4150 E Quartz Cir
Building permits, Mesa, AZ 85215
4150 E Quartz Cir, Mesa has 11 building permits on record. The most recent, opened Oct 16, 2024, is for alteration or repair: Foundation only permit. Special Inspection required for soils, concrete, steel, and anchor. Ref: pmt24-18271.
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Alteration or repair | Foundation only permit. Special Inspection required for soils, concrete, steel, and anchor. Ref: pmt24-18271. | – | |
| Fire systems | Construct new 16,875 square foot warehouse building. Special Inspection required for soils, concrete, steel, and anchors. Foundation permit ref: pmt24-18342. Special inspections… | – | |
| Alteration or repair | Add backup emergency generator with 211 gallon tank wit concrete pad. New ac breakers in existing ppc. Add an automatic transfer switch. add (1) 2" conduit from ats to ppc and 2"… | – | |
| Alteration or repair | Modify existing cellular tower by removing (9) antennas - (3) per sector, (5) RRUs, (1) SSC cabinet, and (2) auxiliary cabinets. Relocate (3) RRUs. Install (6) antennas - (2) per… | – | |
| Fence, wall or deck | expedite - remove portion of existing CMU fence, install new rolling gate and driveway. Special inspection required for epoxy. Comply with the conditions of approval ADM20-00507. | – | |
| Alteration or repair | Replace (6) antennas, (2) MW's, (3) ODU's, (9) RRUS, (3) TMA, (1) COVP, (4) MW lines, (1) hybrid line and (18) coax. Power: Swap existing 200A Valare with 400A Alpha See… | – | |
| Alteration or repair | T-Mobile is proposing to remove/replace one (1) MW antenna to the existing MonoPole WCF, as depicted in the attached site plan/elevation. Planning approval ADM17-00077 | – | |
| Other | Replace 3 antennas, install 3 fasb mod kits, remove 2 tma's install 3 tma's move 2 radio modules from tower top to ground. Power upgrade3 200 amp service was already reviewed in… | – | |
| Electrical | Cell tower electrical upgrade. Remove existing 100 amp service and install 200 a service. Remove existing100 a power protection cabinet (ppc) and install a 200 a ppc. Move… | – | |
| Addition | Construct new sand blaster enclosure pre-engineered, building 1000 SQ FT. | – | |
| Addition | Pbi-construct new office addition consisting of 725 s.f. To an existing building. The addition will be for the shop offices of able steel fabricators. Currently these offices are… | – |