2 permits in the last 90 days. The newest, Sep 1: Climate Controls System Upgrade - Central Plant Replacement of existing control devices serving existing, at 700 H St.

| Date | Address | Type | Work | Cost | Permit |
|---|---|---|---|---|---|
| Sep 1, 2026 | [700 H St](https://nearbypermits.com/sacramento-county/address/700-h-st/) | Electrical | Climate Controls System Upgrade - Central Plant Replacement of existing control devices serving existing boilers and chiller. New electrical panel. New variable frequency drives. New hydronic valves and modifications to existing valves. | $600,000 | [CCBP2026-00012](https://nearbypermits.com/sacramento-county/permit/CCBP2026-00012/) |
| Jul 24, 2026 | [700 H St](https://nearbypermits.com/sacramento-county/address/700-h-st/) | Plumbing | This project is an exterior landscaping project in the plaza on the south side of the existing new administration building. The scope of work involves removal of existing turf in the raised planter, installation of new drought tolerant landscaping, new irrigation, and interpretive signage. The exist | $600,000 | [CCBP2026-00006](https://nearbypermits.com/sacramento-county/permit/CCBP2026-00006/) |
| Jul 8, 2026 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Alteration or repair | Main Jail – Nurse Station Accessibility Improvements Project scope includes upgrades to the nurse station casework and sink in the medical unit area to meet accessibility standards. Work is limited to interior alterations within the existing facility. No change in occupancy or building use. | $132,556 | [CCBP2026-00008](https://nearbypermits.com/sacramento-county/permit/CCBP2026-00008/) |
| Jun 4, 2026 | [799 G St](https://nearbypermits.com/sacramento-county/address/799-g-st/) | Electrical | Project scope includes reconfiguring (3) adjacent training rooms by removing shared partitions to create (1) large training room divided by an operable wall. Work includes new wall framing, new entry doors, installation of operable partition, installation of floor electrical boxes, mechanical upgrad | $542,061 | [CCBP2025-00066](https://nearbypermits.com/sacramento-county/permit/CCBP2025-00066/) |
| Mar 9, 2026 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Alteration or repair | REPLACE EXISTING FENWAL HALON SYTEM w/ NEW FM200 SYTEM., REV_01=Replace existing fenwal halon system with new clean agent system. Revision to permit CCBP2024-00013 in order to clarify system selection, location, and relevant notes. 13-01 Replace existing fenwal halon system with new clean agent syst | $68,000 | [CCBP2024-00013](https://nearbypermits.com/sacramento-county/permit/CCBP2024-00013/) |
| Mar 9, 2026 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Alteration or repair | REPLACE EXISTING FENWAL HALON SYSTEM w/ NEW FM200 SYSTEM, REV-01=Replace existing fenwal halon system with new clean agent system. This will be a revision to a previously approved set which will clarify the system selection, size, location, and relevant notes. 12-01 REV-01=Replace existing fenwal ha | $58,000 | [CCBP2024-00012](https://nearbypermits.com/sacramento-county/permit/CCBP2024-00012/) |
| Oct 24, 2025 | [625 7th St](https://nearbypermits.com/sacramento-county/address/625-7th-st/) | Electrical | This project is for the installation of 12 new level III electric vehicle charging stations (evcs) to the existing sacramento county employee parking grge at 625 7th st, sacramento CA. This work shall include a bus tap to existing 1,000 amp bus in existing main switchboard, installationof 600amp enc | $285,000 | [CCBP2024-00003](https://nearbypermits.com/sacramento-county/permit/CCBP2024-00003/) |
| Aug 21, 2025 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Electrical | The project will replace the seven(7) refrigerations comperssors located in the rack with (3) new water cooled condenser cabinets located in the basement, nine (9) evaporators, ancillary components and interconnection refrigeration piping an delectrical connnections, additionally, a new fluid cooler | $500,000 | [CCBP2025-00004](https://nearbypermits.com/sacramento-county/permit/CCBP2025-00004/) |
| Jul 1, 2025 | [827 7th St](https://nearbypermits.com/sacramento-county/address/827-7th-st/) | Fire systems | Refurbish the exist mechanical AHU's including modifications to exist electrical, fire alarm and upgrades to building management system controls for the AHU's. | $2,789,941 | [CCBP2023-00065](https://nearbypermits.com/sacramento-county/permit/CCBP2023-00065/) |
| Jun 16, 2025 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Alteration or repair | Remodel of 3rd floor 200 West for a new Suicide Intervention Transitional Housing Unit. Remodel of 3rd floor 200 East to create an Acute Psychiatric Unit. The work is part of the Mays Consent Decree. Main jail 200w suicidal inmate temporary housing unit | $4,500,000 | [CCBP2025-00009](https://nearbypermits.com/sacramento-county/permit/CCBP2025-00009/) |
| Mar 15, 2025 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Other | Installation o ftwo systems funiture hipaa enclosures on the 2nd floor east pod. This installationis the same as the following permit #'s, except on a different floor. Ccbp2023-00048 3rd floor, and ccbp2024-00001 on the 8th floor. | $10,000 | [CCBP2024-00036](https://nearbypermits.com/sacramento-county/permit/CCBP2024-00036/) |
| Mar 15, 2025 | [799 G St](https://nearbypermits.com/sacramento-county/address/799-g-st/) | Alteration or repair | Department of technology 8th floor exhaust fan relocation remove two existing inline exhaust fans on the eighth floor and replace with new utility exhaust fans at the roof. | $100,000 | [CCBP2024-00002](https://nearbypermits.com/sacramento-county/permit/CCBP2024-00002/) |
| Mar 15, 2025 | [651 I St](https://nearbypermits.com/sacramento-county/address/651-i-st/) | Mechanical (HVAC) | Keep equipment closet from overheating and stopping equipment add exhaust fan. Transfer duct, and dental vacuum system exhaust from existing eqipemnt closet to building exterior. Include power and thermostat for new fan, and fire damper at transer grille. | $185,000 | [CCBP2023-00076](https://nearbypermits.com/sacramento-county/permit/CCBP2023-00076/) |
| Mar 15, 2025 | [827 7th St](https://nearbypermits.com/sacramento-county/address/827-7th-st/) | Alteration or repair | PROJECT INVOLVES Removal of 7 Linear feet of Systems furniture wall panels. Instillation of a new 3-5/8" Meal stud full height non-bearing wall with new 3068 SC Flush wood door, new door hardware and new door operator. Install an additional door operator on an additional door | $50,000 | [CCBP2023-00032](https://nearbypermits.com/sacramento-county/permit/CCBP2023-00032/) |
| Mar 15, 2025 | [700 H St](https://nearbypermits.com/sacramento-county/address/700-h-st/) | Alteration or repair | alter the lobby of the CEOs office, security upgrade for a bullet proof, ADA compliant | $197,000 | [CCBP2022-00016](https://nearbypermits.com/sacramento-county/permit/CCBP2022-00016/) |
| Mar 15, 2025 | [700 H St](https://nearbypermits.com/sacramento-county/address/700-h-st/) | Other | Dept of finance surveillance and system upgrade - project entails installing a quad outlet for server room. Prep for dtech and alarms work with ups and servers. | $75,000 | [CCBP2021-00079](https://nearbypermits.com/sacramento-county/permit/CCBP2021-00079/) |

## Zoning requests in 95814

We don't list zoning cases for Sacramento County yet.

---