825 E Howard Ln
Building permits, Austin, TX 78753
825 E Howard Ln, Austin has 16 building permits on record. The most recent, issued Sep 4, 2026, is for alteration or repair: Interior remodel existing facility
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Alteration or repair | Interior remodel existing facility | – | |
| Alteration or repair | Interior remodel existing lt manuf. area. | – | |
| Alteration or repair | Interior remodel existing lt manuf. 2nd floor area. Atxt20-2 | – | |
| Alteration or repair | Interior remodel existing lt manuf. 1st floor area. SOW23-057 | – | |
| Alteration or repair | Interior Remodel Existing Admin Office Areas | – | |
| Alteration or repair | ePlan: Expedited Review - Equipment Package 2 (Mechanical Electrical Plumbing Building and Fire) for an Office/Manufacturing Bldg. (6089 SF) *Related PRs# 2020-173917 2021-005493… | – | |
| Alteration or repair | ePlan: Expedited Review - Equipment Package (Mechanical Electrical Plumbing and Fire) for an Office/Manufacturing Bldg. (250703 SF) *Related PRs# 2020-173917 2021-005493… | – | |
| Alteration or repair | ePlan: Expedited Review - Tenant Finish-Out of Level 4 - Office Space 44853 sf. | – | |
| Alteration or repair | ePlan: Expedited Review - Tenant Finish-Out Level 3 - Office Space: 44853 sf | – | |
| Alteration or repair | ePlan: Expedited Review - Tenant Finish-Out Level 2 - Office Engineering Lab Work Areas 1 2 and 3 MDF Room and Server Room(44853 sf.) | – | |
| Alteration or repair | ePlan: Expedited Review - Tenant Finish-Out Level 1 and balance of connector - Lobby Office Fitness and Locker Rooms Auditorium and Classrooms. (48688 Sf) shell office to… | – | |
| Alteration or repair | ePlan: Expedited Review - Tenant Finish-Out for Kitchen and Cafe Seating (Bldg. A connector) 9030 sf. [Building segment B and a portion of the connector to remain shell]. | – | |
| Alteration or repair | ePlan: Expedited Review - Tenant Finish-Out for Manufacturing w/ support offices (Bldg. A segment) 241043 sf. [Building segment B and a portion of the connector to remain shell]. | – | |
| New building | ePlan: Expedited Review - New Construction Accessory to Office/ Manufacturing: Dumpster Enclosure (384 sf.). | $35,000,000 | |
| New building | ePlan: Expedited Review - New Construction Accessory to Office/ Manufacturing: New Hazardous Materials Storage Bldg. (1500 sf.). | $35,000,000 | |
| New building | ePlan: Expedited Review - New Construction 4 Story Office(193005 sf) connected to Manufacturing / Warehouse (202583 sf.) BOTH TO REMAIN SHELL - NOT FOR OCCUPANCY. | $35,000,000 |
The city hasn't published new permit data in 23 days, so recent permits may be missing.
Austin Development Services Department last updated its data Sep 7, 2026. We checked it 2026-10-01 12:49 UTC. Official data.