Building permits in Austin 78719
Newest first.
| Date | Address | Type | Work | Cost |
|---|---|---|---|---|
| 3600 Presidential Blvd Bldg 7035 | Alteration or repair | ePlan: BAUS Review - Interior Remodel on Apron Level for Southwest Airlines (3900 SF). | – | |
| 9402 Freight Ln | Alteration or repair | ePlan: BAUS Review - Interior Office Block Fit Out of the KAUS Air Cargo Building (6711 SF). | – | |
| 10113 Maintainers Dr Unit Mc1 | New building | Install new electrical service for maintenance ramp expansion WO 687379 | – | |
| 9402 Freight Ln Unit A | Alteration or repair | Assemble Starco modular office pods in the interior of the warehouse facility | – | |
| 3600 Presidential Blvd | Alteration or repair | ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF) | – | |
| 3600 Presidential Blvd | Alteration or repair | Interior renovations with an existing building for virtual ramp control system improvements. Electrical and communications work proposed (3011 Employee Ave). [Landside Permits] | – | |
| 3600 Presidential Blvd | Alteration or repair | (3600 Presidential Blvd) Interior renovations within an existing building for virtual ramp control system improvements; includes finishing of existing space (paint carpet… | – | |
| 3600 Presidential Blvd | Alteration or repair | Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in… | – | |
| 3600 Presidential Blvd | Alteration or repair | FIS- Expansion that will reconfigure the Existing Bag Claim system to be used as Domestic/ International. Expansion includes reconfiguring the inbound | – | |
| 10000 Logistics Ln | Demolition | Total demo of 28000 steel concrete brick circa 2014 | – | |
| 2901 S Us 183 Hwy Nb | New building | BAUS - Airport Project: Install Necessary Fuel Infrastructure and Equipment to Support a Future Concourse hydrant fuel system and receipt of jet fuel via pipeline. | $15,000,000 | |
| 3600 Presidential Blvd Unit 3264 | Alteration or repair | Remodel office area within existing retail store. (Abia) | – | |
| 2716 Spirit Of Texas Dr Bldg 6005 | Alteration or repair | Interior renovations to existing building addition of new fire suppression system update mechanical and electrical systems PuPR2 | – | |
| 3600 Presidential Blvd | New building | ePlan: BAUS - Airport Project: Installation of a temporary hanging scaffold system to limit impacts to the existing bagging claim level of the AUS Barbara Jordan Terminal during… | – | |
| 3600 Presidential Blvd | Alteration or repair | Interior Renovation of existing public restrooms within Austin-Bergstrom International Airport including selective demolition architectural finishes plumbing fixture replacement… | – | |
| 3600 Presidential Blvd | New building | Installation of fourteen (14) 40x8 intermodal shipping containers 12 of which will be connected via pre-engineered pre-manufactured roof systems (3 roof systems connecting 4… | $850,000 | |
| 3600 Presidential Blvd | New building | ePlan: BAUS - Airport Project: 2D and 3D Art Installation Inside and Extending out of the Three Skylights over the Atrium Infill Area. The Artwork will Include Sculptural Bird… | $1,000,000 | |
| 3200 Spirit Of Texas Dr | Alteration or repair | BAUS: GSE Renovation - New Triturator Wash Bay. | – | |
| 10401 Golf Course Rd Unit A | Demolition | Demolition of the Golf Course Building approximately 573 square feet circa 1956. 2025 132306 DA - Approved ... | – | |
| 3600 Presidential Blvd | Alteration or repair | Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 22 and 23. Exterior 2… | – | |
| 3600 Presidential Blvd | New building | ePlan: AUS Commercial Expedited Review - Steel frame for Terminal Expansion Phase II C To be installed by Artist in the West Gate Expansion Area of the Terminal Scope of Work Will… | $205,000 | |
| 3600 Presidential Blvd Unit 3797a | Alteration or repair | BAUS Review: Interior Remodel to Existing Retail Space located in ABIA Terminal (1250 SF). | – | |
| 3600 Presidential Blvd | Alteration or repair | A suspended artwork will be installed in the interior of the Austin-Bergstrom International Airport (AUS) terminal near Gate 15. A fire review of the artwork design is needed. The… | – | |
| 3600 Presidential Blvd Unit 3703 | Alteration or repair | Interior tenant alteration of existing space to upfit new tenant kendra scott | – | |
| 3600 Presidential Blvd | Alteration or repair | ePlan: BAUS Review - Installation of Ramp Information Displays (RIDS) and Gate Information Displays (GIDS) for Southwest Airlines on the ramp level and holdrooms of gates 14-21… | – |
The city hasn't published new permit data in 23 days, so recent permits may be missing.
Austin Development Services Department last updated its data Sep 7, 2026. We checked it 2026-10-01 15:23 UTC. Official data.