All Structures must be permitted separately Total tear-off & reroof of SFD
Roofing at 835 Yellow Pine Ave, Boulder
Boulder Planning and Development Services permit RFG2026-00843: issued Sep 23, 2026 for roofing work at 835 Yellow Pine Ave. All Structures must be permitted separately Total tear-off & reroof of SFD, 17.16 squares of dimensional shingles on a pitch represented as 10/12. All roof materials shall be installed per manufacturer?s specs. Mid-roof inspection is required if 1) pitch is less than 4/12 or 2) for any roof type other than asphalt shingles (regardless of pitch). Pre-roof inspection required for all overlays. At mid-roof inspection, to ensure the safety and structural integrity of flat-roof buildings within the City of Boulder, a stamped and signed letter from a qualified engineer must be provided. The letter should certify that the installed roof membrane assembly meets all applicable building codes and safety standards, including wind speed verifications, based on an engineering review of the installation. All roof covering materials shall be listed as Class A as tested in accordance with UL Standard 790 or ASTM Standard E 108. At inspection, provide to building inspection staff original wrappers of materials used or applied. Provide additional information -- such as manufacturer's cut sheet for other products used - including, but not limited to, items such as flashing, valley material, sealants, fasteners, ventilation devices or features and roof jacks & penetration boots.
- Permit number
- RFG2026-00843
- Issued
- Type of work
- Roofing
- Status
- Issued
- Reported cost
- $13,860
- ZIP code
- 80304
- City's category
- Roofing Replacement Permit, Roofing Replacement Permit
- City's status
- Issued
- Source
- Boulder Planning and Development Services permit data (this record)
Type of work and status are our own standard labels, so permits compare across cities. The city's wording is in the "City's category" and "City's status" rows. We show costs under $100 as not listed, because filers often enter $0 or $1 when the city doesn't require a cost.
All permits at 835 Yellow Pine Ave, and what's permitted nearby
Boulder Planning and Development Services updated its data Oct 6, 2026. We checked it Oct 6, 16:08 UTC. See the city's official records.
For agents and scripts: This page as Markdown · JSON