1223 Spring St
Building permits, Seattle, WA
1223 Spring St, Seattle has 6 building permits on record. The most recent, issued Mar 19, 2025, is for multifamily: 1) Full Tear off2) Fully adhere insulation3) Fully Adhere cover board4) Fully Adhere 60mil PVC membraneEntire roof system will be installed to manufacture specifications for warran…
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Multifamily | 1) Full Tear off2) Fully adhere insulation3) Fully Adhere cover board4) Fully Adhere 60mil PVC membraneEntire roof system will be installed to manufacture specifications for… | $43,808 | |
| Addition or alteration | Construct interior alterations to northwest section of UNIT 501. Subject to field inspection (STFI). | $200,000 | |
| Addition or alteration | Closed as incomplete - expired permit. Construct interior non-structural alterations to bathrooms in unit 901 in existing condo building subject to field inspection (STFI). | $20,000 | |
| Addition or alteration | Interior alteration to Suite 900 (north unit on 9th floor) per floor plan subject to field inspection (STFI) | $150,000 | |
| Addition or alteration | Interior non-structural alterations to unit #300 on the 3rd floor of existing condominium building subject to field inspection. | $23,750 | |
| Addition or alteration | Interior non-structural alterations to unit 1200 in existing condo building subject to field inspection (stfi). | $175,000 |
Checked 2026-10-01 10:26 UTC against Seattle Department of Construction and Inspections permit data. Markdown · JSON