Building permits in New York City, ZIP code 10024
Newest first. Checked 2026-10-01 02:14 UTC.
| Date | Address | Type | Work | Cost |
|---|---|---|---|---|
| 601 West End Avenue, Manhattan | Sidewalk Shed | Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code… | $1,000 | |
| 15 West 84 Street, Manhattan | Plumbing | Modifications to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy. | $14,000 | |
| 41 West 82 Street, Manhattan | Plumbing | Existing apartment 7d on 82nd street with plumbing work on 1st floor only. This application is related to DOB alt2 job #m01438382-i1. No change in use, egress ir occupancy under… | $4,000 | |
| 308 West 82 Street, Manhattan | General construction | Interior renovation at Apt. 3A and Apt. 11C, work inc: Remove and install new partition and misc. finishes. No change in use, egress, or occupancy is involved under this… | $89,600 | |
| 173 West 78 Street, Manhattan | General construction | General construction work to include addition of a new wheelchair lift device in existing multifamily residential lobby adjacent to existing steps as per plans filed herewith. No… | $90,000 | |
| 67 Riverside Drive, Manhattan | Mechanical Systems | Installation of new multizone ac system with outdoor air cooled condensing unit and associated ac units in apt 6b as per plans filed herewith. No change in use, egress and… | $65,000 | |
| 67 Riverside Drive, Manhattan | General construction | Installation of new multizone ac system with outdoor air cooled condensing unit and associated ac units in apt 6b as per plans filed herewith. No change in use, egress and… | $65,000 | |
| 118 West 79 Street, Manhattan | Plumbing | Relocation of kitchen and bath #1, renovate primary bath and bath #2. Replace washing machine. No change of use, egress, or occupancy. | $42,500 | |
| 155 Riverside Drive, Manhattan | Sidewalk Shed | installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | $23,000 | |
| 251 West 80 Street, Manhattan | Protection and Mechanical Methods | Installation of temporary protection as per plans. No change in use, egress or occupancy shall comply with chapter#33 of 2022 the NY building code. | $1,000 | |
| 225 West 86 Street, Manhattan | Plumbing | Modification to the existing plumbing system and installation new fixtures as per plans filed herewith. No change to use, egress, or occupancy. | $120,000 | |
| 230 Central Park West, Manhattan | Sidewalk Shed | Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code… | $1,000 | |
| 188 West 88 Street, Manhattan | Sidewalk Shed | Installation of heavy duty sidewalk shed as per plans. No change in use occupancy or egress under this application. Sidewalk shed shall comply with chapter 33 of the 2022 NYC… | $12,000 | |
| 450 West End Avenue, Manhattan | Protection and Mechanical Methods | Installation of a temporary Material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this… | $3,000 | |
| 160 West 85 Street, Manhattan | Suspended Scaffold | Installation of temporary suspended scaffold equipment - no changes in the egress | – | |
| 48 West 86 Street, Manhattan | Plumbing | Install gas bbq, and associated piping, valves, appurtenances. Connection to existing gas piping distribution within the apartment on the first floor. | $35,000 | |
| 118 West 79 Street, Manhattan | General construction | Relocation of kitchen and one bathroom, renovation of 2 bathrooms, add central ac, and minor partition work. No change of use egress or occupancy. | $175,000 | |
| 118 West 79 Street, Manhattan | Mechanical Systems | Relocation of kitchen and one bathroom, renovation of 2 bathrooms, add central ac, and minor partition work. No change of use egress or occupancy. | $175,000 | |
| 11 West 81 Street, Manhattan | Boiler Equipment | Replacement (1) new combination gas/oil burner on (1) existing low pressure boiler. No change in means of egress use group or occupancy. | $100,000 | |
| 266 West 91 Street, Manhattan | General construction | New partition and ceiling work, new rear yard steps to cellar, install residential elevator | $518,520 | |
| 164 West 88 Street, Manhattan | Construction Fence | Temporary plywood construction fence at rear yard in conjunction with general construction DOB now job number m01207733-i1. No change to use, egress or occupancy. | $6,000 | |
| 211 Central Park West, Manhattan | Plumbing | Plumbing work related to the interior renovation of apartment 14k on the 14th floor. No change in use, egress, or occupancy. | $63,000 | |
| 104 West 83 Street, Manhattan | Sidewalk Shed | Installation of temporary heavy duty sidewalk shed as per plans. No change in use, egress or occupancy. Sidewalk shed shall comply with chapter #33 of 2022 the NYC building code… | $1,000 | |
| 262 Central Park West, Manhattan | Plumbing | Plumbing work within existing penthouse south apartment. | $160,400 | |
| 221 West 82 Street, Manhattan | General construction | Interior renovation on apt 11e as per plans filed herewith. Related plumbing work filed as subsequent application. No change to use, egress or occupancy. | $52,500 |