1600 Commerce St
Boulder, CO 80301
200 permits on record here. The newest, Aug 18: Replace existing fire riser in AD-O Building after old Fire Line is replaced. Boulder publishes permits without map coordinates, so this address has no map and no quarter-mile list.
Here200 permits · 1600 Commerce St
-
Aug 18$3,000
-
Fire Alarm PermitFire systemsJun 26$9,827
-
Jun 25$81,348
-
Install a new wet pipe fire sprinkler system off of the existing sprinkler system below a 511 sq.ftFire systemsJun 22$8,500
-
Apr 24$40,000
-
3277 sf remodel of an existing lab space to meet new program requirementsAlteration or repairMar 18$515,416
-
Feb 27$5,218
-
Feb 27$14,394
-
Installing a Pre-Action SystemFire systemsFeb 19$98,000
-
Jan 12$75,000
-
4,599 sf remodel of an existing cleanroom and supporting spaces to meet new program requirementsAlteration or repairDec 12, 2025$5,197,706
-
Cut into the existing 4" main in the stairwell & Install a new 4" pup piece to serve as the new branch line…Fire systemsNov 5, 2025$6,500
-
Oct 8, 2025$3,500
-
Oct 2, 2025not listed
-
Sep 8, 2025$3,115,171
-
Aug 29, 2025$15,367
-
Install a new pre-action system with VESDA detection and fire/life safety devices for the new secured clean…Fire systemsAug 22, 2025$36,179
-
Aug 5, 2025$7,500
-
Upgrades to FT Clean Room 5 & 6Fire systemsJul 17, 2025$75,000
-
May 14, 2025$1,225,000
-
180-day one-time extension request grantedAlteration or repairMay 13, 2025$1,033,500
-
Electrical panel UpgradeElectricalApr 1, 2025$8,000
-
The project consists of replacing two 2000kva dry type transformers and two 3000a switchgears with one new…Alteration or repairMar 27, 2025$2,517,285
-
Fire/life safety system (fati)Fire systemsMar 26, 2025$8,100
-
Mar 11, 2025$3,000
-
Provide new conduit and wire to replace compromised underground conduit and conductors for the FM (42,299 sf)…Alteration or repairMar 10, 2025$40,000
-
Feb 25, 2025$49,429
-
Remodel of existing cleanrooms and ajdacent spaces to support the replacement of existing HEPA filters and…Alteration or repairJan 31, 2025$350,000
-
Interior testing equipment access platform (400sf)Alteration or repairJan 29, 2025$225,000
-
Removal and replacement of 15 new Fan Coil UnitsMechanical (HVAC)Nov 7, 2024$267,368
-
Like for Like swap of 2 - Modular Boiler Model: CBT-M-700-40-150ST(115/1/60) Falcon-STDMechanical (HVAC)Nov 7, 2024$301,900
-
4,735 SF project in an existing workspace within an existing building to support the improvement of existing…Alteration or repairOct 31, 2024$548,408
-
Fire alarm power supply and revisions (fati)Fire systemsOct 28, 2024$19,897
-
Oct 11, 2024$33,276
-
Cosco Fire Protection will addFire systemsOct 9, 2024$15,231
-
Oct 9, 2024$14,300
-
2,576 SF remodel of an existing lab space to meet new program requirementsAlteration or repairSep 30, 2024$642,281
-
Remodel of an existing 2,525 sf space in an existing building consisting of cleanroomsAlteration or repairSep 25, 2024$400,000
-
Aug 13, 2024$8,658
-
Interior renovation of existing fourth floor office areaAlteration or repairAug 7, 2024$743,010
-
T.I.-Install a new Waveguide feed-though provided by ball and install 1 new sidewall in the Ante RoomFire systemsMay 17, 2024$675
-
May 15, 2024$3,464,559
-
Feb 27, 2024$1,700
-
Feb 27, 2024$1,699
-
Replace 49 light fixtures in North parking lot to comply with Boulder Outdoor Compliance OrdinanceElectricalDec 26, 2023$59,000
-
Add one smoke detector above the existing FACPFire systemsNov 21, 2023$6,500
-
1305 square foot remodel of an existing chamber and adjacent rooms in an existing building to upgrade the…Alteration or repairOct 4, 2023$421,281
-
Modify the existing fire alarm system to accommodate an expansion of the small bakeout chamberFire systemsOct 3, 2023$20,000
-
Oct 3, 2023$17,000
-
Sep 19, 2023$6,897
-
Shaker ReplacementElectricalSep 11, 2023$31,900
-
Additions / alterations to the existing wet pipe fire sprinkler system in a partially sprinkler protected…Fire systemsAug 15, 2023$14,685
-
Interior renovation to a Business Occupancy building for two spacesAlteration or repairAug 1, 2023$275,417
-
Jul 26, 2023not listed
-
1,218 remodel of an existing space in a building to provide supporting equipment for a new shakerAlteration or repairJul 26, 2023$200,000
-
Demo 27 existing K8.0 pendent fire sprinklers and Install 29 new K8.0 chrome pendent type sprinklersFire systemsJun 23, 2023$22,000
-
May 4, 2023$2,079,909
-
May 4, 2023$1,909,550
-
Install 14 new chrome recessed type fire sprinklers after new ceiling has been installedFire systemsMar 21, 2023$8,700
-
Fire alarm system addition: voice evacFire systemsDec 19, 2022$36,619
-
Scope of work includes adjustments to interior office space by adding a partition to break out a separate roomAlteration or repairNov 16, 2022$187,374
-
Oct 27, 2022$4,956
-
Additions / alterations to the existing wet pipe fire sprinkler system to accommodate a tenant finishFire systemsOct 21, 2022$17,500
-
Oct 19, 2022$13,065
-
Aug 18, 2022not listed
-
*Voided for inactivity - no inspections within 180 days* Construction Trailer Permit applicationOtherJul 5, 2022not listed
-
Apr 11, 2022$25,000
-
*Build out of the Vibration Laboratory within the Fisher BuildingMechanical (HVAC)Apr 11, 2022$510,000
-
Apr 11, 2022$600,000
-
*Build out of the Vibration Laboratory within the Fisher BuildingAlteration or repairApr 11, 2022$2,600,000
-
Install sprinkler system in new paint booth and walk-in oven per NFPA 13 and NFPA 33 (FSR13)Fire systemsMar 31, 2022$11,200
-
Installation of GFS Downdraft paint booth and Walk-in Oven with all associated power and controlsPlumbingFeb 25, 2022$96,000
-
Installation of GFS Downdraft paint booth and Walk-in Oven with all associated power and controlsMechanical (HVAC)Feb 25, 2022$500,000
-
Installation of GFS Downdraft paint booth and Walk-in Oven with all associated power and controlsElectricalFeb 25, 2022$350,000
-
Installation of GFS Downdraft paint booth and Walk-in Oven with all associated power and controlsAlteration or repairFeb 25, 2022$1,635,000
-
Dec 16, 2021$6,613
-
Dec 16, 2021$26,809
-
F1-3 Interior remodel of an existing office space for a new server roomAlteration or repairDec 16, 2021$54,560
-
Dec 10, 2021$76,021
-
Dec 10, 2021$25,860
-
BLDR-21 Interior remodel of an existing office space for a new server roomAlteration or repairDec 10, 2021$114,212
-
Interior remodel of an existing office space for a new server roomMechanical (HVAC)Dec 9, 2021$7,218
-
Dec 9, 2021$25,830
-
BLDR- 20 Interior remodel of an existing office space for a new server roomAlteration or repairDec 9, 2021$39,132
-
Nov 19, 2021$13,462
-
Oct 19, 2021not listed
-
Sep 20, 2021$71,769
-
Existing single floor electrical room to be demoed and replaced with new two floor electrical roomFire systemsSep 7, 2021$8,200
-
Existing buildingFire systemsSep 7, 2021$65,600
-
Jul 27, 2021$98,854
-
Provide and install functioning fire wire system for the remodeled horizontal boring machine spaceFire systemsJul 22, 2021$5,432
-
*Build out of control room, anteroom and cleanroom 4 in the Fisher Integration (FI) BuildingPlumbingJul 13, 2021$219,461
-
*Building is max'ed out for power so this project is adding a second floor to the existing main electrical…Mechanical (HVAC)Jul 13, 2021$15,652
-
*Build out of control room, anteroom and cleanroom 4 in the Fisher Integration (FI) BuildingMechanical (HVAC)Jul 13, 2021$1,000,000
-
Jul 13, 2021$639,645
-
*Build out of control room, anteroom and cleanroom 4 in the Fisher Integration (FI) BuildingElectricalJul 13, 2021$433,051
-
*Building is maxed out for power so this project is adding a second floor to the existing main electrical…Alteration or repairJul 13, 2021$922,722
-
*Build out of control room, anteroom and cleanroom 4 in the Fisher Integration (FI) BuildingAlteration or repairJul 13, 2021$4,119,113
-
*Voided for inactivity - no inspections within 180 days* Installing a new dedicated exhaust system for oil /…Mechanical (HVAC)Jul 12, 2021$83,279
-
Jul 12, 2021$2,530
-
Jul 7, 2021$25,000
-
Remodel and conversion of an existing 1071 square foot storage space in a metal building built off of the…Mechanical (HVAC)Jul 7, 2021$150,000
-
Jul 7, 2021$55,000
-
KRM Remodel and conversion of an existing 1071 square foot storage space in a metal building built off of the…Alteration or repairJul 7, 2021$489,795
-
Jul 2, 2021$11,220
-
Mar 26, 2021$25,000
-
Mar 26, 2021$9,000
-
*Interior remodel of an existing bathroom for ADA accommodationAlteration or repairMar 26, 2021$80,000
-
*Removal of kathabar unit, replace with new roof top unit and associated structural modificationsMechanical (HVAC)Mar 4, 2021$628,673
-
*Removal of kathabar unit, replace with new roof top unit and associated structural modificationsElectricalMar 4, 2021$43,664
-
*Removal of kathabar unit, replace with new roof top unit and associated structural modificationsAlteration or repairMar 4, 2021$628,673
-
*Voided for inactivity - no inspections within 180 days* KRMReplace existing DX fan coil and condenser with…Mechanical (HVAC)Feb 10, 2021$113,589
-
Relocate one sprinkler head and change out 6 to accommodate remodel of bathrooms to meet accessibility…Fire systemsFeb 9, 2021$2,000
-
Jan 27, 2021$10,017
-
Install new wet pipe fire sprinkler system to provide protection to an existing lab areaFire systemsJan 26, 2021$21,300
-
*Installation of a GFS down-draft paint booth (water-based non-flammable paint) with all associated power and…Mechanical (HVAC)Jan 13, 2021$241,080
-
Jan 13, 2021$35,367
-
*Installation of a GFS down-draft paint booth (water-based non-flammable paint) with all associated power and…Alteration or repairJan 13, 2021$457,320
-
Add 4 pendent type heads in the Paint BoothFire systemsJan 8, 2021$16,500
-
*Upgrade Electrical GearElectricalDec 22, 2020$225,946
-
Jul 22, 2020$37,616
-
Jun 9, 2020$16,000
-
Demo the existing wet sprinkler and piping in the space and install a new pre-action type system with Galv…Fire systemsMay 28, 2020$42,400
-
Exterior lighting upgrades to comply with the Outdoor Lighting OrdinanceAlteration or repairApr 30, 2020$40,884
-
Apr 29, 2020$11,630
-
Apr 1, 2020$32,000
-
Tenant Remodel of existing tenant space at Ball Aerospace to create a new clean room area with 3 secured labs…Mechanical (HVAC)Mar 6, 2020$416,973
-
Mar 6, 2020$338,434
-
Tenant remodel of existing tenant space at Ball Aerospace to create a new clean room area with 3 secured labs…Alteration or repairMar 6, 2020$720,157
-
Mar 2, 2020$20,000
-
L. Nothhaft & Son shall modify the existing preaction fire sprinkler system located at Ball Aerospace…Fire systemsFeb 21, 2020$45,570
-
Tenant remodel of existing tenant space (Highbay Space) at Ball Aerospace to recreate a clean room with…Mechanical (HVAC)Feb 4, 2020$350,000
-
Feb 4, 2020$95,000
-
Tenant remodel of existing tenant space (Highbay Space) at Ball Aerospace to recreate a clean room with…Alteration or repairFeb 4, 2020$1,325,000
-
Addition of supplemental cooling and humidifier for clean room tent space at Ball AerospaceMechanical (HVAC)Jan 16, 2020$67,931
-
Jan 2, 2020$24,500
-
Ball FA-1 Aquila Clean Tent Pre Action SystemFire systemsDec 26, 2019$7,782
-
Dec 19, 2019$33,397
-
Dec 11, 2019$12,000
-
Relocate 6 existing SR SSP headsFire systemsNov 21, 2019$14,250
-
Provide a new remote power supply and Fire Alarm notification in a remodeled space in an existing buildingFire systemsNov 19, 2019$5,300
-
Relocate existing metrology lab in the Fisher Manufacturing building to the Fisher Assembly buildingPlumbingOct 9, 2019$15,000
-
Relocate existing metrology lab in the Fisher Manufacturing building to the Fisher Assembly buildingMechanical (HVAC)Oct 9, 2019$120,000
-
Relocate existing metrology lab in the Fisher Manufacturing building to the Fisher Assembly buildingElectricalOct 9, 2019$125,000
-
Relocate existing metrology lab in the Fisher Manufacturing building to the Fisher Assembly buildingAlteration or repairOct 9, 2019$600,000
-
Sep 9, 2019$16,200
-
Ball FM Highbay T.B. PreAction Fire Alarm SystemFire systemsAug 22, 2019$10,277
-
Jul 1, 2019$51,250
-
Interior tenant remodel for the third floor suite of the FA Building on the Ball CampusMechanical (HVAC)Jul 1, 2019$1,075,000
-
Jul 1, 2019$540,000
-
Interior remodel of 557 sf to remove stair and fill openingAlteration or repairJul 1, 2019$28,931
-
Interior tenant remodel for the third floor suite of the FA Building on the Ball CampusAlteration or repairJul 1, 2019$3,042,116
-
The existing wet pipe fire sprinkler system shall be un-installed and a new wet pipe system shall be…Fire systemsJun 25, 2019$95,750
-
May 30, 2019$7,726
-
Permit for the construction a isolation enclosure in an existing high bay facility to surround an article for…Mechanical (HVAC)May 30, 2019$5,514
-
May 30, 2019$23,468
-
Permit for the construction an isolation enclosure in an existing high bay facility to surround an article…Alteration or repairMay 30, 2019$227,825
-
Fire Alarm - Pre Action SystemFire systemsMar 21, 2019$6,650
-
Double interlock preaction (dry) system Ball Aeorspace Altitude Test Chamber using FM guidelinesFire systemsFeb 22, 2019$24,000
-
Feb 4, 2019$1,106,402
-
Jan 7, 2019$20,000
-
Ball Aerospace D Chamber Fire DetectionFire systemsDec 14, 2018$55,334
-
Dec 13, 2018$13,000
-
Nov 13, 2018$365,858
-
Nov 7, 2018$5,800
-
Work to be done on the 3rd floorFire systemsOct 29, 2018$15,480
-
Oct 16, 2018$45,000
-
Fire Sprinkler System in Highbay CleanroomFire systemsOct 12, 2018$55,560
-
Tenant interior remodel of support areas for an existing high bay process area for Ball AerospaceMechanical (HVAC)Sep 26, 2018$300,000
-
Tenant interior remodel of support areas for an existing high bay process area for Ball AerospaceElectricalSep 26, 2018$200,000
-
Tenant interior remodel of support areas for an existing high bay process area for Ball AerospaceAlteration or repairSep 26, 2018$695,920
-
Sep 13, 2018$24,521
-
Sep 7, 2018$22,000
-
Tenant remodel, 5700 sf. of existing office space on the third floor of the FA buildingMechanical (HVAC)Sep 7, 2018$100,000
-
Sep 7, 2018$225,000
-
Tenant remodel, 5700 sf. of existing office space on the third floor of the FA buildingAlteration or repairSep 7, 2018$800,000
-
Fire Sprinklers in EMI Chamber at FA BuildingFire systemsAug 22, 2018$32,700
-
Aug 6, 2018$11,599
-
May 25, 2018$17,900
-
Remodel of the high bay facility for placement of a new EMI (Electromagnetic Interference) chamberMechanical (HVAC)May 24, 2018$118,097
-
Remodel of the high bay facility for placement of a new EMI (Electromagnetic Interference) chamberElectricalMay 24, 2018$56,508
-
Remodel of the high bay facility for placement of a new EMI (Electromagnetic Interference) chamberAlteration or repairMay 24, 2018$660,987
-
May 11, 2018$49,370
-
Temporary 10' x 36' construction trailer on west side of existing Ball Aerospace buildingNew buildingMar 26, 2018$5,900
-
Mar 26, 2018$360
-
Mar 7, 2018$66,000
-
Tenant finish of an existing core/shell area within the Fisher Complex building for the installation of a…Mechanical (HVAC)Mar 7, 2018$1,250,000
-
Mar 7, 2018$770,000
-
Tenant finish of an existing core/shell area within the Fisher Complex building for the installation of a…Alteration or repairMar 7, 2018$829,695
-
Mechanical and electrical work for replacement of a compressed air system for Ball AerospaceMechanical (HVAC)Feb 22, 2018$126,327
-
Mechanical and electrical work for replacement of a compressed air system for Ball AerospaceElectricalFeb 22, 2018$26,806
-
Feb 16, 2018$9,552
-
Fire Alarm - 3rd floor North sideFire systemsFeb 16, 2018$8,225
-
Convert existing offices 3C638Mechanical (HVAC)Feb 6, 2018$144,199
-
Convert existing offices 3C638ElectricalFeb 6, 2018$93,845
-
Convert existing offices 3C638Alteration or repairFeb 6, 2018$418,604
-
STructural permit to remove an existing RTU from roof to be replaced with an RTU on a new concrete pad at…Mechanical (HVAC)Dec 26, 2017$65,000
-
STructural permit to remove an existing RTU from roof to be replaced with an RTU on a new concrete pad at…Alteration or repairDec 26, 2017$10,000
Boulder Planning and Development Services updated its data Oct 6, 2026. We checked it Oct 7, 08:00 UTC. See the city's official records.
At this address: every permit the city holds. Nearby: permits from the last two years, from our copy of the city's data.
For agents and scripts: This page as Markdown · JSON · Nearby as JSON · MCP tool permits_near