Partial plumbing line replacement of existing failing plumbing lines
Alteration or repair at 350 Ponca Pl, Boulder
Boulder Planning and Development Services permit BLD-MFD2026-00050: issued Jul 8, 2026 for alteration or repair work at 350 Ponca Pl. Partial plumbing line replacement of existing failing plumbing lines. 8/26/26 Revised the drawings to fill in the openings in the floor at the plumbing risers rather than creating vertical shafts. Changes to the drawings include the following: 1. G0.01 a. Updated Sheet Index for added sheet A5.10 b. Updated shaft wall details. 2. A2.11 a. Updated Floor Plan Legend referencing UL details and Engineering Report for floor infill. 3. A2.12 a. Updated Floor Plan Legend referencing UL details and Engineering Report for floor infill. 4. A5.10 a. Added Engineering Judgement and UL detail for floor infill.
- Permit number
- BLD-MFD2026-00050
- Issued
- Type of work
- Alteration or repair
- Status
- Issued
- Reported cost
- $1,278,086
- ZIP code
- 80303
- City's category
- Building Permit - Multifamily, Repair
- City's status
- Issued
- Source
- Boulder Planning and Development Services permit data (this record)
Type of work and status are our own standard labels, so permits compare across cities. The city's wording is in the "City's category" and "City's status" rows. We show costs under $100 as not listed, because filers often enter $0 or $1 when the city doesn't require a cost.
All permits at 350 Ponca Pl, and what's permitted nearby
Boulder Planning and Development Services updated its data Oct 7, 2026. We checked it Oct 7, 12:50 UTC. See the city's official records.
For agents and scripts: This page as Markdown · JSON