Total tear-off & reroof
Roofing at 4625 Broadway, Boulder
Boulder Planning and Development Services permit RFG2022-00790: issued Aug 25, 2022 for roofing work at 4625 Broadway. Total tear-off & reroof (or Roof Overlay ? specify scope), 2 squares of modified bituminous on a pitch represented as 3/12. All roof materials shall be installed per manufacturer?s specs. Pre-roof inspection required for overlays if pitch is less than 4/12. Mid-roof inspection for all re-roofs required if pitch is less than 4/12. Class A roof assembly as tested in accordance with ASTM Standard E 108 or UL Standard 790 required. 2020 City of Boulder Energy Conservation Code (COBECC) insulation requirements apply (R-33 for insulation entirely above deck, R-53 for structures with insulation in attic spaces below deck) unless the scope does not expose insulation (either above or below deck). Roofs without sufficient insulation in the cavity or on the deck and where the insulation is exposed during reroofing shall be insulated either above or below the sheathing. At inspection, provide to building inspection staff original wrappers of materials used or applied. Provide additional information -- such as manufacturer's cut sheet for other products used - including, but not limited to, items such as flashing, valley material, sealants, fasteners, ventilation devices or features and roof jacks & penetration boots. Irrigation Shed.
- Permit number
- RFG2022-00790
- Issued
- Type of work
- Roofing
- Status
- Finished
- Reported cost
- $3,000
- ZIP code
- 80304
- City's category
- Roofing Replacement Permit, Roofing Replacement Permit
- City's status
- Letter of Completion
- Source
- Boulder Planning and Development Services permit data (this record)
Type of work and status are our own standard labels, so permits compare across cities. The city's wording is in the "City's category" and "City's status" rows. We show costs under $100 as not listed, because filers often enter $0 or $1 when the city doesn't require a cost.
All permits at 4625 Broadway, and what's permitted nearby
Boulder Planning and Development Services updated its data Oct 6, 2026. We checked it Oct 6, 11:18 UTC. See the city's official records.
For agents and scripts: This page as Markdown · JSON