Building permits in New York City, ZIP code 10014
Newest first. Checked 2026-10-01 02:14 UTC.
| Date | Address | Type | Work | Cost |
|---|---|---|---|---|
| 829 Greenwich Street, Manhattan | Solar | Install solar PV on existing rooftop canopy (by others and filed separately). No change in use, occupancy, or egress. | $42,240 | |
| 77 Barrow Street, Manhattan | General construction | Installation of sliding door at existing window opening at rear of existing apartment as per plan. | $6,750 | |
| 435 Hudson Street, Manhattan | Structural | Structural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change… | $150,000 | |
| 157 Christopher Street, Manhattan | Boiler Equipment | Remove boilers from 2nd and 3rd floors and install two (2) new gas fired boilers in cellar. | $10,000 | |
| 81 Perry Street, Manhattan | General construction | Renovation of existing apartment including removal and replacement of existing floors, ceilings, partitions, doors, widows, equipment, finishes and fixtures | $206,410 | |
| 81 Perry Street, Manhattan | Mechanical Systems | Renovation of existing apartment including removal and replacement of existing floors, ceilings, partitions, doors, widows, equipment, finishes and fixtures | $206,410 | |
| 747 Washington Street, Manhattan | Mechanical Systems | Work to include renovation of existing commercial space on the 001 floorand mezzanine, and renovation of existing roof space. This application includes a changein occupancy and… | – | |
| 747 Washington Street, Manhattan | General construction | Renovation of commercial building, No change in use egress or occupancy | $1,506,300 | |
| 79 Christopher Street, Manhattan | Mechanical Systems | The mechanical scope includes installing a central heat pump air conditioning system, remote heat pump water heater, kitchen exhaust and make-up air system, and toilet exhaust… | $199,870 | |
| 3 Sheridan Square, Manhattan | General construction | Renovation of apartment #4h. Partition work. Kitchen and bathroom renovation. | $88,000 | |
| 237 West 11 Street, Manhattan | General construction | General construction for limited exterior facade repairs as per plans filed herewith. No change in use, egress or occupancy. | $144,000 | |
| 204 West 10 Street, Manhattan | Sidewalk Shed | Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter 33 of nycc | $1 | |
| 204 West 10 Street, Manhattan | Supported Scaffold | Installation of heavy duty sidewalk shed and pipe scaffolding. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter 33 of nycc | $1 | |
| 38 Perry Street, Manhattan | General construction | Extend existing chimneys vertically due to vertical enlargement of adjoining building located at 36 perry street, filed under separate alt-co application m00969305-i1. No change… | $25,000 | |
| 244 West 11 Street, Manhattan | General construction | Conversion of existing building to R-3 single family home and horizontal enlargement | $849,969 | |
| 170 7 Avenue South, Manhattan | Plumbing | Interior renovation of existing commercial space to install new two hand sink and a 3-comp sink, etc. | $3,000 | |
| 96 Morton Street, Manhattan | Sprinklers | Modification of plumbing fixtures and sprinkler system as indicated on drawing. No change in use, egress or occupancy. | $117,000 | |
| 96 Morton Street, Manhattan | Plumbing | Modification of plumbing fixtures and sprinkler system as indicated on drawing. No change in use, egress or occupancy. | $117,000 | |
| 78 Horatio Street, Manhattan | Sidewalk Shed | Installation of heavy-duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2022 NYC… | $2,500 | |
| 76 Horatio Street, Manhattan | Sidewalk Shed | Installation of heavy-duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2022 NYC… | $2,500 | |
| 253 Bleecker Street, Manhattan | Supported Scaffold | Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the… | $1,000 | |
| 253 Bleecker Street, Manhattan | Sidewalk Shed | Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. No change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the… | $1,000 | |
| 534 Hudson Street, Manhattan | Plumbing | Filing for plumbing work at the 5th, 6th floor, and roof. No change to use, egress, or occupancy. | $83,015 | |
| 687b Greenwich Street, Manhattan | General construction | Interior/exterior work as shown on plans filed herewith. No change in use egress or occupancy | $1,053,900 | |
| 90 Morton Street, Manhattan | Sprinklers | Sprinkler work filed in conjunction with renovation of penthouse unit on 11th & 12th floors. No change in use, occupancy, or egress. | $100,000 |