5000 E Mcdowell Rd
Building permits, Mesa, AZ
5000 E Mcdowell Rd, Mesa has 200 building permits on record. The most recent, opened Sep 3, 2026, is for commercial or industrial projects: New 12 inch looped fire line extension to provide service connections to Building 570 and a potential expansion.
All permits at this address
| Date | Type | Work | Cost |
|---|---|---|---|
| Commercial or Industrial Projects | New 12 inch looped fire line extension to provide service connections to Building 570 and a potential expansion. | – | |
| Other Commercial | Replace existing site chilled-water supply and return piping serving Buildings 510, 520, 521, 530, 531, 533, 540, 543, 560, 580, 581 and 591, including new isolation valves… | – | |
| Commercial or Industrial Projects | Install canopy over existing Falcon-1 switchgear inside Falcon Substation. | – | |
| Annual Facilities Permit | Annual Facilities Permit for 2026 | – | |
| Commercial or Industrial Projects | Grade and pave area with new asphalt. Renovate retention area. Results in CoC. | – | |
| Commercial or Industrial Projects | Design for a new falcon2 medium voltage switchgear for the new srp transformer. The new switchgear will provide the power feed for the new aca phase 2 and phase 3 addition. | – | |
| Commercial or Industrial Projects | Dewpoint control for building 570. Scope includes addition of a makeup air handler and low temperature chilled water system. Special inspections for steel, concrete, fabrication… | – | |
| Tenant Improvement (Interior Only) | Tenant improvement in existing 158,529 SF, type II-B construction, F1, B and S1 occupancy warehouse to add 4,000 Sf, group B occupancy office mezzanine. Mezzanine to have Open… | – | |
| Commercial or Industrial Projects | New pony chiller and wet side economizer to the existing chiller plant for existing building. New MEP. Special inspections required: concrete construction, expansion bolts, and… | – | |
| Commercial or Industrial Projects | Refer to AFP25-01081: Replace existing elevator equipment | – | |
| Sign Permit | One (1) D/F non-illuminated monument for Boeing, Mesa facility. **It will be placed near the driveway leading to buildings 570 and 571. | – | |
| Commercial or Industrial Projects | New ground up complete buildings. Advance composite fabrication center building occupancy classifications F-1 (main) S-1, B. Construction type IIB. 158,529 s.f. Central Utility… | – | |
| Commercial or Industrial Projects | Site Civil, Landscape, Building Foundation and Plumbing | – | |
| Commercial or Industrial Projects | Removal and replacement of underground medium voltage (MV) cabling up to MV loop switches as well as selected MV cabling from loop switches to XFMRS, where new duct bank sections… | – | |
| Commercial or Industrial Projects | The proposed aircraft rescue and fire fighting (arff) station includes a 14,904 square foot new building and site improvements at a vacant site on boeing's mesa campus. This new… | – | |
| Annual Facilities Permit | Mother Permit for 2019 AFP | – | |
| Other Commercial | AFP18-02178 - The installation of a new 480v feeder from the B-531 outdoor substation (west) to the flight line area near B-535. The service supports the relocation of (2)… | – | |
| Commercial or Industrial Projects | Construct a pre-engineered steel building with concrete pad, column footings, lighting, grounding & lightning protection. Building number 584. Occupancy group S-1, construction… | – | |
| Annual Facilities Permit | Annual facilities permit for the boeing co (mother permit) for 2018 | – | |
| Not Selected | The scope to install sprinkler piping for north side 2nd flr remodeled office area ,To include new piping at acoustical grid ceilings and quick response sprinkler heads .Ref… | – | |
| Not Selected | The scope to install sprinkler piping for east side 2nd flr remodeled office area ,To include new piping at acoustical grid ceilings and quick response sprinkler heads .Ref permit… | – | |
| Not Selected | boeing requesting after hours inspection ( ref permit # bld2017-05126 ) electrical service to re-energize ses for 2nd floor. | – | |
| Not Selected | The scope includes complete renovation ,demo and construction of west end 543.2 2nd flr | – | |
| Not Selected | Set up 30' x 70' tent with tables and chairs for approximately 24 hours.Tent is being used for cafeteria overflow seating . | – | |
| Not Selected | Scope of work to install fire alarm and suppression system for 2nd floor office T/I Ref permit # Bld2017-051126.(east side phase 1 ) | – | |
| Not Selected | Scope of work to install fire alarm and suppression system for 2nd floor office T/I Ref permit # Bld2017-05130.(north side phase 1 ) | – | |
| Not Selected | The project consists of removing Anechoic foam panels ,Add new lighting to existing electrical infrastructure .In fill pits with concrete ( note : will require special inspection… | – | |
| Not Selected | The installation of fire sprinkler system to south canopy extension | – | |
| Not Selected | the scope of work consists of the installation of AHU # 6,15,16,18,21&22 .To Include curb reconstruction with welding ,high strength bolting ( special inspection form required )… | – | |
| Not Selected | The scope of work consists of upgrade and replacement of mechanical and electrical to support lab . | – | |
| Not Selected | Convert manufacturing space into short term tool storage | – | |
| Not Selected | install generator connections boxes to support 531 580 and 541 freezer and chilled water for emergency backup power . | – | |
| Not Selected | remove and replace the current electrical switch and transformer (4160 v -480 v switch gear . | – | |
| Not Selected | Install chain link fence with double gates and access card / demo 2 walls and raised floor. | – | |
| Not Selected | Renovation of area to acccomodate new test equipment and work stations.Includes demolition of walls. | – | |
| Not Selected | The scope is complete renovation of 530.2 northwest end of building 2nd flr.walls ,MP&E connecting to existing infrastructure. Note : fire caulking inspections to be inspected by… | – | |
| Not Selected | The project consists of the installation of a new sink ,elec for new equipment.Work includes M&E to existing infrastructure | – | |
| Not Selected | The scope is complete renovation of 543.2 east end .walls ,MP&E connecting to existing infrastructure. Note : fire caulking inspections to be inspected by 3rd party inspector.Any… | – | |
| Not Selected | Combine 2 spaces into 1 for a totla area of 1006 sqft .Some electircial and HVAC work. | – | |
| Not Selected | Replacement of 2 45 KVA transformers with 2 75 KVA transformers . | – | |
| Not Selected | remove and replace of 7 roof top AHU's | – | |
| Not Selected | installation of newelectrical router and disconnects supporting automated router . | – | |
| Not Selected | remove and replace of 80 ton chiller and all supporting uiltilties . | – | |
| Commercial or Industrial Projects | The addition of 2,896 sf to building 531 for a new transmission testing laboratory. F-1 occupancy to remain. Fire alarm and fire sprinkler systems are deferred submittals. | – | |
| Not Selected | replace existing roof top air handlers on building 530 | – | |
| Not Selected | Replace existing mezzanine building air handlers 21 & 22 | – | |
| Not Selected | This project consists of remodeling an existing 717 sf area of open space into new coffee bar and dismantling ab existing coffee bar 300sf . | – | |
| Not Selected | Installation of three 20' foot high light poles.Electrical supply from Building 541 to thermal storage compartment. | – | |
| Not Selected | Build new hard wall office on second floor building 560 | – | |
| Not Selected | Install man bars in duct work and extend east wall to deck including upgrade of security system. | – | |
| Not Selected | The renovation of restrooms located on 1,2 &3 floor levels . The scope of work includes new plumbing ,lighting and architectual walls and finishes . | – | |
| Not Selected | Removal of existing roof deck , replacement and expansion of canopy structure. | – | |
| Not Selected | This project consists of the 520 south elevator.This will include the cab,hosit way ,pumps and all other associated equipment. | – | |
| Not Selected | This project consists of the modernization of the 543 east elevator.This will include the cab , hoist way , pumps and all other associated equipment . | – | |
| Com (OTH) Plumbing | Afp program: installation of new sewer and cold water lines in the cafeteria building | – | |
| Com (OTH) Renovations or Remodels | Afp program: remove 93000 SQ FT of pavement and replace with new concrete | – | |
| Com (OTH) Renovations or Remodels | Afp program: install a pair of 3'0" wide doors project also includes some electrical work and mechanical work | – | |
| Com (OTH) Non Structural | Permit to set up temporary tent for employees to have lunch in the tent will be in place for 24 hours and have emergency signage. | – | |
| Not Selected | Provide fire protection for spray booth refrerence permit # bld2016-05708 | – | |
| Not Selected | The project consists of adding fire protection and electrical for mezzanine including existing infrastructure for utilities. | – | |
| Not Selected | remove replace exterior MDP 5 switch gear . located west of building 531 on west side .Includes all utilities. | – | |
| Com (OTH) Fire Alarms | Afp project: modify existing fire alarm system | – | |
| Com (OTH) Fire Sprinklers | Afp project: modify existing wet pipe system | – | |
| Not Selected | The scope of work consists of the installation 16'x16'x35' enclosed spray booth and connected to existing infrastructure.per 2006 ICC codes, Fire CD required - deferred submittal… | – | |
| Not Selected | Remove wash down process and provide for oil seperator for the wash down effluent. | – | |
| Not Selected | The scope of work is to bring all sidewalks, ramps and approaches up to current ADA requirements to and from buildings 540,541,543 and 533. | – | |
| Com (OTH) Renovations or Remodels | Scope of work to renovate 10,692 sqft office and data center space located in building 510.To include 6" raised computer floor ,new wall coverings,acoustical suspended ceilings… | – | |
| Com (OTH) Electrical | Installation of new 120/208 electrical power panel to provide necessary power to new mechanical equipment in room G109 of building 531. Electrical install includes step up… | – | |
| Com (OTH) Mechanical | This project consists of replacing all the pumps and mechanisms for the elevators 1& 2 in building 530.This also includes the interior of the elevator car but not the car shell. | – | |
| Not Selected | This project involves the removal and replacement of roof mounted air handler units AHU 15-16-17-18--32.Project includes new walls ,HVAC equipment and new MP&E utilities. | – | |
| Not Selected | This project involes the replacement of the air handler units AHU-3 and AHU-5 in building 531.Scope of work includes structual and MP&E. | – | |
| Com (OTH) Renovations or Remodels | Renovation of existing 10,692 s.f. For office space aft project; located in building 510. Occupancy unchanged. New 6" floor, wall coverings and ceilings. Mechanical, electrical &… | – | |
| Not Selected | Early fire protection system modifications to allow for demolition to procede while maintaining halon fire protection systems in adjoining areas | – | |
| Not Selected | This project consists of the removal of AHU 7 & 12 with the replacement of the units in the same location with new chilled water lines,duct work and electrical including… | – | |
| Not Selected | This project consists of the removal of AHU units 20-21-28 with the replacement of the units listed with new chilled water lines,duct work and electrical including supporting… | – | |
| Not Selected | Construct new light manufcturing room includes walls,doors, mechanical,air vacuum lines,electrical .area of improvement 13,785 sf. | – | |
| Not Selected | This project consists of setting up a temporary tent for employees to have lunch.the tent wil be in place for only 24 hrs and have exit signs and fire extinguishers place… | – | |
| Com (OTH) Electrical | Afp for surge protectors on panels | – | |
| Com (OTH) Public Works or Utilities | Super expedite - removal of boeing fire water backflow and capping of valve located on mcdowell rd | – | |
| Not Selected | Demo existing restrooms to the frame and renovate with new piping . fixtures ,walls ,tile and drainage | – | |
| Not Selected | Replacement of make up air unit and associated ductwork located on the roof of 531 south , serving the paint shop area 1st floor. | – | |
| Not Selected | Replacement of fan coil units and associated ductwork located on the mezzanine floor of B531,serving trim and grind areas in 1st floor. | – | |
| Not Selected | This project consists of remodeling and modernize 530 west elevator with new equipment in order to meet current code requirements. | – | |
| Not Selected | Installation of new 30KVA /XMFR and 480v-3PH 208/120V -3PH SEC for metrology lab.provide fire cd | – | |
| Not Selected | This project is to install all new elevator equipment including mechanical ,electrical and fire alarm devices required . Elevator must be inspected and certified by state elevator… | – | |
| Not Selected | Remodel of 300 sf executive kitchen to include new cabinets counters,appliances ,ceiling and new residential exhaust hood for fume removal. | – | |
| Not Selected | Reconfigure HVAC in two flight monitioring labs to increase cooling to the rooms. | – | |
| Not Selected | Relocate three exhaust fans between AHU 12 and AHU 14 . | – | |
| Not Selected | Replacement of AHU-2 and all associated ductwork located on 2nd floor of B580 east and all utilities and fire alarms devices connected to this equipment. | – | |
| Not Selected | This project consists of the installation on new under ground fire sprinkler recovery tank and piping or connected to the tank. | – | |
| Not Selected | this project consists of the demo of existing freezer and installation of new freezer. | – | |
| Not Selected | The scope of work includes demo of existing showers,interior walls -waste lines -new supply lines to new bathroom toilets and urinals - also electrical and mechanical. | – | |
| Not Selected | This project consists of relocating three existing rack power receptacles .Povide install four L6_20R receptacles on two new circuits.gound and bond cable trays per NEC 250.8 | – | |
| Not Selected | This project consists of demo existing ahu,chilled water lines,duct work ,electrical.To include installation of new AHU with chilled water lines,duct work ,fire sprinklers and… | – | |
| Not Selected | Remove and replace of north campus air compressor with 300HP 480 V 3P, 600A/3P disconnect - New dryer 480V/3P , also to include all supporting utilities . | – | |
| Not Selected | The scope of work for this project is the installation of electrical connection to a 28 kw , 480 V electric duct heater . | – | |
| Not Selected | Renovation of existing washer and dryer conversion to new emergency shower | – | |
| Not Selected | Relocate 4 existing pendent sprinklers to accomadate new ceiling tile.Install 8 upright sprinklers in new equipment pit - extend piping from existing overhead piping to supply… | – | |
| Not Selected | provide modifications to existing pump house .Second roof top exhuast fan and supporting utilities. | – | |
| Not Selected | This project consists of the expansion of the screen printing process.Providing support for additional equipment inculdes modifications to MP&E to existing infrastructure.Deffered… | – | |
| Not Selected | Remove and replace existing 15kv rated switch gear line up, construction of concrete pad and retaining wall also install grounding electrodes. | – | |
| Not Selected | This project consists of setting up a temporary tent for employee lunch.the tent will be in place for approximately 24 hours and will have exit signs and frire extinguishers. | – | |
| Not Selected | This project consists of the demo of area between column line A - B - 3 thru 2.3 .Walls will be modified for new training room to include mechanical ,electrical and all supporting… | – | |
| Not Selected | This project consists of the removal of 2 ton crane and upgrade under hung crane framework for 3 ton crane system. All supporting utilities to upgraded to meet new 3 ton crane… | – | |
| Com (OTH) Fire Sprinklers | Fire sprinklers in new fiber placement clean room | – | |
| Not Selected | This project consists of structures lab improvements to accomodate new test equipment.Improvements include modifications to existing masonry structure for control room… | – | |
| Not Selected | This project consists of demo on existing mechanical and electrical also the installation of new mechanical and electrical for oil/water separator system . | – | |
| Not Selected | This project consitis of demo on mechanical and electrical.Install new 5'' schedule 160 A106 supply piping ,pump instrumentation controls,Hydraulic piping ,guard rails ,HPU… | – | |
| Not Selected | The project consists of re- routing conduit from underground to outside the building and fasten to exterior walls.The conduit and new feeders will be installed from MDP5 main… | – | |
| Com (OTH) Non Structural | The concrete driveway off mcdowell rd into the boeing facifility will be modified to remove the raised curb (hump) between the entrance and exit driveway. Concrete will be… | – | |
| Not Selected | Remodel 10,386 sf of existing warehouse area on the northwest corner of the building 543 . The scope involves architectural, mechanical and electrical modifications. | – | |
| Not Selected | Install new 2.0'' dia. PE natural gas line extension from existing riser location located at building 510 . Route and connect to existing 2'' PE gas line near NWC of B 510. | – | |
| Not Selected | Remodel 8,129 sf of existing warehouse area in the northwest corner of building 543.1 the scope involves architectural,mechanical and electrical modifications. | – | |
| Not Selected | Structures lab improvements to accomadaste new test equipment.Structual requirements for new equipment pit and utility trenches. | – | |
| Not Selected | Remove the southeast gym doors.Modify wall.work includes structual and electrical utilities. | – | |
| Com (OTH) Renovations or Remodels | Building 543 - modifications for a 13,000 SQ FT, class 100,000 clean room, f-1 occupancy classification, construction type IIIB, within existing warehouse area on the northeast… | – | |
| Com (MSC) Annual Facilities Permit | Afp - repair existing storm drain. Increase size of existing storm drain outlet. Clean and refurbish 3 existing drywells t adeq standards. | – | |
| Not Selected | Installing new test headers (5) and protectowire linear heat detection system . Occupancy group B2 ,F1,S5,H2,H7 Type II-B | – | |
| Not Selected | To renovate all restrooms in building 530 on 1st 2nd & 3rd floors.This scope of work includes demo ,relocation waste drain plumbing ,domestic water lines all supporting utilities… | – | |
| Not Selected | renovation of existing training rooms "B" occupancy to remain . | – | |
| Com (OTH) Public Works or Utilities | Redesign of existing mcdowell driveway entrance that connects the site access road to the boeing gate 2 security checkpoint. The entry will be modified to conform to current city… | – | |
| Not Selected | Install new private 2'' diameter gas service line extension and riser for future connection to building 543.Provide stub at south end of new line for future connection to existing… | – | |
| Not Selected | Remove existing paint water spray booth and related utilities.Replace with new 10'x10'x20' ID paint water spray booth to include explosion proof horn strobe notification device… | – | |
| Not Selected | Provide electrical utilities and connect to existing infrastructure for P8 simulator .Upgrade and install NEMA L6 -20R single receptacle under raised floor for rack cord… | – | |
| Not Selected | Pa system upgrade to existing infrastructure and utilities.The scope work includes upgrades for for buildings 531 and 543. | – | |
| Not Selected | installation of three temporary tents for special event from 3/19/ to 3/23. | – | |
| Com (OTH) Deferred Fire Sprinklers | Deferred fire sprinklers | – | |
| Com (OTH) Renovations or Remodels | Pbi renovation of existing breakroom, office space and restroom. New shower, cabinets, relocate sinks, new washer and dryer, new fridge, electrical, mechanical and plubming. | – | |
| Com (OTH) Fire Sprinklers | Fire sprinklers for duct. | – | |
| Com (OTH) Mechanical | Afp - replace air handling units ahu-19 & 23 and provide odor mitigation | – | |
| Com (MSC) Annual Facilities Permit | Install new ceiling grid and tiles | – | |
| Com (MSC) Annual Facilities Permit | Demo masonary wall cut new opening in concrete wall and add door to exit way | – | |
| Com (MSC) Annual Facilities Permit | A temporary tent will be erected for approximately 36 hours to accommodate cafeteria overflow for employee appreciation luncheon. Tent is 30x70 and will seat a maximum of 126… | – | |
| Com (OTH) Renovations or Remodels | Renovation of office space into sleeping units for boeing fire responders. Change of occupancy classification requires room to be separated from adjacent occupancies by 1-hr fire… | – | |
| Not Selected | The scope of work includes the demo of the first floor,renovation of suspended ceilings,installation of exhaust system from IR machine to south end of building,Electrical… | – | |
| Com (OTH) Renovations or Remodels | Install 5-axis router and new dust collection system and relocate furniture within 2500 SQ. FT Area of type IIB construction, that is fire sprinklered and fire alarmed. Spark… | – | |
| Not Selected | Replace A/C units within computer rooms, Connected to existing electrical and utility infrastructure. | – | |
| Com (PJT) Commercial Buildings | Expedited: 1,300 SQ FT single story masonry pump house#1 bldg#552 w/ roof equipment & access/guards ( s-2/ VB ) and 500,000 gal 4,660 SQ FT concrete fire water tank ( u/vb ) w/… | – | |
| Not Selected | Project consists of adding fall protection railing where antennas are located. | – | |
| Not Selected | Renovation of 32,000 sf within building 520 to include : Relocation of cable trays ,new power drops ,replacement of high bay fixtures and new compressed air drops. | – | |
| Not Selected | Work involves mounting a steel constructed awning to a steel frame of the existing building structure ,The Awning extension will cover that portion of the oven not covered by the… | – | |
| Not Selected | Minor interior renovation of 5,888 SF within existing building 510 with an exterior terrace addition. | – | |
| Not Selected | Modifications to AHU-4 & MUA -25 in building 531 , AHU-4 & MUA -25 will be removed and replaced.All electrical and utilities will be connectecd to the existing infrastucture. | – | |
| Not Selected | Installation of new Torit Donaldson Downflo work station dust collector ,with fire sprinkler ,compressed air and power as necessary .Existing ceiling will be raised 6'-0'' above… | – | |
| Not Selected | Extend rails of an existing crane by approximately 80 feet.Special inspections required . | – | |
| Not Selected | Install new dedicated 208v and 120v circuits & receptacles in the IT IDF rooms . Install one or two 120v , dedicated NEMA 5-20R duplex receptacles.Install ground in each room. | – | |
| Not Selected | This project consists of adding duct heaters to AHU23 & AHU24 outside of building 520 at the northwest corner. | – | |
| Not Selected | Install new roll up door along the west side of building 580.1 | – | |
| Not Selected | The projects consists of replacing the 3 main equipment room air handlers and economizer control. | – | |
| Not Selected | This project consists of removing and upgrading existing air handlers AHU-1 ,AHU-3 and AHU-4 that serve building 580 | – | |
| Not Selected | Installation of new electrical power feeds to new Boeing equipment | – | |
| Not Selected | install new ventilation including new vans , ductwork and controls to mitgate odor along with pressure control.To be connected to the existing AHU exhaust system. | – | |
| Not Selected | Install catwalk and stairs at paint booth # 2 - spec inspections required by 3rd party for welds. | – | |
| Not Selected | Install new overhead door at B580 column A8 , Include electrical wiring to door control panel ,installed per manufactires specifications . | – | |
| Not Selected | Relocate existing light pole from Boeing - Mesa west parking area to parking area near gate 4. Includes all electrical utilities and infrastructure connected to the new location. | – | |
| Not Selected | Installation of complete and working air conditioning heating and ventilation systems. | – | |
| Not Selected | To install dust collection and sanding system ,to include the vacuum lines,and electrical support to the new equipment. | – | |
| Not Selected | Removal of non bearing partition wall within existing computer room, and all repair modifications.MP&E modifications to upgrade within the new space to accomodate the architectual… | – | |
| Not Selected | Installation of NDT equipment, including MP&E | – | |
| Com (OTH) Renovations or Remodels | Extend concrete equipment pad and install 2 - 1550 gal polypropylene double wall waste water tanks ( u /iib ) adjacent to bldg. 531 Waste treatment area at boeing. To include… | – | |
| Not Selected | Modify kitchen range hoods to minimize short circuiting of make air.Use return air for makeup air for summer mode.Add controls for using existing makeup fan in transitional… | – | |
| Not Selected | Remove existing single framed F/R man door in an existing FR masonary wall. Expand the opening and install a FR hollow metal door in hollow metal frame. | – | |
| Not Selected | New support joist added in order to remove for new oven exhuast duct penetration.Sprinkler pipe and gas line relocation. | – | |
| Not Selected | Provide new structual steel support at south end of canopy for exhuast duct to pentrate roof.Frame enclosure at north end of oven entrance to oven. | – | |
| Not Selected | This project consists of the demolition and removal of paint booth #2 and all associated equipment, fixtures and utilities . Includes removal of existing wall to facilitate… | – | |
| Not Selected | This project is for all the simplex fire alarm device points at boeing site to be communicated to the Boeing southwest region at Seal Beach,California via installation of a… | – | |
| Not Selected | This project consist of adding a temporary exhaust fan system to eliminate odor being generated form print screen machine. | – | |
| Com (OTH) Fire Alarms | Deferred submittal for fire alarm system. All fees paid under mother permit. Ref: bld2012-05727. Modification of existing fire alarm system for a new cmrb spray booth to be… | – | |
| Com (OTH) Fire Sprinklers | Installation of fire sprinkler for a new cmrb spray booth to be located on the northwest quadrant of building 531. Deferred fee paid under mother permit. Ref: bld2012-05727 | – | |
| Not Selected | This project consist of installing a new suspended ceiling over the existing equipment arch , install a 3'-0'' diameter x 18'' deep concrete pit and sound deadening devices around… | – | |
| Not Selected | This project consist of renovation to the existing auditorium, including but not limited to area finishes,ceiling ,lighting ,sound system and air condition ductwork. | – | |
| Com (OTH) Remodeling with Addition | This project consist of the installation of a new cmrb prefab/pre-engineered paint booth structure to be located on the NW quadrant of building 531. Fire sprinklers and manual… | – | |
| Not Selected | this project consists of demo fencing ,concretepads and electrical outlets currently located in area for future cmbr paint booth. | – | |
| Not Selected | Existing doors will be re-worked to comply with emergency egress requirements per IBC 2006 section 1005. | – | |
| Not Selected | erect a 2100 square foot tent for 24 hour special use only, by building 520 | – | |
| Not Selected | This project consist of removal and replacement of all existing windows on the exterior elevations of building 531. | – | |
| Not Selected | Installation of a new TDF jib crane in building 531.To include electrical and building infrastructure. | – | |
| Not Selected | The project consists of the installation of second row of in rack sprinklers.Location for south bay ASRS in B-543.Increase density of below - deck sprinklers at small mezzanine. | – | |
| Com (PJT) Commercial Buildings | Expedited addenda #2 - modifications to deluge system fire riser in bldg 560 at boeing for new fabric hangar. Ref bld2012-04445 to include : relocation of riser and service line… | – | |
| Com (OTH) Non Structural | This project consist of modifying the kitchen range hood in the building 533. | – | |
| Com (OTH) Fire Alarms | Expedited: deferred submittals for sprinkler design for paint booth #2 replacement. Ref permit bld2012-04540. All deferred fees paid | – | |
| Com (OTH) Fire Alarms | Expedited: deferred submittals for fire alarm system and 1,431 SQ FT paint spray booth #2 in bld 580 ( s-1/f-1 / IIB ) at boeing. Booth dwgs by spray systems includes, conc… | – | |
| Com (PJT) Commercial Buildings | S-expedite addendum #1: for new fabric hangar 563 at boeing ( s-1/ IIB ) changes to include: 15,000 gal cast-in-place under ground concrete containment tank, trench drain… | – | |
| Not Selected | this project consist of the direct replacement of one chilled water pump with associated piping. | – | |
| Not Selected | This project consist of over head crane installtion .. associated with power and the relocation of an existing transformer. | – | |
| Com (OTH) Non Structural | Reference bld2012-04606 modification from or interpretation of table 914.8.2 of the city of mesa amended 2006 ifc which has no provision for a group IV classification of an… | – | |
| Not Selected | This project scope of work consist of enlarging existing opening of 3'-4'' to 6'-4'' wide . | – | |
| Com (OTH) Non Structural | Super expedite - demo existing panit booth #2 ann install new 1,705 SQ FT booth w/ all m/p/e connections at bldg 580 ( s-1/f-1 IIB ) for boeing. To include: removal of exterior… | – | |
| Com (PJT) Commercial Buildings | Super expedited: 32,114 SQ FT prefabricated insulated membrane covered ( group IV ) hangar w/ rigid alum.frame and 25ft bi-fold doors & detatched 202 SQ FT fire equip bldg.564… | – | |
| Not Selected | The scope of work for this project is to modify existing stairway. | – | |
| Com (MSC) Annual Facilities Permit | Afp - this project consist of the relocation of the gfe storage area, the relocation of the fuel farm and the relocation of the pallet compactor | – | |
| Com (MSC) Annual Facilities Permit | Afp - this project consist of removing an existing drying oven located on the southwest quadrant of building 580 | – | |
| Not Selected | This project consists of installation of new simplex fire alarm indivdual addressable module status of existing oven over-temperture alarm. | – | |
| Not Selected | Install 3 new water tanks and plumbing at wash rack bay. | – | |
| Not Selected | This project consists of converting conference room into private office and new corridor. | – | |
| Not Selected | The scope of work consists of extending the existing O/H crane 26 feet to the east.Includes installation of support posts, crane rails and associated power. | – | |
| Not Selected | This project consist of removing existing wall,door, and raised floor area,previously used for software lab.The area will be reconfigured into open shop space. | – | |
| Com (MSC) Annual Facilities Permit | Afp - this project consist of intercepting the existing ground grid cable and extending a new ground grid cable to loop the existing utility trench system. | – | |
| Com (MSC) Annual Facilities Permit | Afp - this project consist of demolition of existing door air curtain and installation of new fan coil unit including all associated air ductwork, control and power wiring. | – | |
| Com (OTH) Non Structural | Code modification - modification from construction code 2006 ibc section 412.2.1 for exterior wall installation of new fabric hangar within 30 feet from property line of existing… | – |
Checked 2026-10-01 12:28 UTC against Mesa Development Services permit data. Markdown · JSON