201 E Randolph St, Chicago has 200 building permits on record. The most recent, issued Sep 28, 2026, is for electrical: Electrical maintenance permit. Occupancy: assembly. Start date: 10/1/2026. End date: 10/31/2026. All work under this permit must be performed by employees of the listed electrical …
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 10/1/2026. End date: 10/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 9/1/2026. End date: 10/1/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Fence, wall or deck | Temporary structure: new installation. Stage/platform - assembly - 480 SQ. FT. Electrical work = no. Non-sewer toilets: 15. Install date: 8/29/2026; removal date: 8/30/2026. | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 9/1/2026. End date: 10/1/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| New building | Permit expires on 10/19/2026 erection starts: 8/25/2026, erection ends: 9/8/2026. Self cert. CBC 2019. Reinstatement of 2025 permit 101073124 for the same 20ft x 40ft tent for the… | $2,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 8/1/2026. End date: 8/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 8/1/2026. End date: 8/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 7/1/2026. End date: 7/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 7/1/2026. End date: 7/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Fence, wall or deck | Temporary structure: new installation. Stage/platform - assembly - 480 SQ. FT. Electrical work = no. Non-sewer toilets: 4. Install date: 6/4/2026; removal date: 6/7/2026. | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 6/1/2026. End date: 7/1/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Line voltage electrical work. Repair or alter devices on existing circuits. Receptacle outlets: 1 . Lighting outlets: 1. Specific location: exterior walkway of sidewalk. | $10,000 | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 6/1/2026. End date: 7/1/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| New building | Permit expires on 07/13/2026 erection starts: 6/4/2026, erection ends: 6/8/2026. Self cert - CBC 2019. Reinstatement of 2024 permit 101051670 for the same 32x24 mobile stage for… | $3,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 5/1/2026. End date: 5/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 4/1/2026. End date: 5/1/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 4/1/2026. End date: 5/1/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 3/1/2026. End date: 3/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 3/1/2026. End date: 3/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 2/1/2026. End date: 3/3/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 2/1/2026. End date: 3/3/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 1/5/2026. End date: 2/4/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Low voltage/communication electrical work. Alter existing other. Specific location: garages. | $5,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 1/1/2026. End date: 1/31/2026. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 12/1/2025. End date: 12/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 12/1/2025. End date: 12/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 11/1/2025. End date: 12/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 11/1/2025. End date: 12/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 10/1/2025. End date: 10/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 10/1/2025. End date: 10/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 9/2/2025. End date: 10/2/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 9/1/2025. End date: 10/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Fence, wall or deck | Temporary structure: new installation. Stage/platform - assembly - 480 SQ. FT. Electrical work = no. Non-sewer toilets: 4. Install date: 8/23/2025; removal date: 8/24/2025. | – | |
| New building | Permit expires on 10/19/2025 erection starts: 8/26/2025, erection ends: 8/31/2025. Self cert. CBC 2019. One 20ft x 40ft tent for the 2025 jazz fest at millennium park south… | $2,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 8/1/2025. End date: 8/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 8/1/2025. End date: 8/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| New building | Permit expires on 09/25/2025 erection starts: 7/24/2025, erection ends: 7/27/2025. Self cert. CBC 2019. Jordan millenium park display containers on july 24-27 2025. Set-up july 24… | $5,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 7/1/2025. End date: 7/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 7/1/2025. End date: 7/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Low voltage/communication electrical work. Install other. Specific location: garage. | $1,000 | |
| Electrical | Electrical maintenance permit. Occupancy: assembly. Start date: 6/1/2025. End date: 7/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Other | – | ||
| New building | Permit expires on 07/19/2025 erection starts: 6/5/2025, erection ends: 6/8/2025. Self cert - CBC 2019. Reinstatement of 2024 permit 101051670 for the same 32x24 mobile stage for… | $3,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 5/1/2025. End date: 5/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Line voltage electrical work. Add 0 circuits to existing 200 amp service disconnecting means. Receptacle outlets: 1 . Lighting outlets: 22. Specific location: 1st floor. | $5,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 4/1/2025. End date: 5/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 3/1/2025. End date: 3/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 2/1/2025. End date: 3/3/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 1/1/2025. End date: 1/31/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 12/2/2024. End date: 1/1/2025. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Line voltage electrical work. Install temporary 240 kw diesel generator. Receptacle outlets: 0 . Lighting outlets: 0. Specific location: north promenade. | $1,500 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 11/1/2024. End date: 12/1/2024. All work under this permit must be performed by employees of the listed electrical… | – | |
| Sign | Monument sign, ground mounted - static, no electrical - in millennium park cloud gate. Message on the sign reads "grainger plaza". | $100,000 | |
| Electrical | Electrical maintenance permit. Occupancy: utilty. Start date: 10/1/2024. End date: 10/31/2024. All work under this permit must be performed by employees of the listed electrical… | – | |
| Electrical | Line voltage electrical work. New temporary 100 amp service disconnecting means with 3 circuits. Receptacle outlets: 3 . Lighting outlets: 0. Specific location: great lawn. | $15,000 | |
| Electrical | Electric maintenance september, 2024 | $6,000 | |
| Other | (2) Temporary 100amp panel services for jazzfest, north promenade, august 30-september 1 | $5,000 | |
| Other | (2) Temporary 100amp panel services for jazzfest, south promenade, august 30-september 1 | $5,000 | |
| New building | Permit expires on 10/23/2024 erection starts: 8/29/2024, erection ends: 9/2/2024. Jazz festtent- 4 day event (8/29/2024-9/1/2024) erect one (1) 20x40 frame tent. Erect 8/29/2024-… | $7,500 | |
| Electrical | Electric permit august, 2024 | $6,000 | |
| Electrical | Electric permit july, 2024 | $6,000 | |
| Electrical | Electric permit june, 2024 | $6,000 | |
| New building | Permit expires on 07/23/2024 erection starts: 6/6/2024, erection ends: 6/9/2024. Self cert - CBC 2019. 1- 32X24 mobile stage for the 2024 chicago bluesfest at the millennium park… | $3,000 | |
| Electrical | Electric permit may, 2024. | $6,000 | |
| Electrical | Electric permit april, 2024 | $6,000 | |
| Electrical | Electric permit march, 2024 | $6,000 | |
| Electrical | Electric permit february, 2024. | $6,000 | |
| Electrical | Electric permit january 2024 | $6,000 | |
| Electrical | Install new conduit and wiring for new lighting and power at the cloud sculpture and replace existing conduit and wiring feeding existing lighting | $75,000 | |
| Electrical | Electric permit-december, 2023. | $6,000 | |
| Electrical | Electric permit november, 2023 | $6,000 | |
| Electrical | Electric permit october, 2023 | $6,000 | |
| New building | Permit expires on 11/15/2023 erection starts: 9/28/2023, erection ends: 9/30/2023. Self cert. St jude dream chicago tents at millennium park. 1-50X50 tent and 1-20x40 tent… | $5,000 | |
| Electrical | Electric permit september, 2023. | $6,000 | |
| Other | One temporary 60k generator for jazz fest - north promenade friday 9/1/23 - sunday 9/3/23 | $5,000 | |
| New building | Permit expires on 10/14/2023 erection starts: 8/28/2023, erection ends: 9/3/2023. Jazz festtent- 4 day event (8/31/2023-9/3/2023) erect one (1) 20x30 frame tent. Erect 8/28/2023-… | $7,500 | |
| New building | Permit expires on 10/08/2023 erection starts: 8/7/2023, erection ends: 8/14/2023. Self cert. Temporary structure for the lunch-a-build adventure at millennium park - south… | $5,000 | |
| Other | (2) Temporary 100a panel services south promenade august 7-14, 2023 for kraft | $5,000 | |
| Electrical | Electric permit august, 2023. | $6,000 | |
| Alteration or repair | Spr 2019 CBRC: in-kind replacement of existing outdoor plaza paver system, waterproofing, and perimeter steps. No change in size or location (occupancy group a-5 outdoor assembly… | $4,709,995 | |
| Electrical | Electric maintenance july, 2023 | $6,000 | |
| New building | Permit expires on 08/13/2023 erection starts: 6/16/2023, erection ends: 6/17/2023. Inflatable structure- self-cert- 1 day event- 6/17/2023 ikea frakta bag inflatable structures… | $20,000 | |
| Electrical | Electric permit june, 2023. | $6,000 | |
| New building | Permit expires on 07/25/2023 erection starts: 6/8/2023, erection ends: 6/12/2023. Self cert. 2023 Chicago bluesfest mobile stage at millennium park south promenade. 1 - 32X24… | $3,000 | |
| Electrical | Electric maintenance may, 2023. | $6,000 | |
| Electrical | Electric maintenance april, 2023. | $6,000 | |
| Electrical | Electric maintenance march, 2023 | $6,000 | |
| Other | Required maintenance february, 2023. | $6,000 | |
| Electrical | Electric maintenance january, 2023. | $6,000 | |
| Electrical | Electric maintenance december, 2022. | $6,000 | |
| Electrical | Electric maintenance-november, 2022. | $6,000 | |
| Other | One temporary 55k generator for tree lighting event - central promenade 11-18-22. | $100 | |
| Other | Installation of one temporary 24 x 20 mobile stage trailer (stageline sl100) for city of chicago tree lighting event | – | |
| Other | Two temporary 180kw generators for winter market north promenade tent 11-17-22 through 11-21-22. | $100 | |
| Electrical | Electric maintenance october, 2022. | $6,000 | |
| Electrical | Electric maintenance september, 2022 | $6,000 | |
| New building | Permit expires on 11/19/2022 erection starts: 9/30/2022, erection ends: 10/1/2022. Self cert. St jude childrens hospital event - video and banner trusses at the pritzker pavilion… | $2,000 | |
| New building | Permit expires on 11/19/2022 erection starts: 9/30/2022, erection ends: 10/2/2022. Self cert. St jude childrens hospital tent event at the pritzker pavilion in millennium park… | $5,000 | |
| Electrical | Electric maintenance august, 2022 | $6,000 | |
| Electrical | Electric | $6,000 | |
| Electrical | Electrical maintenance - june 2022 | $6,000 | |
| Electrical | Electrical maintenance - may 2022 | $6,000 | |
| Electrical | Electrical maintenance - april 2022 | $6,000 | |
| Electrical | Electrical maintenance - march 2022 | $6,000 | |
| Electrical | Electrical maintenance - february 2022 | $6,000 | |
| Electrical | Electrical maintenance - january 2022 | $6,000 | |
| Other | Temporary power for north promenade - hotel transylvania promotion january 13-16, 2022 | $100 | |
| Electrical | Electrical maintenance - december 2021 | $6,000 | |
| Electrical | Electrical maintenance - november 2021 | $6,000 | |
| Other | Installation of one temporary 24 x 20 mobile stage trailer (stageline sl100) for city of chicago tree lighting event | – | |
| Other | Two temporary 180kw generators for dept of cultural affair winter market-north promenade tent - 11-17-21 through 11-21-21. | $150 | |
| Electrical | Electrical maintenance - october 2021 | $6,000 | |
| Electrical | Electrical maintenance - september 2021 | $6,000 | |
| Electrical | Electrical maintenance - august 2021 | $6,000 | |
| Other | Temporary power for jam concert - great lawn- 8/28/21 | $100 | |
| New building | Permit expires on 10/10/2021 erection starts: 8/8/2021, erection ends: 8/9/2021. Tent- self-cert 1 day event 8/8/2021 arena partner erect three tents, one (1) 20x40 frame tent… | $22,500 | |
| Electrical | Electrical maintenance - july 2021 | $6,000 | |
| Other | Temporary power for st. Jude event - great lawn 8-8-21. | $100 | |
| Electrical | Electrical maintenance - june 2021 | $6,000 | |
| Electrical | Electrical maintenance - may 2021 | $6,000 | |
| Electrical | Electrical maintenance - april 2021 | $6,000 | |
| Electrical | Electrical maintenance - march 2021 | $6,000 | |
| Electrical | Electrical maintenance - february 2021 | $6,000 | |
| Electrical | Electrical maintenance - january 2021 | $6,000 | |
| Electrical | Electrical maintenance - december 2020 | $6,000 | |
| Electrical | Electrical maintenance - november 2020 | $6,000 | |
| Electrical | Electrical maintenance - october 2020 | $6,000 | |
| Electrical | Electrical maintenance - september 2020 | $6,000 | |
| Electrical | Electrical maintenance - august 2020 | $6,000 | |
| Electrical | Electrical maintenance - july 2020 | $6,000 | |
| Electrical | Electrical maintenance - june 2020 | $6,000 | |
| Electrical | Electrical maintenance - may 2020 | $6,000 | |
| Electrical | Electrical maintenance - april 2020 | $6,000 | |
| Electrical | Electrical maintenance - march 2020 | $6,000 | |
| Electrical | Electrical maintenance - february 2020 | $6,000 | |
| Other | Temporary generator 200kw at chase promenade south - the marketing arm for state farm for 2-10 thru 2-16-20. | $100 | |
| Other | Temporary generator 150kw for beer garden nba all-star game 2-10 thru 2-15-2020. | $100 | |
| Other | Temporary 180kw generator for chase promenade north nba all-star game 2-10 thru 2-15-2020. | $100 | |
| New building | Permit expires on 04/07/2020 erection starts: 2/6/2020, erection ends: 2/20/2020. Temporary tent for the nba all star activation event. 1-66'X98' tent. Partytime-hdo productions… | $8,000 | |
| Electrical | Electrical maintenance - january 2020 | $6,000 | |
| New building | Permit expires on 04/03/2020 erection starts: 2/10/2020, erection ends: 2/16/2020. Tent- 6 day event 2/10/2020-2/15/2020, millenium park- criterion productions. Erect one (1)… | $10,000 | |
| Electrical | Electrical maintenance - december 2019 | $6,000 | |
| New building | Permit expires on 02/06/2020 erection starts: 9/27/2019, erection ends: 10/1/2019. Self-cert. Banner truss for chicago gourmet entry . 1-28'Wide x 8' deep x 17' tallentry banner… | $1,000 | |
| Electrical | Electrical maintenance - november 2019 | $6,000 | |
| New building | Permit expires on 01/22/2020 erection starts: 9/20/2019, erection ends: 9/21/2019. Self cert. Dcase youth arts showcase stage at millennium park promenade south. 1-32X24 mobile… | $2,000 | |
| Other | Temporary 150kw generator for dept of cultural affair winter market-north promenade tent- 11-21 thru 11-24-19 | $750 | |
| Other | Two temporary 180kw generator for dept of cultural affair winter market-north promenade tent - 11-21 thru 11-24-19. | $750 | |
| New building | Permit expires on 01/20/2020 erection starts: 11/21/2019, erection ends: 11/22/2019. Self cert. Dcase 2019 tree lighting ceremony platform. Reinstatement of 2017 permit 100735209… | $2,000 | |
| Electrical | Electrical maintenance - october 2019 | $6,000 | |
| Alteration or repair | Remove concrete balusters, replace in kind tread and riser; repair and replacement at existing stair, remove and replace existing railings with new. Repair 4000 SQ FT concrete… | – | |
| Electrical | Electrical maintenance - september 2019 | $6,000 | |
| Other | Temporary 55kw generator for chase promenade south - 9-27 thru 9-29-19 | $100 | |
| Other | Temporary 55 kw generator for great lawn west 9-27 thru 9-29-19. | $100 | |
| Other | Temporary 55kw generator for great lawn east - 9-27 thru 9-29-19 | $100 | |
| Other | Temporary power for chicago gourmet rootop terrace 9-27 thru 9-29-19. | $100 | |
| Other | Temporary power for chicago gourmet chase promenade south 9-27 thru 9-29-19 | $100 | |
| Other | Temporary power for chicago gourmet chase promenade north 9-27 thru 9-29-19. | $100 | |
| New building | Permit expires on 11/20/2019 erection starts: 9/25/2019, erection ends: 10/1/2019. Self-cert. Reinstatement of chicago gourmet show tents. Same tentsas 2016 permit 100669922… | $20,000 | |
| New building | Permit expires on 11/18/2019 erection starts: 9/24/2019, erection ends: 9/30/2019. Self-cert. Chicago gourmet patron tent. Reinstatement of 2017 permit100725157 - same 1-33x33… | $2,000 | |
| Other | Temporary power for chase promenade north enterprise - saturday, 9-14-19. | $100 | |
| Other | Temporary power for rooftop terrace revel reception - saturday 9-7-19 | $100 | |
| Electrical | Electrical maintenance - august 2019 | $6,000 | |
| New building | Permit expires on 10/29/2019 erection starts: 8/28/2019, erection ends: 9/1/2019. Self cert. Dcase jazz fest 2019 - trusses. 3-20' Wide banner trusses. Marquee event rentals. ****… | $4,000 | |
| Other | Temporary power for rooftop terrace - harris theater jazz concert - 8/28/19. | $100 | |
| Other | Temporary power rooftop terrace - maritz collaborative reception 8-21-19 | $100 | |
| Other | Temporary power for rooftop terrace - uptake - 8-10-19. | $100 | |
| Electrical | Electrical maintenance - july 2019 | $6,000 | |
| Other | Temporary power for park grill - thursday - 7-25-19 | $100 | |
| Other | Temporary power for park grill - thursday 7-25-19. | $100 | |
| Other | Temporary power for perennial plant association rooftop terrace - wednesday 7-31-19. | $100 | |
| Other | Temporary power for chicago worship rooftop terrace - saturday 7-27-19. | $100 | |
| Electrical | Electrical maintenance - june 2019 | $6,000 | |
| Other | Temporary power vital proteins collagen water launch party rooftop terrace - 6-19-19 | $100 | |
| Other | Temporary power for aon global service day rooftop terrace 6-18-19. | $100 | |
| New building | Permit expires on 08/04/2019 erection starts: 6/4/2019, erection ends: 6/7/2019. Acar req'd. Self cert. Harris theater tent reinstatement - hubbard st. Dance event. Same tents as… | $5,000 | |
| Electrical | Electrical maintenance - may 2019 | $6,000 | |
| Other | Temporary power for bristol meyers squibb reception-rooftop terrace 5-30-19 | $100 | |
| Other | Temporary power for konecranes global-rooftop terrace 5-14-19 | $100 | |
| New building | Permit expires on 07/06/2019 erection starts: 4/24/2019, erection ends: 5/9/2019. Standard review. Art institute of chicago gala tents at millennium park south promenade… | $25,000 | |
| Other | Four 100 amp panels for temporary power for masterpiece19 event south promenade 5-3 thru 5-4-19 | $100 | |
| Electrical | Electrical maintenance - april 2019 | $6,000 | |
| Other | Temporary 300kw generator for art institute masterpiece19 5-3-19 thru 5-4-19 | $100 | |
| Electrical | Electrical maintenance - march 2019 | $6,000 | |
| New building | Permit expires on 05/22/2019 erection starts: 3/24/2019, erection ends: 5/1/2019. Installation of 1-19 x 48 (902sf) temporary structure for samsung on the north promenade in… | $100,000 | |
| Other | Three 100 amp panels for temporary power for north promenade-samsung - march 24 thru april 29. | $800 | |
| Electrical | Hook up temporary cabling from temp generators to power box and HVAC | $4,500 | |
| Electrical | Electrical maintenance - february 2019 | $6,000 | |
| Electrical | Electrical maintenance - january 2019 | $6,000 | |
| Electrical | Electrical maintenance - december 2018 | $6,000 | |
| Other | Temporary power for nhl - pritzker pavilion-great lawn 12-26-18 thru 1-3-19 | $100 | |
| New building | Permit expires on 02/13/2019 erection starts: 12/28/2018, erection ends: 1/2/2019. Bridgestone nhl winter classic stage. 24X20 mobile stage with wings. Fastlane productions, inc… | $2,000 | |
| New building | Permit expires on 02/11/2019 erection starts: 12/27/2018, erection ends: 1/2/2019. Tent- 4 day event (12/29/18-1/01/19) nhl winter classic park 2018. Erect seven tents, three (3)… | $21,000 | |
| Electrical | Electrical maintenance - november 2018 | $6,000 | |
| New building | Permit expires on 01/14/2019 erection starts: 11/15/2018, erection ends: 11/16/2018. Self cert. Dcase 2018 tree lighting ceremony platform. Reinstatement of 2017 permit 100735209… | $2,000 | |
| Elevator | Modernization of four (4) 3500lb.cap, passenger elevators; #1-n ran & #2-s ran 8-floors, 350 fpm, geared traction basement machines. #3-E mon & #4-w mon 5-floors, 150 fpm… | $477,600 | |
| Electrical | Electrical maintenance - october 2018 | $6,000 | |
| Electrical | Electrical maintenance - september 2018 | $6,000 | |
| Other | Temporary power for chase promenade north chicago ideas week - 10-19-18 | $100 | |
| Other | Temporary power for rooftop terrace half acre beer festival - 10-13-18 | $100 | |
| Other | Temporary power for chase promenade north cmap - 10-10-18 | $100 |