-00438/) |
| Aug 10, 2026 | [4301 Valmonte Dr](https://nearbypermits.com/sacramento-county/address/4301-valmonte-dr/) | 430 ft E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02396](https://nearbypermits.com/sacramento-county/permit/MISR2026-02396/) |
| Aug 10, 2026 | [4337 Surita St](https://nearbypermits.com/sacramento-county/address/4337-surita-st/) | 940 ft E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02390](https://nearbypermits.com/sacramento-county/permit/MISR2026-02390/) |
| Aug 10, 2026 | [4301 Surita St](https://nearbypermits.com/sacramento-county/address/4301-surita-st/) | 590 ft N | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02388](https://nearbypermits.com/sacramento-county/permit/MISR2026-02388/) |
| Aug 10, 2026 | [4318 Surita St](https://nearbypermits.com/sacramento-county/address/4318-surita-st/) | 600 ft NE | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02083](https://nearbypermits.com/sacramento-county/permit/MISR2026-02083/) |
| Aug 10, 2026 | [4306 Surita St](https://nearbypermits.com/sacramento-county/address/4306-surita-st/) | 460 ft NE | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02082](https://nearbypermits.com/sacramento-county/permit/MISR2026-02082/) |
| Aug 10, 2026 | [4305 Las Cruces Way](https://nearbypermits.com/sacramento-county/address/4305-las-cruces-way/) | 330 ft E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02074](https://nearbypermits.com/sacramento-county/permit/MISR2026-02074/) |
| Aug 6, 2026 | [4329 Surita St](https://nearbypermits.com/sacramento-county/address/4329-surita-st/) | 850 ft E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02090](https://nearbypermits.com/sacramento-county/permit/MISR2026-02090/) |
| Aug 6, 2026 | [4076 Las Pasas Way](https://nearbypermits.com/sacramento-county/address/4076-las-pasas-way/) | 390 ft NW | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02076](https://nearbypermits.com/sacramento-county/permit/MISR2026-02076/) |
| Aug 6, 2026 | [4217 Berrendo Dr](https://nearbypermits.com/sacramento-county/address/4217-berrendo-dr/) | 580 ft SW | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02067](https://nearbypermits.com/sacramento-county/permit/MISR2026-02067/) |
| Aug 6, 2026 | [4212 Berrendo Dr](https://nearbypermits.com/sacramento-county/address/4212-berrendo-dr/) | 770 ft SW | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02065](https://nearbypermits.com/sacramento-county/permit/MISR2026-02065/) |
| Aug 5, 2026 | [4333 Valmonte Dr](https://nearbypermits.com/sacramento-county/address/4333-valmonte-dr/) | 890 ft NE | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02397](https://nearbypermits.com/sacramento-county/permit/MISR2026-02397/) |
| Jul 16, 2026 | [1409 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1409-eastern-ave/) | 670 ft S | Solar | SolarApp ID: SA20251215-2133-423-15606-B; 15.99kW DC PV roof mount with 2 Batteries and EV charger | $71,183 | [SOLR2026-00286](https://nearbypermits.com/sacramento-county/permit/SOLR2026-00286/) |
| Jun 23, 2026 | [4092 Cresta Way](https://nearbypermits.com/sacramento-county/address/4092-cresta-way/) | 940 ft NW | Roofing | Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; Tear off existing composition shingle roof and install Limited Lifetime composition shingle cool roof | $24,900 | [RRZR2026-01375](https://nearbypermits.com/sacramento-county/permit/RRZR2026-01375/) |
| Jun 22, 2026 | [4332 Las Cruces Way](https://nearbypermits.com/sacramento-county/address/4332-las-cruces-way/) | 900 ft E | Plumbing | Water heater changeout only. No additional electrical, mechanical, plumbing, or structural work permitted.; Swap for swap 40 gallon water heater. | $3,600 | [WHTR2026-00933](https://nearbypermits.com/sacramento-county/permit/WHTR2026-00933/) |
| Jun 11, 2026 | [4079 Cresta Way](https://nearbypermits.com/sacramento-county/address/4079-cresta-way/) | 940 ft NW | Mechanical (HVAC) | Changeout to existing HVAC system only. No additional electrical, mechanical, plumbing, or structural work permitted.; 4 TON HEAT PUMP AC AND AIR HANDLER CHANGEOUT | $23,000 | [HACR2026-01622](https://nearbypermits.com/sacramento-county/permit/HACR2026-01622/) |
| Jun 9, 2026 | [4336 Las Cruces Way](https://nearbypermits.com/sacramento-county/address/4336-las-cruces-way/) | 980 ft E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01586](https://nearbypermits.com/sacramento-county/permit/MISR2026-01586/) |
| Jun 8, 2026 | [4109 Las Cruces Way](https://nearbypermits.com/sacramento-county/address/4109-las-cruces-way/) | 840 ft W | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01584](https://nearbypermits.com/sacramento-county/permit/MISR2026-01584/) |
| Jun 8, 2026 | [4044 Cresta Way](https://nearbypermits.com/sacramento-county/address/4044-cresta-way/) | 850 ft W | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01510](https://nearbypermits.com/sacramento-county/permit/MISR2026-01510/) |
| Jun 8, 2026 | [4232 Berrendo Dr](https://nearbypermits.com/sacramento-county/address/4232-berrendo-dr/) | 580 ft S | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01484](https://nearbypermits.com/sacramento-county/permit/MISR2026-01484/) |
| Jun 2, 2026 | [1383 Fitch Way](https://nearbypermits.com/sacramento-county/address/1383-fitch-way/) | 820 ft S | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01535](https://nearbypermits.com/sacramento-county/permit/MISR2026-01535/) |
| Jun 1, 2026 | [1310 Corta Way](https://nearbypermits.com/sacramento-county/address/1310-corta-way/) | 790 ft SW | Mechanical (HVAC) | change out 3 ton split unit HEAT PUMP | $16,450 | [MISR2026-01554](https://nearbypermits.com/sacramento-county/permit/MISR2026-01554/) |
| Jun 1, 2026 | [1537 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1537-eastern-ave/) | 390 ft N | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01542](https://nearbypermits.com/sacramento-county/permit/MISR2026-01542/) |
| Jun 1, 2026 | [1419 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1419-eastern-ave/) | 340 ft S | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01511](https://nearbypermits.com/sacramento-county/permit/MISR2026-01511/) |
| Jun 1, 2026 | [4300 Arden Way](https://nearbypermits.com/sacramento-county/address/4300-arden-way/) | 920 ft N | Electrical | SUBJECT TO FIELD APPROVAL - Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Pr | $500 | [MISC2026-00952](https://nearbypermits.com/sacramento-county/permit/MISC2026-00952/) |

### Farther (1,000 ft to ¼ mi), 15 permits

| Date | Address | Distance | Type | Work | Cost | Permit |
|---|---|---|---|---|---|---|
| Oct 2, 2026 | [1376 Fitch Way](https://nearbypermits.com/sacramento-county/address/1376-fitch-way/) | 0.20 mi S | Electrical | Installation of (1) Tesla PW3 Battery, (2) Tesla PW3 Expansion Unit and (1) Tesla Backup Switch | $30,000 | [MISR2026-03327](https://nearbypermits.com/sacramento-county/permit/MISR2026-03327/) |
| Oct 1, 2026 | [1608 Stewart Rd](https://nearbypermits.com/sacramento-county/address/1608-stewart-rd/) | 0.24 mi NE | Electrical | Installing 1 Tesla Battery + Exp Pack and MPU REV01 No longer moving forward with MPU | $37,350 | [MISR2026-03147](https://nearbypermits.com/sacramento-county/permit/MISR2026-03147/) |
| Sep 2, 2026 | [1347 Fitch Way](https://nearbypermits.com/sacramento-county/address/1347-fitch-way/) | 0.25 mi SW | Alteration or repair | Remove existing siding on 2 front walls. Install new osb plywood. Install new R-15 on 2 walls. Install new weather barrier building paper on 2 walls. Install James Hardie Board and Batten and trims on 2 walls. | $8,904 | [CBRR2026-00932](https://nearbypermits.com/sacramento-county/permit/CBRR2026-00932/) |
| Aug 12, 2026 | [1710 Rolling Hills Rd](https://nearbypermits.com/sacramento-county/address/1710-rolling-hills-rd/) | 0.25 mi N | Roofing | Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; re roof, current roof removal and installation of new one | $14,000 | [RRZR2026-01812](https://nearbypermits.com/sacramento-county/permit/RRZR2026-01812/) |
| Aug 10, 2026 | [4411 Surita St](https://nearbypermits.com/sacramento-county/address/4411-surita-st/) | 0.24 mi E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02391](https://nearbypermits.com/sacramento-county/permit/MISR2026-02391/) |
| Aug 10, 2026 | [4066 Esperanza Dr](https://nearbypermits.com/sacramento-county/address/4066-esperanza-dr/) | 0.24 mi NW | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02071](https://nearbypermits.com/sacramento-county/permit/MISR2026-02071/) |
| Aug 5, 2026 | [4413 Berrendo Dr](https://nearbypermits.com/sacramento-county/address/4413-berrendo-dr/) | 0.21 mi SE | Roofing | Re-roof or overlay onto existing single layer of roofing only. No additional electrical, mechanical, plumbing, or structural work permitted.; remove 45 squares of one layer of comp and install a 50 year cool roof shingle | $52,000 | [RRZR2026-01742](https://nearbypermits.com/sacramento-county/permit/RRZR2026-01742/) |
| Aug 5, 2026 | [4340 Valmonte Dr](https://nearbypermits.com/sacramento-county/address/4340-valmonte-dr/) | 0.19 mi NE | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-02398](https://nearbypermits.com/sacramento-county/permit/MISR2026-02398/) |
| Jun 9, 2026 | [1541 Stewart Rd](https://nearbypermits.com/sacramento-county/address/1541-stewart-rd/) | 0.19 mi E | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01597](https://nearbypermits.com/sacramento-county/permit/MISR2026-01597/) |
| Jun 8, 2026 | [1609 Stewart Rd](https://nearbypermits.com/sacramento-county/address/1609-stewart-rd/) | 0.21 mi NE | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01599](https://nearbypermits.com/sacramento-county/permit/MISR2026-01599/) |
| Jun 8, 2026 | [1604 Stewart Rd](https://nearbypermits.com/sacramento-county/address/1604-stewart-rd/) | 0.24 mi NE | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01598](https://nearbypermits.com/sacramento-county/permit/MISR2026-01598/) |
| Jun 8, 2026 | [4028 Cresta Way](https://nearbypermits.com/sacramento-county/address/4028-cresta-way/) | 0.21 mi W | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01509](https://nearbypermits.com/sacramento-county/permit/MISR2026-01509/) |
| Jun 5, 2026 | [4056 Esperanza Dr](https://nearbypermits.com/sacramento-county/address/4056-esperanza-dr/) | 0.21 mi NW | Pool or spa | Construction of an inground swimming pool | $78,010 | [SPCR2025-00339](https://nearbypermits.com/sacramento-county/permit/SPCR2025-00339/) |
| Jun 1, 2026 | [4049 Esperanza Dr](https://nearbypermits.com/sacramento-county/address/4049-esperanza-dr/) | 0.23 mi NW | Electrical | Install two grounding rods close to the existing electrical panel with a minimum of 6' between rods. Rods shall be bonded together and to the panel. Water line and gas supply line for water heater shall be bonded. 4592 SCWA Phase 4, 5, 6 Arden Service Area Pipe & Meter Project | $500 | [MISR2026-01531](https://nearbypermits.com/sacramento-county/permit/MISR2026-01531/) |
| May 26, 2026 | [4340 Valmonte Dr](https://nearbypermits.com/sacramento-county/address/4340-valmonte-dr/) | 0.19 mi NE | Alteration or repair | kitchen remodel. Window and door replacement, 2 walls siding replacement New Scope 12/22/2025- DEMO PER DEMO PLAN REMODEL OF EXISTING DINING / KITCHEN AREA PER PLAN Kitchen scope is remove and replace cabs/tops/sink and faucet/appliances. Living/dining scope is remove fake beams and crown moulding/b | $100,000 | [CBAR2025-01272](https://nearbypermits.com/sacramento-county/permit/CBAR2025-01272/) |

## Zoning requests nearby

We don't list zoning cases for Sacramento County yet.

## More on this street

Other addresses on Eastern Ave with permits, nearest house number first:

- [1513 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1513-eastern-ave/): newest permit Mar 15, 2025
- [1537 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1537-eastern-ave/): newest permit Jun 1, 2026
- [1421 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1421-eastern-ave/): newest permit Sep 30, 2026
- [1419 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1419-eastern-ave/): newest permit Jun 1, 2026
- [1409 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1409-eastern-ave/): newest permit Jul 16, 2026
- [1337 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1337-eastern-ave/): newest permit Oct 23, 2024
- [1313 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1313-eastern-ave/): newest permit Mar 15, 2025
- [1309 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1309-eastern-ave/): newest permit Jan 2, 2026
- [1305 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1305-eastern-ave/): newest permit Aug 25, 2025
- [1301 Eastern Ave](https://nearbypermits.com/sacramento-county/address/1301-eastern-ave/): newest permit Dec 26, 2025

---
Source: Sacramento County Building Permits and Inspection permit data (https://www.arcgis.com/home/item.html?id=60ae20bfaa0b4c51bc0c50a961f5289d). Checked 2026-10-12 07:48 UTC. Nearby Permits, https://nearbypermits.com. JSON API and MCP server: https://nearbypermits.com/developers/