Nearby Permits

All Structures must be permitted separately Total Roof Overlay

Roofing at 2600 Canyon Blvd, Boulder

Boulder Planning and Development Services permit RFG2025-00674: issued Aug 29, 2025 for roofing work at 2600 Canyon Blvd. All Structures must be permitted separately Total Roof Overlay, 51.91 squares of Single Ply Membrane on a pitch represented as less than 2/12. All roof materials shall be installed per manufacturer?s specs.? Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). Pre-roof inspection required for all overlays. ?Class A roof assembly as tested in accordance with ASTM Standard E 108 or UL Standard 790 required. 2020 City of Boulder Energy Conservation Code (COBECC) insulation requirements apply (R-33 for insulation entirely above deck, R-53 for structures with insulation in attic spaces below deck) unless the scope does not expose insulation (either above or below deck). Roofs without sufficient insulation in the cavity or on the deck and where the insulation is exposed during reroofing shall be insulated either above or below the sheathing.? ?At inspection, provide to building inspection staff original wrappers of materials used or applied. Provide additional information -- such as manufacturer's cut sheet for other products used - including, but not limited to, items such as flashing, valley material, sealants, fasteners, ventilation devices or features and roof jacks & penetration boots.? Attention: Wind speed requirements for Flat Membrane Roof Assemblies To ensure the safety and structural integrity of buildings within the City of Boulder, the following wind speed verifications are needed for all flat roof membrane assemblies: ? 1.? Engineered Design: A comprehensive engineered design for the flat membrane roof assembly must be submitted at the time of permit application. This design should detail all aspects of the assembly, including materials, installation methods, and load calculations, and number and layout of fasteners to achieve wind speed requirements. ? 2.? Alternative Option: Engineer?s Letter: As an alternative to submitting the full engineered design at the time of permit application, a stamped and signed letter from a qualified engineer will be accepted. This letter must be provided at the time of the mid-roof inspection. The letter should certify that the installed roof membrane assembly meets all applicable building codes and safety standards, based on an engineering review of the installation. Mid-roof inspection still needed to verify class A Fire Rated Assembly. If you have any questions or need further clarification, please contact the City of Boulder Planning and Development Services Dept through Inquire Boulder at https://user.govoutreach.com/boulder/faq.php?cmd=shell.?

Permit number
RFG2025-00674
Issued
Type of work
Roofing
Status
Finished
Reported cost
$47,250
ZIP code
80302
City's category
Roofing Replacement Permit, Roofing Replacement Permit
City's status
Letter of Completion
Source
Boulder Planning and Development Services permit data (this record)

Type of work and status are our own standard labels, so permits compare across cities. The city's wording is in the "City's category" and "City's status" rows. We show costs under $100 as not listed, because filers often enter $0 or $1 when the city doesn't require a cost.

All permits at 2600 Canyon Blvd, and what's permitted nearby

Boulder Planning and Development Services updated its data Oct 15, 2026. We checked it Oct 15, 12:14 UTC. See the city's official records.