201 E Chestnut St, Chicago has 39 building permits on record. The most recent, issued Apr 2, 2026, is for mechanical (hvac): Ductwork extension/reconfiguration, repair/replacement affecting 1 systems : 1 duct furnace(sterling qvsd 400m) . Electrical work under this permit = no . Locations: 0 residential …
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Mechanical (HVAC) | Ductwork extension/reconfiguration, repair/replacement affecting 1 systems : 1 duct furnace(sterling qvsd 400m) . Electrical work under this permit = no . Locations: 0 residential… | $437,825 | |
| Elevator | Modernization of (2) two ewgt to eg passenger elevators, 2500lbs capacity @ 350 fpm, 25 stops, pursuant to scope of work submitted and subject to city of chicago dept. Of… | $1,000,000 | |
| Plumbing | Repair or in-kind replacement of 1 plumbing fixtures as described in permit application. Includes repair or replacment of plumbing piping. Locations: 1 residential unit(s), 0… | $1,500 | |
| Fence, wall or deck | Balcony door and window perimeter joint repairs and fire door repairs | $18,692 | |
| Scaffold or sidewalk shed | Erect one (1) scaffold dates 03/22/2022 through 03/22/2023 | $111 | |
| Electrical | Retorfitting existing fluorcent lighting with UL listed led lighting | $15,900 | |
| Other | Shelf angle flashing installation | $29,560 | |
| Scaffold or sidewalk shed | Erect 3 scaffold from 8-30-2019 to 8-30-2020 | – | |
| Fence, wall or deck | Repair concrete to garage only. | $300,226 | |
| Scaffold or sidewalk shed | Erect four scaffolds from 06/11/2018 to 06/11/2019. | – | |
| Electrical | Update existing outlets, install pendant light and switch, relocate light fixture and outlet | $1,100 | |
| Fence, wall or deck | All elevations, repair/replace concrete slabs 2000 sq.ft. Repair/replace deck coating, repair/replace railing systems as per drawings, only. | $2,584,736 | |
| Scaffold or sidewalk shed | Erect 4 scaffolds from july 1 2017 to july 1 2018. | – | |
| Elevator | Replace hoist ropes on #1 car, 2500#, 24 floors | $6,000 | |
| Roofing | Tear off and replace roof | $19,150 | |
| Scaffold or sidewalk shed | Erect (1) mkd modular scaffold from 8-19-15 to 8-18-16 | – | |
| Electrical | Install 2 can lights, install exhaust fan, relocate existing outlet, install new outlet, install floor board heater, install new light,, install wall sconces, run 20amp | $2,500 | |
| Scaffold or sidewalk shed | Erect 1 scaffold from 11/3/14 to 11/3/15 | – | |
| Fire systems | Installation of one-way & two-way voice communication system per sect.#13-196-204. No elevator re call in part of the scope. B,1-26+2ph fls. CK#58366;$500.00. | – | |
| Electrical | Relocation existing light fixtures on stairwells | $3,000 | |
| Alteration or repair | Replace 43 existing stairwell doors with new 90 minute fire rated doors. All work sae | $94,000 | |
| Plumbing | Hot water heater (replacement only): qty 1 | $750 | |
| Electrical | Installation of electrical timer switch | $450 | |
| Electrical | Seneca & chestnut dc connection to new upgrade system module. | $1,000 | |
| Roofing | Remove\replace roof. | $376,902 | |
| Alteration or repair | Repairs to existing exterior vaulted sidewalk on private property-no structural | $78,854 | |
| Scaffold or sidewalk shed | Erect 1 hi lo climbers scaffold from 11/10/10 to 11/10/11 | – | |
| Electrical | Replace loadcenter & reattach existing circuits | $700 | |
| Electrical | Installation of equipment box for upgrade in phone service. Box requires one (1) 30amp circuit breaker installed in existing 120/240v telco room for repeater antenna. | $1,000 | |
| Electrical | Installation of a low voltage alarm system | – | |
| Fence, wall or deck | Tuckpoint 500 sq.ft. Remove/replace 25 sq.ft. Of brick, 100 SQ. FT. Of individual brick at various locations, install flashing system at 35 l.f. Of window / balcony lintels… | $174,000 | |
| Scaffold or sidewalk shed | Erect 2 hi lo climber scaffolds for necessary exterio wall repair from 07/08/2008 to 07/08/2009. | – | |
| Fence, wall or deck | Remove existing york condensing unit and replace with one carrier 30 ton condensing unit. Two compressors,r-22,air cooled,remote,located penthouse above garage. | – | |
| Other | Replace 1 air handling unit and 2 gas fired duct heaters | – | |
| Other | Replace gas fired make up air unit | – | |
| Plumbing | Hot water heater (replacement only): qty 1 | $1,000 | |
| Roofing | Remove and replace modified bitumen roofing system at front entrance roof. All work same as existing | $28,750 | |
| Fence, wall or deck | Removing coping on west and south elevations, repair parapet wall remove and replace (inner and outer whyte) all elevations, garage work remove and replace 75 bricks, 48 SQ. FT… | $50,500 | |
| Scaffold or sidewalk shed | Erect 4 hi-lo climber scaffolds from 11/16/06 t0 11/16/0/7 | – |