Building permits in New York City, ZIP code 10075
Newest first. Checked 2026-10-01 00:02 UTC.
| Date | Address | Type | Work | Cost |
|---|---|---|---|---|
| 215 East 79 Street, Manhattan | Sidewalk Shed | installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc | $17,500 | |
| 1484 1 Avenue, Manhattan | Foundation | Underpinning in conjunction with NB # M01128646-I1 | – | |
| 1484 1 Avenue, Manhattan | Support of Excavation | Support of excavation in conjunction with NB # M01128646-I1 | – | |
| 154 East 79 Street, Manhattan | General construction | Interior non-structural demolition in conjunction with full demolition (by. SEP. App) dob#m00869454-i1. | $30,000 | |
| 66 East 79 Street, Manhattan | Mechanical Systems | Install new split system central AC system and exhaust duct for kitchen range hood for apt. 6 | $41,500 | |
| 66 East 79 Street, Manhattan | General construction | Herewith file plans to renovate apartment 6. Minor removal and construction of partitions and finishes. No change to use egress or occupancy. | $437,500 | |
| 408 East 78 Street, Manhattan | Supported Scaffold | Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this… | $2,500 | |
| 15 East 77 Street, Manhattan | Protection and Mechanical Methods | Installation of temporary roof protection as per plan. No change in use, egress or occupancy. | $1,000 | |
| 15 East 77 Street, Manhattan | General construction | The means and methods /demo sequence) for the partial demolition of an existing residential building. | $250,000 | |
| 15 East 77 Street, Manhattan | Structural | The means and methods /demo sequence) for the partial demolition of an existing residential building. | $250,000 | |
| 123 East 79 Street, Manhattan | Plumbing | Propose to cap and remove 1 commercial range, 1 char broiler and ansul system. Install new residential range as per plans filed herewith. | $15,000 | |
| 308 East 79 Street, Manhattan | Plumbing | Plumbing work for interior renovation in unit #8A | $27,000 | |
| 15 East 77 Street, Manhattan | General construction | Installation of Temporary Structure (Mock-Up) at the Roof. Mock-Up installed at the request of The Landmarks Preservation Commssion. There will be no change to use, occupancy or… | $5,000 | |
| 15 East 77 Street, Manhattan | Support of Excavation | Support of excavation related to renovation and enlargement of a single family home. No change to use, egress or occupancy. | $100,000 | |
| 15 East 77 Street, Manhattan | Foundation | Underpinning work proposed for a single family home as per plans filed herewith. No change to use, occupancy or egress. | $100,000 | |
| 15 East 77 Street, Manhattan | Structural | Structural work proposed for a single-family residence as per plans filed herewith - complete replacement of existing floor and roof framing with new slab-on-metal deck supported… | $2,062,000 | |
| 15 East 77 Street, Manhattan | Foundation | Foundation work proposed for a single-family residence as per plans filed herewith - lowering of existing cellar | $200,000 | |
| 15 East 77 Street, Manhattan | General construction | Combination of two (2) two-family dwellings & conversion to a single-family residence. Architectural work as per plans. New certificate of occupancy to be obtained. | $5,450,200 | |
| 1484 1 Avenue, Manhattan | Suspended Scaffold | Temporary multi point suspended scaffold as per drawings during nb const, filed sep. Multipoint suspended scaffold shall comply with ch 33 of the NYC bc. No change in use… | – | |
| 1484 1 Avenue, Manhattan | Supported Scaffold | Temporary pipe scaffold as per drawings. Scaffold shall comply with ch #33 of the NYC bc. No change in use, occupancy or egress under this application. | $27,900 | |
| 15 East 80 Street, Manhattan | Supported Scaffold | Installation of 300psf sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under… | $5,000 | |
| 15 East 80 Street, Manhattan | Sidewalk Shed | Installation of 300psf sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under… | $5,000 | |
| 15 East 80 Street, Manhattan | Sidewalk Shed | Installation of 300psf sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under… | $5,000 | |
| 15 East 80 Street, Manhattan | Supported Scaffold | Installation of 300psf sidewalk shed and pipe scaffolding as per plans. All equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under… | $5,000 | |
| 71 East 77 Street, Manhattan | Plumbing | Plumbing work related to the interior renovation of 2 doctor's offices in #1a and #1b on the 1st floor. No change to use, egress, or ocupancy. | $29,000 |