201 16th Ave E
Building permits, Seattle, WA
201 16th Ave E, Seattle has 60 building permits on record. The most recent, issued Sep 10, 2026, is for addition or alteration: Construct alterations to existing hospital building (Kaiser Main Bldg.) at level 1 per plan. Mechanical included.
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Addition or alteration | Construct alterations to existing hospital building (Kaiser Main Bldg.) at level 1 per plan. Mechanical included. | $2,120,000 | |
| Addition or alteration | Construct alterations to convert Anesthesia Workroom into Clean Supply Storage room within existing institution (Kaiser Permanente Hospital) per plan. Mechanical work included… | $461,000 | |
| Addition or alteration | Construct alterations at level 1 of existing medical facility (Kaiser Permanente) for dialysis workroom (room C107) subject to field inspection (STFI) | $356,200 | |
| Addition or alteration | Tenant improvements to existing pharmacy (CHM 0B Inpatient Pharmacy) on level 0B of hospital building per plan. | $65,000 | |
| Addition or alteration | Construct alterations to existing hospital building (Kaiser Main Building) at level 3 per plan. Mechanical included. | $2,937,342 | |
| Addition or alteration | Construct tenant improvements to existing South commercial building at level 2 (Kaiser Permanente) per plan. Mechanical Included. | $396,689 | |
| Addition or alteration | Construct tenant improvements to existing commercial building (Capitol Hill Medical Center South Building) at Level 0A per plan. | $93,009 | |
| Institutional | Project includes re-roofing of the D-wing of the main building. The re-roofing scope includes removal of the existing assembly down to the structural deck and installation of new… | $1,200,000 | |
| Institutional | Project includes re-roofing of the D-wing of the Main Building. The re-roofing scope includes removal of the existing assembly down to the structural deck and installation of new… | $250,000 | |
| Addition or alteration | Tenant improvements at level 0A of existing medical care facility (Kaiser Permanente) to convert medical care room to storage occupy per plan. | $75,007 | |
| Addition or alteration | Install CT equipment in institutional building on Level A per plan. | $241,457 | |
| Addition or alteration | Install Fluoroscopy equipment in an institutional building on Level 0A room DA13 per plan. | $460,840 | |
| Addition or alteration | Renovation of examination room for the purchase and installation of a replacement DEXA machine at Capitol Hill Main Building subject to field inspection STFI. | $270,000 | |
| Addition or alteration | Construct tenant improvements to portions of the main building L2 Kaiser Permanente per plans. Mechanical included this permit | $617,939 | |
| Addition or alteration | Construct alterations and install equipment at basement level A of institutional building [KAISER PERMANENTE CHMC] per plan. Mechanical included. | $4,235,210 | |
| Addition or alteration | Construct tenant improvements to existing commercial building (South Building) level 1 per plan. | $30,000 | |
| Addition or alteration | Construct alterations in institutional building at level 3 radiology imaging room 328A [Kaiser Permanente] per plan. | $300,000 | |
| Addition or alteration | Located in Capitol Hill campus Central Main Building D-Wing of Level A. Scope of work is a tenant improvement within an existing 520 sq ft pair of imaging rooms: DA14 and DA16… | $74,000 | |
| Addition or alteration | Tenant improvements to utility/storage room 267B for Kaiser Permanente subject to field inspection (STFI) | $20,000 | |
| Addition or alteration | Construct interior alterations to existing hospital (Kaiser Permanente) at level 1 subject to field inspection (STFI). | $160,000 | |
| Addition or alteration | Construct alteration to medical imaging room in Kaiser Permanente CH per plans | $300,000 | |
| Addition or alteration | Tenant improvements for cleaning and sterilization of surgical instruments for existing medical offices (Level B Kaiser Permanente main building) subject to field inspection. | $548,000 | |
| Addition or alteration | Construct alterations in portions of Kaiser Permanente for computer infrastructure subject to field inspection STFI. | $250,000 | |
| Addition or alteration | Construct interior alterations to 3 existing rooms (rooms DB19F DB19H & DB19G) of the basement floor of existing medical building Subject to Field Inspections (STFI) | $70,000 | |
| Addition or alteration | Construct access ramp and shelter structure on portion of Kaiser Permanente Campus as permanent access to CT mobile trailer per plans. | $200,000 | |
| Addition or alteration | TI to existing hospital subject to field inspection STFI. | $600,000 | |
| Addition or alteration | Tenant improvements to level A of 'Wing D' (eastern portion) of an existing medical building subject to field inspection (STFI). | $150,000 | |
| New | Construct awning structure over above ground tanks accessory to an institution building per plan. | $70,000 | |
| Addition or alteration | Tenant improvements to waiting area and entry to Urgent Care Level 1. Subject to field inspection (STFI). | $655,000 | |
| Addition or alteration | Upgrades to kitchen equipment trims and finishes subject to field inspection (STFI). | $100 | |
| Addition or alteration | Tenant Improvements to existing MRI room level A in existing hospital. Subject to field inspection (STFI). | $25,000 | |
| Addition or alteration | Construct exterior alterations to existing Kaiser Permanente building per plan | $568,000 | |
| Addition or alteration | Construct alterations on level A of an existing hospital (LINAC room - Group Health Hospital) to replace Linear Accelerator per plan. Mechanical included. | $300,000 | |
| Addition or alteration | 3/16/2017 - CANCELLED CUSTOMER LOG #17-343Change of occupancy in Level 2 of existing hospital to medical office ambulatory surgical center occupy per plans. | $1,000 | |
| Addition or alteration | Construct interior alterations to radiology x-ray room at 3rd floor of existing medical building per floor plan subject to field inspection (STFI). | $120,000 | |
| Addition or alteration | Closed as incomplete - expired permit. Construct tenant improvement to existing office space per subject to field inspection | $17,000 | |
| Addition or alteration | Construct structural alterations to radiology x-ray room at 3rd floor of existing medical building per plan. | $10,000 | |
| Addition or alteration | Install a new 30" wide x 80" tall access door in an existing 9" thick concrete dumbwaiter shaft per plan. Access door to be located on the 6th floor of 'D' wing at existing… | $8,500 | |
| Addition or alteration | Alterations to toilet rooms on 3rd floor of existing hospital (Group Health) subject to field inspection | $650,000 | |
| Addition or alteration | Alterations to upgrade existing bathrooms for ADA on all floors per floor plans and subject to field inspection | $61,000 | |
| Addition or alteration | Tenant improvement to level B Group Health Hosipital per floor plan. Subject to field inspections. | $49,849 | |
| Addition or alteration | Tenant Improvement to existing medical clinic (Group Health) Leval A Basement per floor plan. Subject to field inspections. Stfi | $27,500 | |
| Addition or alteration | Tenant improvements to existing hospital (Group Health) level A subject to field inspection | $57,000 | |
| Addition or alteration | Interior alterations to reconfigure existing office space on A level per floor plan and subject to field inspection | $75,000 | |
| Addition or alteration | Closed as incomplete - expired permit. Tenant improvements in basement area AA42 for installation of LINAC unit in Oncology Treatment Center of Group Health Cooperative with… | $1,300,000 | |
| Addition or alteration | Interior alterations on Level B basement D wing of main building (Group Health Cooperative) per floor plan subject to field inspection (STFI). | $150,000 | |
| Addition or alteration | Replace supended ceiling portions of floors A through 6 D wing existing group health hospital per plans. | $950,000 | |
| Addition or alteration | Repalce 2 sterilizers with related wall and ceiling repairs at instrument wash and work area level 2 south building in existing hospital per floor plan and subject to field… | $6,000 | |
| Addition or alteration | Alterations to Urgent Care reception area on 1st floor per floor plan and subject to field inspection | $100,000 | |
| Addition or alteration | Alter existing spaces on 2nd and 3rd floor to convert to ADA compliant bathrooms per floor plans subject to field inspection (STFI). | $100,000 | |
| Addition or alteration | Interior alterations for ADA upgrades in Group Health Hospital Level A of the A & D Wing-Centeral Main Bldg per floor plans. Subject to field inspections. Stfi | $119,466 | |
| Addition or alteration | Tenant improvements to 3rd floor C-Wing of Group Health Cooperative per plan | $200,000 | |
| Addition or alteration | Interior tenant improvements to a portion of level A of D wing of Group Health Hospital with structural modifications in IR lab and mechanial alterations per plan. | $925,000 | |
| Addition or alteration | Alterations to existing dark room to change to PAC's reading room Floor A D wing per STFI | $10,000 | |
| Addition or alteration | interior non-structural alterations to divide existing treatment room for additional consulting room on 2nd floor of south bldg. Group Health campus subject to field inspection… | $5,000 | |
| Addition or alteration | Modifications for Medical Records Waiting & Reception area ( new cubicles)per STFI. | $150,000 | |
| Addition or alteration | Nonstructural alterations to rooms DA01 DA02 DA03 DA04 DA05 DA06 and DA23 D & E Level A Central Main Building Group Health Campus subject to field inspection. | $225,846 | |
| Addition or alteration | Reconfigure exam rooms in D wing level A SMB building per STFI | $380,000 | |
| Addition or alteration | Alterations to First Floor Bathroom Central Main Building per Plan Subject to Field Inspection (STFI). | $52,393 | |
| Addition or alteration | Non-structural interior alterations to Room AA34 (waiting area) AA31 (soild utility room) and AA23 (clean sstorage) Leval A of existing Group Health Hospital Subject to field… | $86,000 |
Checked 2026-10-01 09:30 UTC against Seattle Department of Construction and Inspections permit data. Markdown · JSON