Building permits in New York City, ZIP code 11215
Newest first. Checked 2026-10-01 00:51 UTC.
| Date | Address | Type | Work | Cost |
|---|---|---|---|---|
| 27 Webster Place, Brooklyn | General construction | Partial demolition on existing one(1) family,two (2) story frame residential building with basement and cellar.no change in use, means of egress or occupancy. | $67,600 | |
| 363gar 5 Street, Brooklyn | Construction Fence | Installation of plywood construction fence at the subject premises. | $1,000 | |
| 415 2 Street, Brooklyn | Plumbing | Propose plumbing work as per plans from cellar to 2nd floor. No change to use, egress or occupancy. | – | |
| 385 14 Street, Brooklyn | Solar | Installation of solar PV system. No change to use, egress, or occupancy. | $46,793 | |
| 371 5 Street, Brooklyn | Plumbing | Register gas dryer. | $2,000 | |
| 379 7 Street, Brooklyn | Plumbing | Removed plumbing system on existing three(3) family,three(3) story frame residential building with cellar. | $17,000 | |
| 46 Sherman Street, Brooklyn | General construction | Application to combine existing two-family residence into a one-family residence | $96,000 | |
| 240 4 Avenue, Brooklyn | Construction Fence | Filing for construction fence PAA. | $100 | |
| 1610 10 Avenue, Brooklyn | Foundation | Foundation work for new columns and rear yard deck. | $20,000 | |
| 1610 10 Avenue, Brooklyn | Structural | Structural work in conjunction with building renovation. | $45,000 | |
| 1610 10 Avenue, Brooklyn | Mechanical Systems | Mechanical work in conjunction with building renovation. | $40,000 | |
| 1610 10 Avenue, Brooklyn | Plumbing | Plumbing work in conjunction with building renovation. | $35,000 | |
| 729 Carroll Street, Brooklyn | Sidewalk Shed | Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this… | $2,500 | |
| 245 21 Street, Brooklyn | Sprinklers | Filing for sprinkler work in conjunction with nb application #b00612705. | $30,600 | |
| 343 4 Avenue, Brooklyn | Suspended Scaffold | inspection using industrial rope access techniques and methods. See attached plans; designated primary site supervisor: GABRIEL HURTADO | – | |
| 135 Prospect Park West, Brooklyn | General construction | Filing for waterproofing, glasswork & tiling in shower/bathroom. Removal of partition walls. No change to use, occupancy or egress. | $65,000 | |
| 817 8 Avenue, Brooklyn | Plumbing | Plumbing work on floors 003 and 004 in conjunction with interior renovation and combination of units under GC application. No change in use, bulk, occupancy or egress. | – | |
| 505 9 Street, Brooklyn | Plumbing | Install 3 piece bathroom fixtures in bedroom as per plans. | $9,000 | |
| 1 Prospect Park West, Brooklyn | Sprinklers | Herewith filing temp loop sprinkler work as per plans. No change in use, egress or occupancy | $84,000 | |
| 1 Prospect Park West, Brooklyn | Sprinklers | Herewith filing sprinkler work as per plans. No change in use, egress or occupancy | $147,847 | |
| 500 4 Avenue, Brooklyn | General construction | 9th Cycle FISP Repair. No Change to Use, Egress or Occupancy. | $58,250 | |
| 333 Prospect Avenue, Brooklyn | Plumbing | Propose to replace plumbing fixtures throughout, cap & remove gas & water piping to meters. Discontinue oil tank and remove at cellar. Install new gas piping throughout as per… | $43,750 | |
| 392 5 Avenue, Brooklyn | Mechanical Systems | Install new mini-split HVAC units on the 2nd and 3rd floor residential spaces. No change in use, egress, or occupancy. | $50,000 | |
| 551 4 Street, Brooklyn | General construction | Interior bathroom renovation and repair bathroom floor of unit 1r. No changes to use, egress or occupancy under this application. | $22,991 | |
| 551 4 Street, Brooklyn | Structural | Interior bathroom renovation and repair bathroom floor of unit 1r. No changes to use, egress or occupancy under this application. | $22,991 |