5000 E Mcdowell Rd 531
Building permits, Mesa, AZ 85215
5000 E Mcdowell Rd 531, Mesa has 23 building permits on record. The most recent, opened Sep 22, 2026, is for fire systems: Replace fire sprinkler system for riser 7 and for RP7 first floor only
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Fire systems | Replace fire sprinkler system for riser 7 and for RP7 first floor only | – | |
| Electrical | AFP26-01140 This project consists of two new tool installations "Mazak" and "Kuraki" located within B531. The scope of work includes mechanical, compressed air, and electrical… | – | |
| New building | AFP26-01140 - Remove existing chemical tank and replace with a new one per design drawings | – | |
| Fence, wall or deck | AFP26-01140: Install utility infrastructure for new oven #4 | – | |
| Fire systems | Install new fire sprinklers for oven 4. Tie in to existing overhead system. | – | |
| Alteration or repair | Demo existing staircase/railing, asphalt, concrete ramp, wastewater treatment system in water treatment area at building 531 in existing site. Remove and reinstall portion of… | – | |
| Other | AFP24-06758 - B531 Install (3) Down Draft tables@ various locations | – | |
| New building | Replace (2) existing building air compressors with new ones per design drawings | – | |
| Alteration or repair | AFP23-04580 Install New Grade D Piping to dedicated compressor and Paint booth per design drawings. | – | |
| Electrical | AFP23-04580 The AUSS machine requires DI water & potable water along with a drain, electrical, compressed air and a new concrete foundation. These utilities will support the new… | – | |
| Other | (AFP22-12765) Demo's pilots shower and convert into a mother's room. | – | |
| Roofing | AFP21-10566 Replacement of roof mounted air handling units | – | |
| Alteration or repair | Afp20-00884 - b531.1 col. G9 Restroom Renovation | – | |
| Electrical | AFP19-02535: Convert old computer room to industrial athlete intervention room. Work includes some electrical work, tie into existing HVAC system, remove raised floor, patch &… | – | |
| Fire systems | EXPEDITED - Expand existing clean room, demo and relocate existing breakroom and restroom to east side of the demo area, rearrange existing equipment to accommodate clean room… | – | |
| Other | AFP18-02178: Additive Manufacturing Relocation | – | |
| Alteration or repair | AFP18-02178 - B531.1- Machine Shop Renovations with new paint, new 480V outlets and air drops | – | |
| Electrical | Renovation of existing break room with new finishes, plumbing & electrical. | – | |
| Fence, wall or deck | Renovation of the following restroom: b531: level 1 - pair of single stalls by structures lab | – | |
| Electrical | AFP18-02178 - Renovations of existing break rooms including finishes, mechanical, plumbing and electrical work | – | |
| Other | AFP18-02178 - B531.1 Tooling Expansion for 3D Printer | – | |
| Other | AFP18-02178: Modification of room B101 to receive radiography machine. | – | |
| Fire systems | AFP18-02178 - 1st Submittal of Fire Sprinkler Plan for Tool Storage (BLD2017-05360) | – |
Mesa Development Services last updated its data Sep 30, 2026. We checked it 2026-10-01 18:46 UTC. Official data.