5000 E Mcdowell Rd, Mesa has 200 building permits on record. The most recent, opened Sep 3, 2026, is for commercial or industrial projects: New 12 inch looped fire line extension to provide service connections to Building 570 and a potential expansion.

All permits at this address

All permits at 5000 E Mcdowell Rd
DateTypeWorkCost
Commercial or Industrial Projects
New 12 inch looped fire line extension to provide service connections to Building 570 and a potential expansion.
–
Other Commercial
Replace existing site chilled-water supply and return piping serving Buildings 510, 520, 521, 530, 531, 533, 540, 543, 560, 580, 581 and 591, including new isolation valves…
–
Commercial or Industrial Projects
Install canopy over existing Falcon-1 switchgear inside Falcon Substation.
–
Annual Facilities Permit
Annual Facilities Permit for 2026
–
Commercial or Industrial Projects
Grade and pave area with new asphalt. Renovate retention area. Results in CoC.
–
Commercial or Industrial Projects
Design for a new falcon2 medium voltage switchgear for the new srp transformer. The new switchgear will provide the power feed for the new aca phase 2 and phase 3 addition.
–
Commercial or Industrial Projects
Dewpoint control for building 570. Scope includes addition of a makeup air handler and low temperature chilled water system. Special inspections for steel, concrete, fabrication…
–
Tenant Improvement (Interior Only)
Tenant improvement in existing 158,529 SF, type II-B construction, F1, B and S1 occupancy warehouse to add 4,000 Sf, group B occupancy office mezzanine. Mezzanine to have Open…
–
Commercial or Industrial Projects
New pony chiller and wet side economizer to the existing chiller plant for existing building. New MEP. Special inspections required: concrete construction, expansion bolts, and…
–
Commercial or Industrial Projects
Refer to AFP25-01081: Replace existing elevator equipment
–
Sign Permit
One (1) D/F non-illuminated monument for Boeing, Mesa facility. **It will be placed near the driveway leading to buildings 570 and 571.
–
Commercial or Industrial Projects
New ground up complete buildings. Advance composite fabrication center building occupancy classifications F-1 (main) S-1, B. Construction type IIB. 158,529 s.f. Central Utility…
–
Commercial or Industrial Projects
Site Civil, Landscape, Building Foundation and Plumbing
–
Commercial or Industrial Projects
Removal and replacement of underground medium voltage (MV) cabling up to MV loop switches as well as selected MV cabling from loop switches to XFMRS, where new duct bank sections…
–
Commercial or Industrial Projects
The proposed aircraft rescue and fire fighting (arff) station includes a 14,904 square foot new building and site improvements at a vacant site on boeing's mesa campus. This new…
–
Annual Facilities Permit
Mother Permit for 2019 AFP
–
Other Commercial
AFP18-02178 - The installation of a new 480v feeder from the B-531 outdoor substation (west) to the flight line area near B-535. The service supports the relocation of (2)…
–
Commercial or Industrial Projects
Construct a pre-engineered steel building with concrete pad, column footings, lighting, grounding & lightning protection. Building number 584. Occupancy group S-1, construction…
–
Annual Facilities Permit
Annual facilities permit for the boeing co (mother permit) for 2018
–
Not Selected
The scope to install sprinkler piping for north side 2nd flr remodeled office area ,To include new piping at acoustical grid ceilings and quick response sprinkler heads .Ref…
–
Not Selected
The scope to install sprinkler piping for east side 2nd flr remodeled office area ,To include new piping at acoustical grid ceilings and quick response sprinkler heads .Ref permit…
–
Not Selected
boeing requesting after hours inspection ( ref permit # bld2017-05126 ) electrical service to re-energize ses for 2nd floor.
–
Not Selected
The scope includes complete renovation ,demo and construction of west end 543.2 2nd flr
–
Not Selected
Set up 30' x 70' tent with tables and chairs for approximately 24 hours.Tent is being used for cafeteria overflow seating .
–
Not Selected
Scope of work to install fire alarm and suppression system for 2nd floor office T/I Ref permit # Bld2017-051126.(east side phase 1 )
–
Not Selected
Scope of work to install fire alarm and suppression system for 2nd floor office T/I Ref permit # Bld2017-05130.(north side phase 1 )
–
Not Selected
The project consists of removing Anechoic foam panels ,Add new lighting to existing electrical infrastructure .In fill pits with concrete ( note : will require special inspection…
–
Not Selected
The installation of fire sprinkler system to south canopy extension
–
Not Selected
the scope of work consists of the installation of AHU # 6,15,16,18,21&22 .To Include curb reconstruction with welding ,high strength bolting ( special inspection form required )…
–
Not Selected
The scope of work consists of upgrade and replacement of mechanical and electrical to support lab .
–
Not Selected
Convert manufacturing space into short term tool storage
–
Not Selected
install generator connections boxes to support 531 580 and 541 freezer and chilled water for emergency backup power .
–
Not Selected
remove and replace the current electrical switch and transformer (4160 v -480 v switch gear .
–
Not Selected
Install chain link fence with double gates and access card / demo 2 walls and raised floor.
–
Not Selected
Renovation of area to acccomodate new test equipment and work stations.Includes demolition of walls.
–
Not Selected
The scope is complete renovation of 530.2 northwest end of building 2nd flr.walls ,MP&E connecting to existing infrastructure. Note : fire caulking inspections to be inspected by…
–
Not Selected
The project consists of the installation of a new sink ,elec for new equipment.Work includes M&E to existing infrastructure
–
Not Selected
The scope is complete renovation of 543.2 east end .walls ,MP&E connecting to existing infrastructure. Note : fire caulking inspections to be inspected by 3rd party inspector.Any…
–
Not Selected
Combine 2 spaces into 1 for a totla area of 1006 sqft .Some electircial and HVAC work.
–
Not Selected
Replacement of 2 45 KVA transformers with 2 75 KVA transformers .
–
Not Selected
remove and replace of 7 roof top AHU's
–
Not Selected
installation of newelectrical router and disconnects supporting automated router .
–
Not Selected
remove and replace of 80 ton chiller and all supporting uiltilties .
–
Commercial or Industrial Projects
The addition of 2,896 sf to building 531 for a new transmission testing laboratory. F-1 occupancy to remain. Fire alarm and fire sprinkler systems are deferred submittals.
–
Not Selected
replace existing roof top air handlers on building 530
–
Not Selected
Replace existing mezzanine building air handlers 21 & 22
–
Not Selected
This project consists of remodeling an existing 717 sf area of open space into new coffee bar and dismantling ab existing coffee bar 300sf .
–
Not Selected
Installation of three 20' foot high light poles.Electrical supply from Building 541 to thermal storage compartment.
–
Not Selected
Build new hard wall office on second floor building 560
–
Not Selected
Install man bars in duct work and extend east wall to deck including upgrade of security system.
–
Not Selected
The renovation of restrooms located on 1,2 &3 floor levels . The scope of work includes new plumbing ,lighting and architectual walls and finishes .
–
Not Selected
Removal of existing roof deck , replacement and expansion of canopy structure.
–
Not Selected
This project consists of the 520 south elevator.This will include the cab,hosit way ,pumps and all other associated equipment.
–
Not Selected
This project consists of the modernization of the 543 east elevator.This will include the cab , hoist way , pumps and all other associated equipment .
–
Com (OTH) Plumbing
Afp program: installation of new sewer and cold water lines in the cafeteria building
–
Com (OTH) Renovations or Remodels
Afp program: remove 93000 SQ FT of pavement and replace with new concrete
–
Com (OTH) Renovations or Remodels
Afp program: install a pair of 3'0" wide doors project also includes some electrical work and mechanical work
–
Com (OTH) Non Structural
Permit to set up temporary tent for employees to have lunch in the tent will be in place for 24 hours and have emergency signage.
–
Not Selected
Provide fire protection for spray booth refrerence permit # bld2016-05708
–
Not Selected
The project consists of adding fire protection and electrical for mezzanine including existing infrastructure for utilities.
–
Not Selected
remove replace exterior MDP 5 switch gear . located west of building 531 on west side .Includes all utilities.
–
Com (OTH) Fire Alarms
Afp project: modify existing fire alarm system
–
Com (OTH) Fire Sprinklers
Afp project: modify existing wet pipe system
–
Not Selected
The scope of work consists of the installation 16'x16'x35' enclosed spray booth and connected to existing infrastructure.per 2006 ICC codes, Fire CD required - deferred submittal…
–
Not Selected
Remove wash down process and provide for oil seperator for the wash down effluent.
–
Not Selected
The scope of work is to bring all sidewalks, ramps and approaches up to current ADA requirements to and from buildings 540,541,543 and 533.
–
Com (OTH) Renovations or Remodels
Scope of work to renovate 10,692 sqft office and data center space located in building 510.To include 6" raised computer floor ,new wall coverings,acoustical suspended ceilings…
–
Com (OTH) Electrical
Installation of new 120/208 electrical power panel to provide necessary power to new mechanical equipment in room G109 of building 531. Electrical install includes step up…
–
Com (OTH) Mechanical
This project consists of replacing all the pumps and mechanisms for the elevators 1& 2 in building 530.This also includes the interior of the elevator car but not the car shell.
–
Not Selected
This project involves the removal and replacement of roof mounted air handler units AHU 15-16-17-18--32.Project includes new walls ,HVAC equipment and new MP&E utilities.
–
Not Selected
This project involes the replacement of the air handler units AHU-3 and AHU-5 in building 531.Scope of work includes structual and MP&E.
–
Com (OTH) Renovations or Remodels
Renovation of existing 10,692 s.f. For office space aft project; located in building 510. Occupancy unchanged. New 6" floor, wall coverings and ceilings. Mechanical, electrical &…
–
Not Selected
Early fire protection system modifications to allow for demolition to procede while maintaining halon fire protection systems in adjoining areas
–
Not Selected
This project consists of the removal of AHU 7 & 12 with the replacement of the units in the same location with new chilled water lines,duct work and electrical including…
–
Not Selected
This project consists of the removal of AHU units 20-21-28 with the replacement of the units listed with new chilled water lines,duct work and electrical including supporting…
–
Not Selected
Construct new light manufcturing room includes walls,doors, mechanical,air vacuum lines,electrical .area of improvement 13,785 sf.
–
Not Selected
This project consists of setting up a temporary tent for employees to have lunch.the tent wil be in place for only 24 hrs and have exit signs and fire extinguishers place…
–
Com (OTH) Electrical
Afp for surge protectors on panels
–
Com (OTH) Public Works or Utilities
Super expedite - removal of boeing fire water backflow and capping of valve located on mcdowell rd
–
Not Selected
Demo existing restrooms to the frame and renovate with new piping . fixtures ,walls ,tile and drainage
–
Not Selected
Replacement of make up air unit and associated ductwork located on the roof of 531 south , serving the paint shop area 1st floor.
–
Not Selected
Replacement of fan coil units and associated ductwork located on the mezzanine floor of B531,serving trim and grind areas in 1st floor.
–
Not Selected
This project consists of remodeling and modernize 530 west elevator with new equipment in order to meet current code requirements.
–
Not Selected
Installation of new 30KVA /XMFR and 480v-3PH 208/120V -3PH SEC for metrology lab.provide fire cd
–
Not Selected
This project is to install all new elevator equipment including mechanical ,electrical and fire alarm devices required . Elevator must be inspected and certified by state elevator…
–
Not Selected
Remodel of 300 sf executive kitchen to include new cabinets counters,appliances ,ceiling and new residential exhaust hood for fume removal.
–
Not Selected
Reconfigure HVAC in two flight monitioring labs to increase cooling to the rooms.
–
Not Selected
Relocate three exhaust fans between AHU 12 and AHU 14 .
–
Not Selected
Replacement of AHU-2 and all associated ductwork located on 2nd floor of B580 east and all utilities and fire alarms devices connected to this equipment.
–
Not Selected
This project consists of the installation on new under ground fire sprinkler recovery tank and piping or connected to the tank.
–
Not Selected
this project consists of the demo of existing freezer and installation of new freezer.
–
Not Selected
The scope of work includes demo of existing showers,interior walls -waste lines -new supply lines to new bathroom toilets and urinals - also electrical and mechanical.
–
Not Selected
This project consists of relocating three existing rack power receptacles .Povide install four L6_20R receptacles on two new circuits.gound and bond cable trays per NEC 250.8
–
Not Selected
This project consists of demo existing ahu,chilled water lines,duct work ,electrical.To include installation of new AHU with chilled water lines,duct work ,fire sprinklers and…
–
Not Selected
Remove and replace of north campus air compressor with 300HP 480 V 3P, 600A/3P disconnect - New dryer 480V/3P , also to include all supporting utilities .
–
Not Selected
The scope of work for this project is the installation of electrical connection to a 28 kw , 480 V electric duct heater .
–
Not Selected
Renovation of existing washer and dryer conversion to new emergency shower
–
Not Selected
Relocate 4 existing pendent sprinklers to accomadate new ceiling tile.Install 8 upright sprinklers in new equipment pit - extend piping from existing overhead piping to supply…
–
Not Selected
provide modifications to existing pump house .Second roof top exhuast fan and supporting utilities.
–
Not Selected
This project consists of the expansion of the screen printing process.Providing support for additional equipment inculdes modifications to MP&E to existing infrastructure.Deffered…
–
Not Selected
Remove and replace existing 15kv rated switch gear line up, construction of concrete pad and retaining wall also install grounding electrodes.
–
Not Selected
This project consists of setting up a temporary tent for employee lunch.the tent will be in place for approximately 24 hours and will have exit signs and frire extinguishers.
–
Not Selected
This project consists of the demo of area between column line A - B - 3 thru 2.3 .Walls will be modified for new training room to include mechanical ,electrical and all supporting…
–
Not Selected
This project consists of the removal of 2 ton crane and upgrade under hung crane framework for 3 ton crane system. All supporting utilities to upgraded to meet new 3 ton crane…
–
Com (OTH) Fire Sprinklers
Fire sprinklers in new fiber placement clean room
–
Not Selected
This project consists of structures lab improvements to accomodate new test equipment.Improvements include modifications to existing masonry structure for control room…
–
Not Selected
This project consists of demo on existing mechanical and electrical also the installation of new mechanical and electrical for oil/water separator system .
–
Not Selected
This project consitis of demo on mechanical and electrical.Install new 5'' schedule 160 A106 supply piping ,pump instrumentation controls,Hydraulic piping ,guard rails ,HPU…
–
Not Selected
The project consists of re- routing conduit from underground to outside the building and fasten to exterior walls.The conduit and new feeders will be installed from MDP5 main…
–
Com (OTH) Non Structural
The concrete driveway off mcdowell rd into the boeing facifility will be modified to remove the raised curb (hump) between the entrance and exit driveway. Concrete will be…
–
Not Selected
Remodel 10,386 sf of existing warehouse area on the northwest corner of the building 543 . The scope involves architectural, mechanical and electrical modifications.
–
Not Selected
Install new 2.0'' dia. PE natural gas line extension from existing riser location located at building 510 . Route and connect to existing 2'' PE gas line near NWC of B 510.
–
Not Selected
Remodel 8,129 sf of existing warehouse area in the northwest corner of building 543.1 the scope involves architectural,mechanical and electrical modifications.
–
Not Selected
Structures lab improvements to accomadaste new test equipment.Structual requirements for new equipment pit and utility trenches.
–
Not Selected
Remove the southeast gym doors.Modify wall.work includes structual and electrical utilities.
–
Com (OTH) Renovations or Remodels
Building 543 - modifications for a 13,000 SQ FT, class 100,000 clean room, f-1 occupancy classification, construction type IIIB, within existing warehouse area on the northeast…
–
Com (MSC) Annual Facilities Permit
Afp - repair existing storm drain. Increase size of existing storm drain outlet. Clean and refurbish 3 existing drywells t adeq standards.
–
Not Selected
Installing new test headers (5) and protectowire linear heat detection system . Occupancy group B2 ,F1,S5,H2,H7 Type II-B
–
Not Selected
To renovate all restrooms in building 530 on 1st 2nd & 3rd floors.This scope of work includes demo ,relocation waste drain plumbing ,domestic water lines all supporting utilities…
–
Not Selected
renovation of existing training rooms "B" occupancy to remain .
–
Com (OTH) Public Works or Utilities
Redesign of existing mcdowell driveway entrance that connects the site access road to the boeing gate 2 security checkpoint. The entry will be modified to conform to current city…
–
Not Selected
Install new private 2'' diameter gas service line extension and riser for future connection to building 543.Provide stub at south end of new line for future connection to existing…
–
Not Selected
Remove existing paint water spray booth and related utilities.Replace with new 10'x10'x20' ID paint water spray booth to include explosion proof horn strobe notification device…
–
Not Selected
Provide electrical utilities and connect to existing infrastructure for P8 simulator .Upgrade and install NEMA L6 -20R single receptacle under raised floor for rack cord…
–
Not Selected
Pa system upgrade to existing infrastructure and utilities.The scope work includes upgrades for for buildings 531 and 543.
–
Not Selected
installation of three temporary tents for special event from 3/19/ to 3/23.
–
Com (OTH) Deferred Fire Sprinklers
Deferred fire sprinklers
–
Com (OTH) Renovations or Remodels
Pbi renovation of existing breakroom, office space and restroom. New shower, cabinets, relocate sinks, new washer and dryer, new fridge, electrical, mechanical and plubming.
–
Com (OTH) Fire Sprinklers
Fire sprinklers for duct.
–
Com (OTH) Mechanical
Afp - replace air handling units ahu-19 & 23 and provide odor mitigation
–
Com (MSC) Annual Facilities Permit
Install new ceiling grid and tiles
–
Com (MSC) Annual Facilities Permit
Demo masonary wall cut new opening in concrete wall and add door to exit way
–
Com (MSC) Annual Facilities Permit
A temporary tent will be erected for approximately 36 hours to accommodate cafeteria overflow for employee appreciation luncheon. Tent is 30x70 and will seat a maximum of 126…
–
Com (OTH) Renovations or Remodels
Renovation of office space into sleeping units for boeing fire responders. Change of occupancy classification requires room to be separated from adjacent occupancies by 1-hr fire…
–
Not Selected
The scope of work includes the demo of the first floor,renovation of suspended ceilings,installation of exhaust system from IR machine to south end of building,Electrical…
–
Com (OTH) Renovations or Remodels
Install 5-axis router and new dust collection system and relocate furniture within 2500 SQ. FT Area of type IIB construction, that is fire sprinklered and fire alarmed. Spark…
–
Not Selected
Replace A/C units within computer rooms, Connected to existing electrical and utility infrastructure.
–
Com (PJT) Commercial Buildings
Expedited: 1,300 SQ FT single story masonry pump house#1 bldg#552 w/ roof equipment & access/guards ( s-2/ VB ) and 500,000 gal 4,660 SQ FT concrete fire water tank ( u/vb ) w/…
–
Not Selected
Project consists of adding fall protection railing where antennas are located.
–
Not Selected
Renovation of 32,000 sf within building 520 to include : Relocation of cable trays ,new power drops ,replacement of high bay fixtures and new compressed air drops.
–
Not Selected
Work involves mounting a steel constructed awning to a steel frame of the existing building structure ,The Awning extension will cover that portion of the oven not covered by the…
–
Not Selected
Minor interior renovation of 5,888 SF within existing building 510 with an exterior terrace addition.
–
Not Selected
Modifications to AHU-4 & MUA -25 in building 531 , AHU-4 & MUA -25 will be removed and replaced.All electrical and utilities will be connectecd to the existing infrastucture.
–
Not Selected
Installation of new Torit Donaldson Downflo work station dust collector ,with fire sprinkler ,compressed air and power as necessary .Existing ceiling will be raised 6'-0'' above…
–
Not Selected
Extend rails of an existing crane by approximately 80 feet.Special inspections required .
–
Not Selected
Install new dedicated 208v and 120v circuits & receptacles in the IT IDF rooms . Install one or two 120v , dedicated NEMA 5-20R duplex receptacles.Install ground in each room.
–
Not Selected
This project consists of adding duct heaters to AHU23 & AHU24 outside of building 520 at the northwest corner.
–
Not Selected
Install new roll up door along the west side of building 580.1
–
Not Selected
The projects consists of replacing the 3 main equipment room air handlers and economizer control.
–
Not Selected
This project consists of removing and upgrading existing air handlers AHU-1 ,AHU-3 and AHU-4 that serve building 580
–
Not Selected
Installation of new electrical power feeds to new Boeing equipment
–
Not Selected
install new ventilation including new vans , ductwork and controls to mitgate odor along with pressure control.To be connected to the existing AHU exhaust system.
–
Not Selected
Install catwalk and stairs at paint booth # 2 - spec inspections required by 3rd party for welds.
–
Not Selected
Install new overhead door at B580 column A8 , Include electrical wiring to door control panel ,installed per manufactires specifications .
–
Not Selected
Relocate existing light pole from Boeing - Mesa west parking area to parking area near gate 4. Includes all electrical utilities and infrastructure connected to the new location.
–
Not Selected
Installation of complete and working air conditioning heating and ventilation systems.
–
Not Selected
To install dust collection and sanding system ,to include the vacuum lines,and electrical support to the new equipment.
–
Not Selected
Removal of non bearing partition wall within existing computer room, and all repair modifications.MP&E modifications to upgrade within the new space to accomodate the architectual…
–
Not Selected
Installation of NDT equipment, including MP&E
–
Com (OTH) Renovations or Remodels
Extend concrete equipment pad and install 2 - 1550 gal polypropylene double wall waste water tanks ( u /iib ) adjacent to bldg. 531 Waste treatment area at boeing. To include…
–
Not Selected
Modify kitchen range hoods to minimize short circuiting of make air.Use return air for makeup air for summer mode.Add controls for using existing makeup fan in transitional…
–
Not Selected
Remove existing single framed F/R man door in an existing FR masonary wall. Expand the opening and install a FR hollow metal door in hollow metal frame.
–
Not Selected
New support joist added in order to remove for new oven exhuast duct penetration.Sprinkler pipe and gas line relocation.
–
Not Selected
Provide new structual steel support at south end of canopy for exhuast duct to pentrate roof.Frame enclosure at north end of oven entrance to oven.
–
Not Selected
This project consists of the demolition and removal of paint booth #2 and all associated equipment, fixtures and utilities . Includes removal of existing wall to facilitate…
–
Not Selected
This project is for all the simplex fire alarm device points at boeing site to be communicated to the Boeing southwest region at Seal Beach,California via installation of a…
–
Not Selected
This project consist of adding a temporary exhaust fan system to eliminate odor being generated form print screen machine.
–
Com (OTH) Fire Alarms
Deferred submittal for fire alarm system. All fees paid under mother permit. Ref: bld2012-05727. Modification of existing fire alarm system for a new cmrb spray booth to be…
–
Com (OTH) Fire Sprinklers
Installation of fire sprinkler for a new cmrb spray booth to be located on the northwest quadrant of building 531. Deferred fee paid under mother permit. Ref: bld2012-05727
–
Not Selected
This project consist of installing a new suspended ceiling over the existing equipment arch , install a 3'-0'' diameter x 18'' deep concrete pit and sound deadening devices around…
–
Not Selected
This project consist of renovation to the existing auditorium, including but not limited to area finishes,ceiling ,lighting ,sound system and air condition ductwork.
–
Com (OTH) Remodeling with Addition
This project consist of the installation of a new cmrb prefab/pre-engineered paint booth structure to be located on the NW quadrant of building 531. Fire sprinklers and manual…
–
Not Selected
this project consists of demo fencing ,concretepads and electrical outlets currently located in area for future cmbr paint booth.
–
Not Selected
Existing doors will be re-worked to comply with emergency egress requirements per IBC 2006 section 1005.
–
Not Selected
erect a 2100 square foot tent for 24 hour special use only, by building 520
–
Not Selected
This project consist of removal and replacement of all existing windows on the exterior elevations of building 531.
–
Not Selected
Installation of a new TDF jib crane in building 531.To include electrical and building infrastructure.
–
Not Selected
The project consists of the installation of second row of in rack sprinklers.Location for south bay ASRS in B-543.Increase density of below - deck sprinklers at small mezzanine.
–
Com (PJT) Commercial Buildings
Expedited addenda #2 - modifications to deluge system fire riser in bldg 560 at boeing for new fabric hangar. Ref bld2012-04445 to include : relocation of riser and service line…
–
Com (OTH) Non Structural
This project consist of modifying the kitchen range hood in the building 533.
–
Com (OTH) Fire Alarms
Expedited: deferred submittals for sprinkler design for paint booth #2 replacement. Ref permit bld2012-04540. All deferred fees paid
–
Com (OTH) Fire Alarms
Expedited: deferred submittals for fire alarm system and 1,431 SQ FT paint spray booth #2 in bld 580 ( s-1/f-1 / IIB ) at boeing. Booth dwgs by spray systems includes, conc…
–
Com (PJT) Commercial Buildings
S-expedite addendum #1: for new fabric hangar 563 at boeing ( s-1/ IIB ) changes to include: 15,000 gal cast-in-place under ground concrete containment tank, trench drain…
–
Not Selected
this project consist of the direct replacement of one chilled water pump with associated piping.
–
Not Selected
This project consist of over head crane installtion .. associated with power and the relocation of an existing transformer.
–
Com (OTH) Non Structural
Reference bld2012-04606 modification from or interpretation of table 914.8.2 of the city of mesa amended 2006 ifc which has no provision for a group IV classification of an…
–
Not Selected
This project scope of work consist of enlarging existing opening of 3'-4'' to 6'-4'' wide .
–
Com (OTH) Non Structural
Super expedite - demo existing panit booth #2 ann install new 1,705 SQ FT booth w/ all m/p/e connections at bldg 580 ( s-1/f-1 IIB ) for boeing. To include: removal of exterior…
–
Com (PJT) Commercial Buildings
Super expedited: 32,114 SQ FT prefabricated insulated membrane covered ( group IV ) hangar w/ rigid alum.frame and 25ft bi-fold doors & detatched 202 SQ FT fire equip bldg.564…
–
Not Selected
The scope of work for this project is to modify existing stairway.
–
Com (MSC) Annual Facilities Permit
Afp - this project consist of the relocation of the gfe storage area, the relocation of the fuel farm and the relocation of the pallet compactor
–
Com (MSC) Annual Facilities Permit
Afp - this project consist of removing an existing drying oven located on the southwest quadrant of building 580
–
Not Selected
This project consists of installation of new simplex fire alarm indivdual addressable module status of existing oven over-temperture alarm.
–
Not Selected
Install 3 new water tanks and plumbing at wash rack bay.
–
Not Selected
This project consists of converting conference room into private office and new corridor.
–
Not Selected
The scope of work consists of extending the existing O/H crane 26 feet to the east.Includes installation of support posts, crane rails and associated power.
–
Not Selected
This project consist of removing existing wall,door, and raised floor area,previously used for software lab.The area will be reconfigured into open shop space.
–
Com (MSC) Annual Facilities Permit
Afp - this project consist of intercepting the existing ground grid cable and extending a new ground grid cable to loop the existing utility trench system.
–
Com (MSC) Annual Facilities Permit
Afp - this project consist of demolition of existing door air curtain and installation of new fan coil unit including all associated air ductwork, control and power wiring.
–
Com (OTH) Non Structural
Code modification - modification from construction code 2006 ibc section 412.2.1 for exterior wall installation of new fabric hangar within 30 feet from property line of existing…
–

Checked 2026-10-01 12:28 UTC against Mesa Development Services permit data. Markdown · JSON